r-a eee v, /
h UNITED STATES
{
g NUCLEAR REGULATORY COMMISSION WA AHING TON, D. C. 2MH
%.,..... j' TOLEDO EDISON CUMPANY AND THE CLEVELAND ELECTRIC ILLUMINATING COMPANY DOCKET NO. 50-346 DAVIS-BESSE NUCLEAR POWER STATION. UNIT NO. 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.107 License No. NPF-3 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by the Toledo Edison Company and The Cleveland Electric illuminating Company (the licensees) dated January 20 1986, complies with the standards and requirements of the Atomic Energy Act of 1954. as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in confonnity with the appli::ation, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangerirg the health and safety of the public, and (11) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will nct be inimical to the common defense and security or to the health and safety of the public; and E.
The issuancet of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the Itcense is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. hPF-3 is hereby amended to read as follows:
8803070265 080229 DR ADOCK 050 6
t.
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through krendment No.107 are hereby incorporated in the license. The Toledo Edison Company shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance and shall be implemented not later than April 1,1988.
FOR THE NUCLEAR REGULATORY C0m!SS10N D
Kenneth E. Perkins, Director Project Directorate !!!-3 Division of Reactor Projects - I!!, IV, Y, & Special Projects
Attachment:
Changes to the Technical Specifications Date of Issuance: February 29, 1988
ATTACRMENT TO LICENSE AMENOMENT N0. 107 FACILITY OPERATING LICENSE NO. NPF-3 DOCKET NO. 50-346
+
Replace the following page of the Appendix "A" Technical Specifications with the attached page. The revised page is identified by Amendment number and contains vertical lines indicating the area of change. The corresponding overleaf page is also provided to maintain document completeness.
Remove Insert 3/4 8-2 3/4 8 t A
4 I
l i
I
(
3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERA 3LE:
Two independent circuits between the offsite transmission network and the onsite Class IE distribution system, each consisting of:
1.
One OPERABLE 345 KV transmission line, 2.
One OPERABLE 345-13.8 KV startup transformer, and 3.
One 9PERABLE 13.8 KV bus, and b.
Two. eparate and itlep mdent diesel generators each with:
1.
A separate day fuel tank containing a minimum volume of 4000 gallons of fuel, 2.
A separate fuel storage system containing a minimum volume of 32,000 gallons of fuel, and 1
[
3.
A separate fuel transfer pump.
APPLICABILITY: MODES 1, 2, 3 and 4.
ACTION:
a.
With either an offsite circuit or diesel psnerator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirement 4.8.1.1.1.a within one !.our and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereaf ter and by performing Surveillance Requirement 4.8.1.1.2.a.4 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. Restore at least two offsite circuits and two diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY vithin the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SRUTDOWN vithin the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
b.
With one offsite circuit and one diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirement 4.8.1.1.1,a within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter and by performing Surveillance Requirement 4.8.1.1.2.a.4 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />. Restore at least one of the inoperable sources to OPERABLE status within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT STANDBY vithin the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore at least two I
I DAVIS-BESSE, UNIT 1 3/4 t.1 Amendment No. 6,97
ELECTRICAL' POWER SYSTEMS ACTION (Continued) offsite circuits and-two diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the time of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />, c.
With two of the above required offsite A.C-.
circuits inoperable, demonstrate the OPERABILITY of two diesel generators by performing Surveillance Requirement 4.8.1.1.2.a.4 within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, unless the diesel generators are already operating; restore at least one of the inoperable offsite sources to OPERABLE status witnia 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. With only one offsite source restored, restore at least two offsite circuits to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
d.
With two of the above required diesel generators inoperable, demonstrate the OPERABILITY of two offsite A.C. circuits by performing Surveillance Requirement 4.8.1.1.1.a within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least one of the inoperable diesel generators to OPERABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore at least two diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
SURVEILLANCE REQUIREMENTS 4.8.1.1.1 Each of the above required independent circuits between the offsite transmission network and the onsite Class IE distribution system shall be:
a.
Determined OPERABLE at least once per 7 days by verifying correct breaker alignments and indicated power availability, and b.
Demonstrated OPERABLE at least once per 18 months during shut-down by transferring (manually and automatically) unit power supply to each of the 345 KV transmission lines. **
l 4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE:
a.
At least once per 31 days on a STAGGERED TEST BASIS, if Surveil-lance Requirement 4.8.1.1.2.c has not been performed within the previous 31 days, by:
- The 18 month surveillance which is due on March 1,1988 may be delayed l
until April 1, 1988 i
DAVIS-BESSE, UNIT.1 3/4 8-2 Amendment No. 97,107
~