Forwards Insp Repts 50-498/88-05 & 50-499/88-05 on 880119-22 & Notice of Deviation
ML20148B020
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 03/15/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20148B023 List:
References
NUDOCS 8803210312
Download: ML20148B020 (2)


See also: IR 05000498/1988005

Text

w ,

MAR I 51988

In Reply Refer To:

Dockets: 50-498/88-05

50-499/88-05

Houston Lighting & Power Company

ATTN: J. H. Goldberg, Group Vice

President, Nuclear

P.O. Box 1700

Houston, Texas 77001

Gentlemen:

This refers to the inspection conducted by Mr. G. A. Pick of this office during

the period January 19-22, 1988, of activities authorized by NRC Operating

License NPF-71 and Construction Permit CPPR-129 for the South Texas Project

Electric Generating Station, Units 1 and 2, and to the discussion of our

findings with members of your staff at the conclusion of the inspection.

The area examined during the inspection was implementation of Generic

letter 81-21, "Natural Circulation Verification." Within this area, the

inspection consisted of selective examination of procedures and representative

records, interviews with personnel, and observations by the NRC inspector. The

inspection findings are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities appeared to

deviate from commitments made to the NRC. This item and reference to the

commitments are identified in the enclosed Notice of Deviation. You are

requested to respond to this deviation in writing. Your response should be

based on the specifics contained in the Notice of Deviation enclosed with this

letter.

One unresolved item is identified in paragraph 2 of the enclosed inspection

report.

The response requested by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original Signed By

L. J. Callan

L. J. Callan, Director

/DivisionofReactorProjects

Enclos res: (see next age)

  • RIV:R * C:0PS / / C:PSD 0:DRh Reconc

JEGagl i o JMLilhoan GLCon able LJCallan JEGagl' rdo

hGAPic) !f

13 / n/ 8 g /n / 3//88 3 /d /88 j /g /88 y /jg/

  • previously concurred

eea n os a se mis

PDR ADOCK 05000498

$ I

O DCD

_ __-__ - _. __ _ __ _ _ _ _ - . . _ _ _ _ - _ _ _ _ _ _ _ _ - _ . -- _ _ - _ .

L r. o.' ,

,

I

Houston Lighting & Power Company -2-

Enclosures:

1. Appendix A - Notice of Deviation

2. Appendix B - NRC Inspection Report

50-498/88-05

50-499/88-05

cc w/ enclosures:

Houston Lighting & Power Company

ATTN: M. A. McBurnett, Manager

Operations Support Licensing

P.O. Box 289

Wadsworth, Texas 77483'

Houston Lighting & Power Company

ATTN: Gerald E. Vaughn, Vice President

Nuclear Operations

P.O.. Box 1700

Houston, Texas 77001

Houston Lighting & Power Company

ATTN: S. L. Rosen

P.O. Box 289

.Wadsworth, Texas 77483

Central Power & Light Company

ATTN: R. L. Range /R. P. Verret

P.O. Box 2121

Corpus Christi, Texas 78403

City Public Service Board

ATTN: R. J. Costello/M. T. Hardt

P.O. Box 1771

San Antonio, Texas 78296

City of Austin Electric Utility

ATTN: R. J. Miner, Chief Operating

Officer

721 Barton Springs Road

Austin, Texas 787C4

Texas Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • DRP *RRI-0PS

R. D. Martin, RA *DRS

  • SectionChief(DRP/D) *RPSB-DRSS
  • MIS System *RIV File

Lisa Shea, RM/ALF *RSTS Operator

R. Bachmann, 0GC *D. Hunnicutt

  • P. Kadambi, NRR Project Manager *R. Hall -
  • TSS D. Powers
  • G. Pick
  • w/766 - - - . - . . _ _ _ . . - - - -- - - .

. . .