ML20147H174
| ML20147H174 | |
| Person / Time | |
|---|---|
| Site: | Byron |
| Issue date: | 01/14/1988 |
| From: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20147H179 | List: |
| References | |
| NUDOCS 8801220244 | |
| Download: ML20147H174 (2) | |
See also: IR 05000454/1987027
Text
a
,
- .
v
'
..
..
JAN 141988
.
'
Docket No. 50-454
Docket No. 50-455
Commonwealth Fdison Company
ATTN:
Mr. Cordell' Reed
Senior Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Mr. Z. Falevits
of this office on July 7-9, 1987, of activities at Byron Nuclear Power
Station, Units 1 and 2, and on August 20-21, 1987 at your corporate office,
authorized by NRC Operating Licenses No. NPF-37 and No. NPF-66, and to the
discussion of our findings with Mr. R. E. Querio and other members of your
staff at the conclusion of the inspection.
This inspection was conducted to
evaluate electrical maintenance surveillance activities and licensee actions
regarding the installation of non-seismically qualified components in the
control circuitry for the Emergency Diesel Generators.
The enclosed copy of our inspection report identifies areas examined during
the inspection.
Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
During this inspection, certain of your activities appeared to be in violation
of NRC requirements, as specified in the enclosed. Notice.
A written response
is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC Public Document Room.
The responses directed by this letter and the accompanying Notice (Order)
are not subject to the clearance procedures of the Office of Management
and Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
8801220244 880114
ADOCK 05000454
t
0
"
l
1E O!
-
.
~.
=.
.
-
-.
.
-
.
.
.
.
,
fbb 14
Commonwealth Edison Company
2
We will gladly discuss any. questions you have concerning.this inspection.
Sincerely,
.Criginal Sigr,cd by J. J.'llarricon
J. J. Harrison, Chief
Engineering Branch
Enclosures:
1.
2.
Inspection Reports
No. 50-454/87027(DRS);
No. 50-455/87025(0RS)
cc w/ enclosures:
D. Butterfield, Nuclear
. Licensing Manager
V. I. Schlosser, Project Manager
Gunner Sorensen, Site Project
Superintendent
R.- E. Querio, Plant Manager
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII Byron
Resident Inspector, RIII
Braidwood
D. W. Cassel, Jr., Esq.
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
Diane Chavez, DAARE/ SAFE
Steve Lewis, 0GC
L. 01shan, NRR LPM
H. S. Taylor, Quality Assurance
Division
na
T*
RIII
RIII
III
F
s/ jaw
Gardqer
inds
Harrjson
I
t\\\\itd_
i 14lit
t i[l99
u
--
_
_
.