Forwards Rev 3 to NMPC-QATR-1, QA Program Topical Rept for Nine Mile Point Nuclear Station Operations. Revs Include Corporate Reporting,Responsibility Changes & General Descriptions of Responsibilities for Organizations
ML20147G571
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 01/15/1988
From: Jamila Perry
NIAGARA MOHAWK POWER CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
Shared Package
ML20147G575 List:
References
NMP1L-0215, NMP1L-215, NUDOCS 8801220146
Download: ML20147G571 (5)


Text

, _ _ _ - _ _ - _ _ _

1 y

[

(

NIAGARA MOH AWK POWER CORPORATION NIAGARA MOHAWK 300 ERIE SOULEVARO WEST STRACUSE.N.Y 43204 VICE Pfit$iDilif-QUAUTV ASSJWeCE January 15, 1988 NMPIL 0215 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Re: Nine Mile Point Unit 1, Document No. 50 220, DPR 63 Nine Mile Point Unit 2, Document No. 50-410, NPF-69 Gentlemen:

Transmitted herewith is Revision 3 of the Quality Assurance Topical Report for Nine Mile Poir.t Nuclear Station Operations (QATR 1). This revisian incor-porates changes to the Quality Assurance Program since the issuance of Revision

2. These changes are being submitted in accordance with the requirements of 10CFR50.54(a)(3). The revisions include Corporate reporting and responsibility changes as well as general descriptions of responsibilities for organizations not previously identified. Other changes were incorporated to more precisely define commitments. The revised text has been noted by the application of vertical lines in the outer margins.

For your convenience we have included Attachment 1, a detailed summary of changes.

These changes can be described as general updates and clarifications that do not reduce previous commitments. If you have any questions, please contact the undersigned.

Sincerely, NIAGARA MOHAWK POWER CORPORATION we'((, <

ames A. Perry ice President Quality Assurance JAP /pjg Attachment ec: Regional Administrator, Region 1 W. A. Cook, Sr. Resident Inspector R. A. Capra, Project Director M. F. Haughey, Project Manager (Unit 2)

R. A. Benedict, Project Manager (Unit 1)

P. K. Eapen, Region I h

80012201 DR ADOCK 4 gB011%0

o q

ATTACHMENT 1

SUMMARY

OF CHANGES NMPC QUAllTY ASSURANCE TOPICAL REPORT for NINE MILE POINT NUCLEAR STATION OPERATIONS QATR-1, REVISION 3 l

The signature page has been revised to include a summary of changes and expanded titles for Senior Management.

Subsection 1.1 has been expanded to include Nuclear Engineering &

licensing as an organizational unit.

Subsection 1.2.1 has been revised to address corporate organizational changes.

Subsection 1.2.2 has been revised as follows:

i o 1.2.2.A, B, and C - "Senior Vice President responsible for Nuclear  ;

Operations" has been changed to "Senior Vice President - Nuclear",

o 1.2.2.B.4 "Technical Superintendent - Nuclear Generation" has been -

revised to "Technical Superintendent - Nuclear".

'1 o 1.2.2.C.4 has been expanded to more accurately describe Nuclear Staff Services responsibilities. '

o 1.2.2.D has been added to provide a description of responsibilities

, for the "Manager Nuclear Security".

Subsection 1.2.3 has been revised as follows:

o 1.2.3.A "Senior Vice President" has been revised to "Senior Vice President - Technical Services".

t 3

o 1.2.3.A.2 has been revised to include an additional Materials -

l Management position, "Manager - Generation Materials Management".

i

! o 1.2.3.A.3 has been added to provide a description of responsi-bilities for the "Manager Fuel Purchasing".  !-

4 o 1.2.3.B "Senior Vice President" has been revised to "Senior Vice '

! President - Regional".

! Page 1 of 4 r

! i I  !

'e, S

i.

o 1.2.3.B and 1.2.3.B.1 - "Vice President - Regional Operations" has been revised to "Vice President - Regional Operations Central".

o 1.2.3.C "Senior Vice President" has been revised to "Senior Vice President - Regional",

i o 1.2.3.C and 1.2.3.C.1 "Vice President System Electric Operations" '

has been changed to "General Manager - System Electric Operations".

o 1.2.3.0 has been revised as follows:

"Construction Services" has been changed to "Nuclear Construction Services".

"The Project Management Section" iias been changed to the "Construction Services Department",

o 1.2.3.D.1 "Manager Project Management" has been changed to "Vice President - Engineering".

Subsection 1.2.4 has been revised as follows:

o 1.2.4.A has been revised to reflect a reporting change for the Vice President- Quality Assurance. The position, formerly reporting to the President, now reports to the Executive Vice President.

o 1.2.4.A.1 has been revised to include "waste handling",

o 1.2.4.B has been revised to add the responsibilities of the "Mcnager Quality First Program". The responsibilities of the "Manager Nucleap Quality Assurance Operations", previously described in paragraph 1.2.4.B. are now contained in 1.2.4.C.

o 1.2.4.C, Part 6, has been revised to reflect added activity "h.",

"NRC Correspondence",

o 1.2.4.C, Part 7, has been revised to reflect the responsibilities of a the "Supervisor Quality Engineering / Control". These responsi-

^

bilities, previously describsa in paragraph 1.2.4.B. Parts 7 and 9 under separate Supervisory sections, have now been combined under one Supervisor with several changes as follows:

Quality ingineering

- "NRC cotrespondence and comment coordination" has been deleted; Responsibility for co.: tractor monitoring, previously found under i item "f" of Revision 2 has been relocated to item "h"; '

- Item "f" has been revised to describe inspection planning

! activities; "Work Requests processing" has been revised to "Work Request  !

i

^

acceptance review";  :

- Item "i" has been added;  :

l Page 2 of 4

k l <

1 l Quality Control l

- The description of inspection types has been broadened;

- The following items found in Revision 2 have been deleted:

o "Management of QC associated with selected outage work";

o "NDE procedure development and qualification";

o "Section XI - In-Service Inspection";

o "Maintenance Procedure Review", and o "Inspection Procedures and checklist development";

- "Inspection services contract input" and "Work Regtlest processing" have been added.

o 1.2.4.C, Part 8, has been revised to reflect added responsibility areas "i" through "1".

The Organization Chart, Figure 1-1, and Responsioility Matrix, Figure 1-2, have been updated to reflect organization changes described within the text.

Subsection 2.2.8 has been expanded to include "Inspection- of Radwaste shipments by Quality Control".

Paragraph 2.2.9.c has been revised to include "Fuel Purchasing Procedures".

Paragraph 2.2.11.a -

"Engineering" has been revised to "Nuclear Er.3ineering".

Subsection 15.1 has been expanded to more clearly describe '

n9nconformances.

Subsection 15.2.5 "Upper management" has been revised to "Senior Plant and Corporate Management".

Subsection 17.2.5 has been expanded to more accurately describe the forms in which QA records are maintained.

Appendix B has been revised as follows:

o Exceptions to ANS 3.2-82, Paragraph 5.2.7 have been relocated within Appendix B to appear in the same order as the referenced paragraph appears in ANS 3.2-82. All other entries have been re-lettered accordingly.

o Exception "3.1." has been added to clarify our commitment to AN:

N45.2.5-1974.

o Exceptions "3.o." or "3.r." were previously coinbined with an exception to ANS 3.2-82, Paragraph 5.2.7. The exception to 5.2.7 has bee; deleted from items "3.o." or "3.r." ard relocated as described above.

p:.ge 3 of 4

e o Exceptions "3.q." and '8."have been revised to change the reference from item "3.h." to items "3.h." and "3.r.". Iten "3.h." appearing in revision 2 of QATR-1 included exceptions to paragraphs 5.2.7 and 5.2.16. These exceptions have been separated into items "3.h." and "3.r." to facilitate the relocation of exceptions to 5.2.7 as described above, o Exception "5.a" has been revised to change the reference from item "3.1" to items "3.0" and "3.J." Item "3.1." appearing in revision 2 of QATR-1 included exceptions to Paragraphs 5.2.7 and 5.2.13.4.

These exceptions have been separated into items "3.o." and "3.J." to facilitate the relocation of exceptions to 5.2,7 as described above.

o Grneral statement 6.a has been expanded to more clearly define the applicability of Regulatory Guide 1.37 to maintenanco activities.

Appendix C has been revised as follows:

o Column title "QA PROGRAM TOPICAL REPORT SECTIONS" has been revised to "NMPC QA PROGRAM TOPICAL REPORT SECTIONS".

o Column title "QA PROCEDURES BY NUMBERS" has been revised to "NMPC QA PROCEDURES BY NUMBERS".

Page 4 of 4

~