Requests Listed Addl Info & Schedular Commitments for Completion of Dcrdr Implementation.Listed Info Should Be Included in Util June 1988 Supplemental Dcrdr Summary Rept
ML20147F122
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 02/29/1988
From: Mcneil S
Office of Nuclear Reactor Regulation
To: Tiernan J
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML20147F126 List:
References
TAC-56110, TAC-56111, NUDOCS 8803070241
Download: ML20147F122 (5)


Text

~

Docket Nos. 50-317 DISTRIBUTION and 50-318 e'N NRCPDR CVogan SMcNeil Local PDR EJordan ,

PDI-1 Rdg.-

JPart10w OGC ACRS(10) .

Mr. J. A. Tiernan SVarga LTripp  :

Vice President-Nuclear Energy BBoger MGoodman Baltimore Gas and Electric Company  ;

P. O. Box 1475 Baltimore, Maryland 21203 i

Dear Mr. Tiernan:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION AND SCHEDULAR COMMITMENTS FOR ,

COMPLETION OF DETAILED CONTROL ROOM DESIGN REVIEW IMPLEMENTATION (TACS 56110 AND 56111)  !

l  !

The NRC Confirmatory Order dated June 14, 1984 required your submission of a  !

Detailed Control Room Design Review (DCRDR) sumary report, including a proposed implementation schedule, no it.ter than January 1,1985. ,

i Your letter of December 31, 1984, which submitted your DCRDR sumary report, r prioritized and scheduled the completion of corrective actions for all  !

identified human engineering discrepancies (HEDs), as follows:  ;

"Priority A [HEDs] - Prompt - By the end of the next refueling outage for !

each unit, subject to the availability of materials and engineering. l r

Priority B [HEDs] - Near Term - By the end of the second refueling outage i i for each unit, subject to the availability of materials and engineering. l r

Priority C [HEDs] - Long Term - By the end of the third outage for each  !

unit." ,

This appeared to comit yo to resolving Calvert Cliffs HEDs according to the schedule given below:  :

Unit 1 Unit 2 Priority A Snring 1985 Fall 1985 Priority B Fall 1986 Spring 1987  ?

Priority C Spring 1988 Fall 1988  :

However, close examination of Attachment C "Sumary of Human Engineering ]

Deficiencies," of your December 31, 1984 submittal indicates that you did not I consider the Spring 1985 outage to be the next Unit I refueling outage, though your schedule submittal datt was December 31, 1984, but rather, viewed Fall 1986 as Unit l's next refueling outage. Thus, the schedule actually implied i for Unit 1 (Unit 2's schedule remained the same) was: l l

8803070241 080229 PDR ADOCK 05000317 l P PDR l l

i 1 t

Unit 1 Priority A HEDs Fall 1986 i Priority B HEDs Spring 1988  :

Priority C HEDs Fall 1989 On November 1.1985. you submitted a suopler'ent to the December 31, 1984 DCRDR summary reoort. This supplement was in response to NPC staff concerns regarding the adequacy of your DCRDR program plan in identifying and correctino all HEDs.

In this supplemental program plan, you committed to submitting a suoplemental

  • 0000R summary reoort to the NRC in June 1987 and to prioritizing and correcting all additional HEDs identified according to the fo111owing schedule:

Unit 1 Unit 2 '

Supplemental Priority A PEDS Spring 1988 Fall 1988 Supplemental Priority B HEDs Fall 1089 Sprina 1990 l Supplemental Priority C HEDs Spring 1991 Fall 1991 l Subseouently, your schedule for completion of original and supplemental HFDs has slipped significantly due to 1) manpower requirements in instrumentation-and-controls engineering and 2) the shift to a twenty four F.cnth operating cycle.

In your letter of October 24, 1986, you notified the NRC that corrective action  ;

on 110 HEDs (30 of which were scheduled for completion by Fall 1986, 39 by Spring i 1988 and 41 by Fall 1989) was being deferred and that these HEDs were being  :

transferred into the supplemental DCRDR procram. This deferment was attributed to the demands placed on instrumentation-and-controls engineering in completing other NUPEG-0737 items. Then in April 1987, you comenced shifting to a twenty four month operating cycle from an eighteen month cycle. This shift ,

automatically delayed the supplemental program HED correction dates as follows:  !

Unit 1 Unit 2  !

Sucolemental HEDs 18 mo. 24 mo. 18 mo. 24 mo. i Priority A Spring 1988 Spring 1988 Foll 1988 Spring 1989 i Priority B Fall 1989 Spring 1990 Spring 1990 Spring 1991 l 1

Priority C Spring 1991 Spring 1992 Fall 1991 Spring 1993  ;

Finally, in your May 29, 1987 submittal, veu deferred submission of the

supplemental DCRDR suntnary report by one year to June 1988. This resulted in ,

further delays in the completion of Priority A, Unit 1 supplemental HEDs by i two full years until Spring 1990. l i

Thus, through the transfer of the 110 original PEDS to the supplemental  !

, program, the shift to a twenty four month operating cycle and the delays in ,

the completion schedule, numerous HEDs, that originally were to be corrected  ;

between Fall 1986 and Fall 1989, will not be corrected until as late as Spring 1993.  !

in response to these program changes and delays, the NRC staff and its consultant, Science Applications International Corporation (SAIC), met with BG&E at Calvert Cliffs on October 6, 1987. This meeting centered on the NRC  :

staff's concerns about BGAE's schedule for the remaining DCRDR activities. ,

The enclosed audit report was prepared by SAIC. The NRC staff agrees with the i technical positions and conclusions presented in the enclosed audit report.

l 4

1 As a result of your DCRDR history and of this meeting, the NRC staff requests that BGAE include the following in your June 1988 supplemental DCRDR sumary report:

1. Provide a commitment to correct all Human Engineering Discrepancies (HEDs) for Unit 2 prior to restart from the Spring 1991 refueling outage and reaffim your October 24, 1986 comitment to correct all Unit 1 HEDs prior to restart from the Spring 1992 refueling outage.
2. Respond to the following inquiries concerning the oversight review committee that reviews all proposed HED resolutions:
a. What is the process for review by the comittee and its methods for assessment and prioritization of HEDs?
b. What is the comittee's schedule for responding to proposed HED resolutions?
c. When the com'ttee is not in favor of proposed HED resolutions, how is this handlod?
d. Who (or how) is final approval or disapproval of proposed HED resolutions provided?

i

3. During the onsite meeting, the staff reviewed a listing of all HEDs that had been classified in the safety-significant Categories 1 and 2. The staff also raised the concern that safety-significan* HEDs are not being corrected in a timely manner. Please address this NRR staff concern.  ;

When responding to this request, please include our technical assignment control numbers (TAC'S 56110 and 56111) in your subject line. Including these numbers permits tracking of all correspondence related to this specific issue in the NRC's computerized tracking system (NUDOCS) which also is available for public  ;

use at the NRC's Public Document Room. l The reporting and/or recordkeeping requirements of this letter affect fewer ,

than ten respondents; therefore OMB clearance is not required under PL 96-511.

Sincerely, Scott Alexander McNeil, Project Manager l Project Directorate I-1 Division of Reactor Projects, I/II ,

Enclosure:

)

As stated I

cc: See next page i PDI-1 PDI-1

&v PDI-1 CVogan (d SMcNei b RCapra l 2/pi/88 2/4/88 2/sf/88 1

J

Mr. J. A. Tiernan Paltimore Gas A Electric Company Calvert Cliffs Nuclear Power Plant cc:

Vr. John M. Gott, President Recional Administrator, Region I Calvert County Board of it.S. Nuclear Regulatory Comission Comissioners 4'S Allendale Road Prince Frederick, Maryland 20768 King of Prussia, Pennsylvania 19406 D. A. Brune Esq.

General Counsel Baltimore Gas and Electric Company P. O. Box 1475 Baltinore, Maryland ?l203 Jay E. Silberg, Esq.

Shaw, Pittman, Potts and Trowbridge 1800 M Street, NW Washington, DC ?0036 Mr. M. E. Bowman, General Supervisor Technical Services Engineering Calvert Cliffs Nuclear Power Plant MD Rts ? ! d, P. O. Box 1535 Lusby, Maryland 20657-0073 Resident Inspector c/o (J.S. Nuclear Regulatory Comission P. O. Box 437 Lusby, Maryland 20657-0073 Be-htel Power Corporation ATTN: Mr. D. E. Stewart Calvert Cliffs Project Engineer 15740 Shady Grove Road Gaithersburg, Maryland 20760 Corbustion Engineering, Inc.

ATTN: Mr. W. R. Horlacher, III Project Manager P. O. Box 500 1000 Prospect Hill Road Windsor, Connecticut 06095-0500 Departnent of Natural Resources ,

Energy Administration Power Plant Siting Program ATTN: Mr. T. Magette Tawes State Office Building Annapolis, Maryland 21204 4

o

. m - a m  %.. A._ am . u m. - __ .m. - -.A i

1 i

ATTACHMENT 1 AUDIT REPORT 4

1 f

f i

E I

J I

i l

1 e

a m - - - , - - -.. - , --.. -,., ,---- -. - - ,---.- - - - - - _ . . -

,,, , ,,,,. , , _ - .,,- . _, - - -n---. ---~ ----, ,---, p..w,w,