. e- -

Annual Survey Report N.S. SAVANNAH March 26, 1987 CONTENTS TLD MONITORING REPORT ENVIRONMENTAL SAMPLE ANALYSIS REPORT DIRECT RADIATION SURVEY AND CONTAMINATION SURVEY RESULTS CONDUCTED BY:

South Carolina Department of Health And Environmental Control Bureau of Radiological Health 2600 Bull Street Columbia, South Carolina 29201 8803070214 880228 PDR ADOCK 05000238

. p DCD  :

DIRECT SURVEY AND RDOVABIE CONDMINATICN REKRP

'Ibe direct radiation survey was conducted using Ilxiium Model 19 Micro R meters.

Backgrourd was measured as 0.6 uR/hr. A 'IWinelec Motel 5100 Proportional counter was used to analyze the smear mmples. 'Ihe systs background was 0.1 cpn for alpha and 0.95 cpn for beta /gama.

Instrument efficiency was 32% for alpha and 47% for beta /gama. Countirg time on the Tennelec system was 10 minutes.

Backcround Readims location Readim (uR/hr)

Alpha _ Beta / cama (DIN /100cm')

( y Substract 0.5 background for true)

NWIGATICN BRIIEE DECK In Pilot House at helm 2 0.3 3.8 Bridge Wing, portside 3 .- 0.8 Bridge Wing, starboard side 3 .- 1.6 Fire Station #1, near chart rocn 2 .03 2.1 Fan rocn, portside, emerg gen, roce -

unable to access B AT DECK Chief Eng. State rocn, portside 3 0.8 2.9 I Capt. State rocn, starbcard side 3 0.3 2.9 i Fire Station #2, portside passageway 2 0.5 4.2 Officer's lourge, aft 2 0.5 4.0

  • j PRCmwr orCK Auxillary reactor hatch and ducts, 2 0.5 ,

1 forward of reactor hatch Portside of main reactor hatch 2 -

1.6

Fire Station #5 near starboard side of reactor hatch 2 0.3 0.8 Fire Station #4, portside Prun deck 3 1.6 Center of main lounge 4 -

2.3 Center of Veranda 2 -

0.9 Fire Station #7, starboard Prun deck 2 -

2.7 "A" DECK Fire Station #14, portside passageway 2 0.8 2.5 Center of rain lobby 5 0.5 4.2 Fire Station #16, portside P ecageway 3 1.3 8.1 Fire Station #17, starboard Peugeway 2 0.3 2.5 Fire Station #15, starboard passagerdy 4 -

4.2 Area cutside Doctor's ofc. & HP Iab 3 0.3 2.3 "B" DECK Fire Station #20, portside passageway 2 0.3 1.8 Fire Station #22, portside passageway 3 0.3 2.5 Passageway outside steward's mess ard lounge, portside 2 -

0.8 Center of main dining roan 2 0.3 Center of conference roan, Aft 2 0.8 3.4 Fire Station #21, starboard side 2 0.3 3.1 Passageway outside reactor space water tight door, closed 2 -

2.1 Inside main galley 3 1.6 "C" DECK Visitors' gallery, portside -

0.5 1.2 Visitors' gallery, mid-ship -

0.3 1.4 Visitors' gallery, shMal 2.3 Outside forward control door, portside 3.1 Cold chenistry lab 0.5

non ' m Reactor control nter 1.5 0.3 0.1 Outside hot chem lab door, closed ,

l portside 2 0.3 Engine rom toilet,-portside 4 -

2.1 Upper level, engine rocIn, portside 2 1.8 Upper level, engine rocan, starboard 1 -

2.3 i

I DK;DE ROCH - LOhTR LEVEL outside port pu p rocan hatch, closed 11 2.1 Outside starb. prp m. hatch, closed 10 0.3 4.4 l

Lower level, engine rocIn, portside 1 -

1.4 l IcWer level, engine ItcIn, starboard 1 -

2.1 14'0" FIAT Outside port stab. m. hatch, closed 1 2.1 Outside starboard stabilizer rom hatch, close 2 3.1 Fire Statation #31, urder sign "7b 14'-0" Flat" 150 3.1 CMED HOLD NO. 4 Aft, bulkhead, "B" deck level 0.5 1.4 i Aft, bulkhead, "C" dock level 1 5.1 Aft, bulkhead, "C" deck level, starboard .

i of forward control space 420 2.1 l

l

Daily and Cumulative Monitoring Results Posting Date: February 4, 1987 Removal Date: April 22, 1987 Days Exposed: 77 TLD PERIOD TOTAL AVERAGE No, mR mR/ Day ,

1901 13.0 .17 + .02 1902 Missing Missing 1905 10.0 .13 + .02

~

1907 12.0 .16 1 02 1909 10.5 .14 1 02 i 1910 11.0 .14 1 02 l 1911 12.7 .16 1 02 1912 12.0 .16 + .02 1913 9.7 .13 I .02 1914 19.0 .25 1 02 1915 10.5 .14 + .02 1916 12.0 .16 I .02 1920 8.0 .10 1 02 l 1921 13.0 .17 + .02 1922 12.3 .16 I .02 1923 81.3 1.06 I .06 1924 60.0 .78 I .05 1925 18.7 .24 I .03 1926 Missing Missing 1927 12.3 .16 + .02 1930 12.7 .16 I .02 1932 11.3 .15 7 .02 1933 Missing Missing 1934 15.5 .20 + .02 1936 17.0 .22 I .03 1938 17.7 .23 I .03 1939 8.0 .10 I .02 1940 9.7 .13 I .02 1945 42.0 .55 I .04 1946 16.7 .22 I .02

~

1947 13.5 .18 .02 71-1960 Charleston Harbor Sediment, Date-April 22, 1987 l

Isotope pCi/gm DPM BE-7 3.7 +

~

.3 8.2 CS-137 0.20 1 05 25 0.4 ,

i K-40 11.0 + .6 U-238 2.0 I .4 4.4 RA-226 3.2 I .3 7.1 AC-228 0.08 1 1 1.8 10-1960 Charleston Harbor Surface Water, Date-April 22, 1987 Tritium 1260 1 36 pCi/l - No Detectable Gammas }

I I

l

)

TLD No, locations t 1901 Pilot house - ceiling, j 1902 outside en Premenade deck behind the swimming .

pcol.

1905 Vent en mal.. stairway to Verande and lounge on Promenade deck.

.1907 (U. er level) engine recm thrcttle.

1909 In front of the top of the reactor hatch 'on white eclumn - Premenade deck, i

1910 Premenade deck main leunc.e middle of front viewine. window.

1911 "A" deck main desk behind counter en orange wall.

1912 "A" deck hospital entrance (near H.P. recm) on-wire cable abcVe wceden wall rack. .

19'3 . "A" deck near hes.cital en rance sie.n. ,

k 1914 "3" deck Carge Hold -4 en wall near entrance i.. .i

... o.: . a ,. .s a g.a.. .g c....s... . . .

a-a -

s .4 ; . -. .re.e 4.. ., 3. C .

,. c.

.. , c e ..< 4. . .. o..

1916 "E" deck handle on decr leadin:- to reac or .

i space. ,

I 19*.T "E" deck d::: lead:.ng to fan ruem. l

]

,. n.

a

%e '

k. ....=...d....'...

- .'d',..

4.x."

. . e ne.=- .

e.. rance :: mai.. galley.

-a 3

. 2. ., o. . 2e .s.. .r .e 5...... . . . . . 4...

...a.,......,.-

... a a. a ... w. 2..,e.

3 c.. - . .. . . . . . . . . . . . . . . . . .

192'. . (1:wer level) enc.ine rocm cu side .=umo. char:e . i hatch right side 20ft. ahead cf diesel engines. l (s...w

... a 2).. i l

1922 "14f . .rlat" en righ side above stabilizer l door (starboard). l I

o l

)

-n 1923 . "D" dock Fire Station #31.

1924 "Hold" left side near alarm bell (portside).

'1925 "Hold" on pipe near alarm right side (starboard).

1926 Navigation bridge deck - officer's lounge fan.

1927 3rd officer Room NBl - on metal rack Navigation bridge deck.

1930 Navigation bridge deck - Room NB4. Reactor l operation room on metal rack. l i

1932 "C" deck door leading to reactor space on  !

overhead pipes.

1933 "C" deck cold chem lab door. l 1934 Pipes above stairway to "C" deck from "D" deck.

l 1

1936 "14ft. Flat" above left side of stabilizer door )

(portside).

l l

1938 (Lower level) engine room outside door of pump hatch enanger left side (portside).

1939 "C" deck left side of ceiling in reactor viewing room (portside).

1940 "C" deck right side of ceiling in reactor viewing roem (starboard).

1945 Fantail of U.S. Yorktown 1946 Ticket Booth Parking Lot - Patriots Point 1947 U.S.S. Clagamore (submarine) fantail near N.S.

Savannah s

. South Carolina and Department Environmental of HealtlRECEIVEDe Control -

. ZC 3 - 1987 E. VM Co u bia' C. 29201 / k M" It@>\ I Oren L Brady, Jr., %ce-Chairman Commissione'

" -I [t Euta M Cohin, M.D.. Secretary

%chael D. Jarrett *d ,,h Harry M. Hallman, Jr.

Henry S. Jordan. M D

{

James A. Spruill, Jr Toney Graham Jr. M D December 1, 1987 l Mr. Chuck Waldrop Deputy Director State of South Carolina Patriots Point Dev. Authority P.O. Box 986 Mt. Pleasant, SC 29464 i

l

Dear Mr. Waldrop:

Enclosed is the semi-annual results of the environmental samples collected and direct radiation measurements for the N.S. Savannah for the period April-September 1987.

A copy of this report should be provided to NRC Region II as )

the result of your recent inspection and included in your annual report.

Should you have any questions, please do not hesitate to contact me at 734-4633.

Very truly yours,

&hos r VirgklR. A t h Director i

Division of adioactive Material Licensing and Compliance Bureau of Radiological Health

/kn l Enclosures l

l l

l A./ CLON S @

. Daily and Cumulative Monitoring Results Posting Date: April 22, 1987 Removal Date: September 24, 1987 Days Exposed: 155 TLD PERJOD TOTAL AVERAGE No. 'R mR/ Day 1902 19 .12

  • 0.2 1905 14 .09 i 0.2 1907 9.3 .06
  • 0.3 1909 10.3 .07 * .03 1910 13.7 .09 i .02 1911 17.3 .11 i .02 1912 24.3 .16 * .03 1913 14.3 .09 i .02 1914 16.3 .11 i .02 1915 Missing Missing 1916 17.0 .11 i .02 1917 18.0 .12 * .02 1918 13.3 .09 i .02 1919 14.7 .09 i .02 1920 6.7 .04 * .02 1921 23.3 .15 * .02 1922 Missing Missing 1923 114.3 .73 i .03 1924 Missing Missing 1925 24.3 .16 * .02 1926 24.7 .16 i .02 1927 Missing Missing ,

1930 13.7 .09 i .02 l 1932 16.0 .11 * .02 '

1933 Missing Missing i 1934 19.7 .13 i .02 l 1936 24.7 .16 i .03 l 1938 29.3 .18 i .03 1939 17.3 .11 i .02 1940 20.7 .13 i .02 1945 14.3 .09 i .02 1946 21.7 .14 * .02 1947 22.7 .15 * .02 I 10-1960 Charleston Harbor Surface Water, Date-September 24, 1987 i

HDL 3 pCi/l -

No Detectable Gammas Tritium 510

  • 218 pCi/1 71-1960 Charleston Harbor Sediment, Date-September 24, 1987 Isotope pCi/gm l Cs-137 0.15 i .02  ;

K-40 9.5 * .2 i Ra-226 1.0 * .2 1 Ac-228 0.8 + .1 l

- _ __._y--__ ..c .

_ . . . . . _ _ . , . . _ . . . , . . . . . g_ , .,

~

' ~

",NS SAVANNAH FACILITY LICENSE NS-l', DOCKET- 50-238 1. _iT.l',:7'~~',;,,,)

QUARTERLY CdNTROL AREA SEAL CHECK LIST

. UP-DATED 10/22/81 UPON ARRIVAL OF .i I

-NS SAVANNAH TO _ PATRIOTS POINT _. ,

0) y g jlM .

SEAL 4 DATE INITIALS i LOCATION YI O ctor space h') Lf !).)-/ / ( 9 fl

/ \

2. "B" Deck, f an room Std side forward g,/ d u /1/ '

/

3. "C" Deck, reactor Secured from l' space Inside f
4. "C" Deck, forward f control - cold water ()) /[ / l i

l chem lab & rad I monitoring room  !

5. "D" Deck, f orward control -

rad sampling room & gas Secured from absorp equip room Inside ,

6. 14' - 0" flat, port stabi- g//79 64/ /

lizer room 14' - 0", flat, stb 7.

stabilizer room h !/ fr- ' 7v///

8. Engine rocrn space - ,

hot chem lab v .

f

9. Engine room space, port pump room N ,/f ff /g /

l

10. Engine room space {y stb pump room

(

@ 1

( ,

I h .

9/17/82 1 I

e

-- -. m .-.. . . . . . . . . . _ _ . . . _ _ _ _ _ . - - __ _ , , , , , , , . ,__ , , , , , ,

^i ' ' ~

N S SAVANNAH FACILITY UICENSE NS-l', ' DOCKET ' 50-238 5.. ~ 2.i_ -

QUARTERLY CONTROL AREA SEAL CHECK LIST UP-DATED 10/22/81 UPON ARRIVAL OF . .

~

? .

NS SAVANNAH TO PATRIOTS POI -t){e-(~ .

~:---~.,

- -=

ogh ~

DATE INITIALS LOCATION SEAL 4 /

1. "B" Deck entry to g //', p f f f,[g reactor space
2. "B" Deck, f an room d.) - [ / Y / {

~

Std side forward

3. "C" Deck, reactor Secured from f space Inside

/

4. "C" Deck, forward control - cold water g,jj g f /

chem lab & rad monitoring room t

5. "D" Deck, forward control -

rad sampling room & gas Secured from absorp equip room Inside

6. 14' - 0" flat, port stabi- 4 yf p f a.izer room
7. 14' - 0", flat, stb ,

g' //7 p l

)

stabilizer room 1

8. Engine room space - W' f 7gp  ;

hot chem lab f

9. Engine room space, g,77 port pump room .3d
10. Engine room space f// (\,j stb pump room 9/17/82

. -~_.....s.__...

, ....,....._.g,,,

.;j;;[,

~

[~ ,

[ NS SAVANNAH FACILITY LICEESE NS-l', DOCKET'50-238

- . - - _ . . . - . _ . _ . . . . . _. ..._, , ,,, _ ,_ , , ~ ~ '

Z QUARTERLY CbHTROL AREA SEAL CHECK 35'55~

, UP-DATED 10/22/81 UPON ARRIVAL OF

-- . NS SAVANNAH TO_ PATRIOTS POINT..._.. _. _

LOCATION SEAL 4 DATE INITIALS

1. "B" Deck entry to

/C ff reactor space h./((

2. "B" Deck, f an room Std side forward (U /To/4/

/ Mf

3. "C" Deck, reactor Secured from space Inside
4. "C" Deck, forward control - cold water chem lab & rad y

/T (J)-//77 p /

monitoring room

5. "D" Deck, f orward control - .

rad sampling room & gas Secured from absorp equip room Inside l

6. 14' - 0" flat, portstabij lizer room gj-f / { p 4 c[
7. 14' - 0", flat, stb '

stabilizer room

8. Engine room space -

Y .u+u?7y(

hot chem lab K

9. Engine room space, (b -/// %29 ,

i port pump room ((/- //[f g

10. Engine room space stb pump room f \ f

\

I

\

l Y/d 7 sap w W '

as 1 9/17/82

. . -.- 4.- -.. _ .. .- . . . . . - . . . . . _ _ . . _ _ . . ,

~'

NS SAVANNAH FACI 5ITY ' LICENSE NS-l', ' DOCKET' 50-238.1 . . j.f ~ -

QUARTERLY CONTROL AREA SEAL CHECK LIST UP-DATED 10/22/81 UPON ARRIVAL OF

-NS SAVANNAH TO.DATRIOTS ., POINT.()Jf/$N ' * [ .'.,: .:. ..

=

p$ ,

~

SEAL 4 DATE INITIALS LOCATION

. /

r ctor space (U--J / 77 5 7 d4 7 M.M N

2. "B" Deck, f an room Std side forward 4_.7 / pf g/iTJ

/

77-

3. "C" Deck, reactor Secured from space Inside
4. "C" Deck, forward 75L /

control - cold water '/ I chem lab & rad .

/

monitoring room

5. "D" Deck, forward control -

rad san.pling room & gas Secured from absorp equip room Inside

6. 14' - 0" flat, port stabi-lizer room g(( [/ f 14' - 0", flat, stb 7.

stabilizer room ,

[j)-//T / f [

Engine room space -

8.

hot chem lab l/s-//[f /

g,b/ /

9. Engine room space, port pump room 30
10. Engine room space stb pump room

(([ j {

Ajaga # 4-!g t

iy 3%* q A.A/dwe L~muk nun?h 9/17/82

N.S. SAVANNAH' '

Personnel Whole Body Exposure January 1, 19 &u - December 31, 19 87 Estimated Whole Body Exposure Range Number of Individuals (rems) in Each Range No measurable exposure .......................... 3,,,,,,,,,,,,,,,,,,,,,,,,

Measurable exposure less than 0.1 ............... 0........................

L 0.1 to 0.25 ..................................... 0........................ ,

0.25 to 0.5 ..................................... 0........................

0.5 to 0.75 ..................................... 0........................

0.75 to 1 ....................................... 0........................

l'to 2 .......................................... 0........................

2 te 3 .......................................... 0........................

3 to 4 .......................................... 0........................

4 to 5 ..........-................................ 0........................

5 to 6 .......................................... 0........................

6 to 7 .......................................... 0........................ .

i 7 to 8 .......................................... 0........................ i l

1 8 to 9 .......................................... 0........................ i

- 1 9 to 10 ......................................... 0........................

10 to 11 ........................................ 0........................

11 to 12 ........................................ 0........................

12+ ............................................. 0........................

(Enclosure (4))

1 i

i

_~ J

r I

. THE NAVAL AND MARITIME MUSEUM PATRIOTS POINT N -

I N

H Post Office Box 986, Mt. Pleasant, SC 29464  ;

(803) 884 2727 l

}!EMORANDU31 F0lt Tile RECORD 1 1

TO: EXECUTIVE DIRECTOR l FROM: ASSISTANT DIRECTOR FOR ENGINEERING '

\

DATE: 15 ApHIL 1987 l I

SUBJ: INSPECTION OF CONTROLLED SPACES ON SAVANNAH >j l

1 On 10 February 1987 Inspected Savannah Reactur l l

Space, Port & Starboard Stabilizer Rooms, and j the Hot and Cold Chen41 cal Labs for Material l Condition. I was accompanied by Mr. Gibb Vinson of the South Carolina Department of Health and Environmental Control. The Two Pump Rooms were not inspected.

2. Material Condition was satisfactory in all areas except the Reactor Space where the following dis-crepeneies were noted:
a. Of the 2 exhaust fans (2-100-1 & 2-100-2), one supply fan (1-105-1) and two recirculating fans )1 (3-107-1 & 3-107-2), only recirculating fan  ;

(3-107-2) was operational. I

b. The deck in the After Port portion was heavily rusted. This deterioration is apparently caused by condensation collecting on and running down i the After Bulkhead. Smear samples and a Geiger Hueller survey revealed no detectable readings above background and no removable surface contamination.

Chartes F Hyart. Cnairman. Npresenbng the Gowenor Charus T Osuey, hpresenng Cong John Spratt Charks E Eiserharot Jr V Cha:rman. Representmg Sen Ernest F. Hoihngs Myrte C Rigga Reproeeming Senetrar Strom Thurmond A. Cse 4oed ciarkson, Jr. Representeg Cong Fkys D Spence J Elliott Wdhama. Represe%ng Cong Room Tanon Q. Goroon Demy. Representmg Cong Anhur Revenei. Jr J. E. Guerry, Jr . Emscutuo Duettor Jerm F Fivyc. Representmg Cong Ektabeth J Penetton C G. Weidrop Deputy Director James T Lazar bpresentog Cong Butwe C Dernca. Jr Wdhom F. Pnoiseu, Esq , Legal Counsel MEMBERS EMERITUS Joseph P Grettah. Comme.oner Chanes T Mauro, Commseasoner J Was Hiers, Comminuoner RADM Herman J Koesler, USN, Director F 00A O M M ( b

~

, . . ~ .

3 .The deteriorating Deck should be~ scaled, treated with rust transformer, primed end painted. In order to cor-

, rect the moisture problem, desicant should be placed in the Reactor Space, and as a minimum, both recircu-lating fans should be made operational and run contin-uously.

4. Recommend these points be discussed at the next scheduled Savannah Safety Committee Meeting and an acceptable pro-cedure concerning entry and disposal of rust chips be developed.

m' -- 7fA  ;<p, James R. Blandford Asst. Dir. for Eng eering JRB/aw CC:.

Deputy Director - Savannah Files 1

, . . , , . .