05000327/LER-1997-007, Forwards LER 97-007-00,providing Details Re Start of Three Available Diesel Generators Occurring as Result of Cable That Was Cut While Drilling Hole in Control Room Electrical Panel

From kanterella
(Redirected from ML20147J416)
Jump to navigation Jump to search
Forwards LER 97-007-00,providing Details Re Start of Three Available Diesel Generators Occurring as Result of Cable That Was Cut While Drilling Hole in Control Room Electrical Panel
ML20147J416
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 05/01/1997
From: Adney R
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20147J419 List:
References
NUDOCS 9705070143
Download: ML20147J416 (2)


LER-1997-007, Forwards LER 97-007-00,providing Details Re Start of Three Available Diesel Generators Occurring as Result of Cable That Was Cut While Drilling Hole in Control Room Electrical Panel
Event date:
Report date:
Reporting criterion: 10 CFR 50.73(a)(2)(iv), System Actuation
3271997007R00 - NRC Website

text

4 Tennessee Valley Authority, Post Offce Sox 2000, Soddy-Daisy. Tennessee 37379-2000 R.J. Adney Site Vce Presidr<it Sequoyah Nuclear Plant May 1,1997 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 Gentlemen:

TENNESSEE VALLEY AUTHORITY - SEQUOYAH NUCLEAR PLANT (SQN)

UNITS 1 AND 2 - DOCKET NOS 50-327 AND 50-328 - FACILITY OPERATING LICENSES DPR-77 AND DPR LICENSEE EVENT REPORT (LER) 50-327/97007 The enclosed report provides details concerning the start of the three available diesel generators that occurred as the result of a cable that was cut while drilling a hole in a control room electrical panel. The report also provides details of an event that occurred during the repair activities of the damaged cable that also resulted in the start of the three available diesel generators. This report is being reported in accordance with 10 CFR 50.73(a)(2)(iv) as a condition that resulted in the actuation of engineered safety features.

Sincerely, R.. Adney cc: See page 2

/

~p,;, g Enclosure J

/

.an%2 lll llllli lid ((ll.tl ll ll (ll l

9705070143 970501 PDR ADOCK 05000327:

I i

I il 31 S

PDR w - =-==

.J

U.S. Nuclear Regulatory Commission Page 2 i

May 1,1997 1

4 e

Enclosure i

cc (Enclosure):

INPO Records Center Institute of Nuclear Power Operations 700 Galleria Parkway Atlanta, Georgia 30339-5957 Mr. R. W. Hernan, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852-2739 NRC Resident Inspector Sequoyah Nuclear Plant i

i 2600 Igou Ferry Road Soddy-Daisy, Tennessee 37379-3624 Regional Administrator U.S. Nuclear Regulatory Commission Region II

)

61 Forsythe St., SW, Suite 23T85 Atlanta, Georgia 30323-2711 4

)

i 1

M