ML20147E990
| ML20147E990 | |
| Person / Time | |
|---|---|
| Site: | NS Savannah |
| Issue date: | 02/28/1988 |
| From: | Waldrop C SOUTH CAROLINA, STATE OF |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| Shared Package | |
| ML20147E995 | List: |
| References | |
| NUDOCS 8803070211 | |
| Download: ML20147E990 (8) | |
Text
._
THE NAVAL AND MARITIME MUSEUM PATRIOTS POWT O-Post Office Box 986, Mt. Pleasant, SC 29464
'903) 884 2727 28 February 1988 U.
S. Nuclear Regulatory Commission Washington, D.
C.
20555
SUBJECT:
Annual Report of N.S.
SAVANNAH Amended Facility License No. NS-1
REFERENCE:
(A) Amendment No. 11 to Facility License No. NS-1 Gentlemen:
In accordance with reference (a), the following information is hereby submitted:
a.
Status of Facility: The vessel remains moored as before.
No entry has been made into the primary containment vessel.
The ship was toured by c.'er 250,000 visitors during the year. Hydraulic cargo hatch operating systen s were activated for holds 2 & 4, and a wooden hull vintage sailboat was lowered into #2 hold for future display. Work was begun in numbers 2,3,4 holds for museum expansion.
An inspection of radiation survey of controlled spaces, including the secondary containment vessel, and conditions were found to be satisfactory.
(See enclosure 5).
b.
Results of the Annual Radiation Surveys and Monitoring Static Dosimeter Readings: (See enclosure (1).
c.
Results of the semi-annual environmental sample analysis survey: (See enclosure (l).
Cha 'es F Hyatt. Cha r.~an. Represent ng the Governor Charles T. Oakley. Representing Cong. John Spratt C*r (
E E seta Ot Jr. V Cha rman. Revesent.n; Sen Ernest F. Homngs Myrtle C. Riggs. Representing Senator Strom Thurmond E B Ps calf. Represent >ng Cong Floyd D Spence J. Emott Williams. Representing Cong Robin Tallon r
R GO den Da by Aep'esente; Cong Arthur Ravenet. Jr J E. Guerry. Jr.. Executive Director John F Floyd, Rep esenting Cong Elizabeth J. Patterson C. G. Waldrop, Deputy Director James T Lara'. Represent;ng Cong Batier C Derro, Jr William F. Prdeau. Esq, Legal Counsel MEMBERS EMERITUS Joseph P GrMth, Comm.ss ener Charies T. Mauro, Commissioner J Va' H m Cen m w oner RADM Herman J. Kossier. USN C. rector l
8803070211 880228 N A Cra*iord Clarkson Jr.
I PDR ADOCK 05000238_;j R
nrn
U.S. Nuclear Regulatory Commission Page-2 d.
Results of. quarterly intrusion alarm _ checks:
(See enclosure-(2I.
q
~
- e. ' The mount of radioactive materials removed from the(OAVANNAH, by releases, discharges, s
and sh'ipntuts of radioactivA waste I\\ material:
}a. ne io
(
f.
Principal maintenance performed on vessel:
m Routine day-to-day upkedp.
i
,t
,s e'
i
. gi g.
' Anauthorized entry into radiation:c, nt:rol areas o
\\by visitors or employees:
None.'(' Set)? quarterly V
g3 3 4.; control area seal-check list, (Edclosure t3).
3 I h.
' Degradation of any.boundries-which contai'n the
"~
s radioactAvd materials aboard the N.S.g SAVANNAH:
x N1 None
- -\\1
~
\\
.s.
3
't 4
x Results ?f ;ccupational expgsurk by pe rsonnel
>k i.
i
\\c.po(Imetry l-(See enblqsure-s4 9 N ' \\;'
\\
1;
\\ %. '
D,
.\\
=,
y h,,-
s s
3 Sincerel x, q 1
i s
t.
,s 4
s, {; t
'%,g 4
o e,
i
- p. t.( 1 7
- 1
.'G.
Waldr p
)
- t s
\\
('
Depdty Dire tor j
i g
'cC:
Virgil R. At Et' Direck
, DHEC
~
\\'7> \\
Y John J. Davism WAO:0' t
NDr2,,ZelLevine,MAKD^
\\
y
(
s
- k,
^ -
m, g
s
- I'
)\\w s?
'1
- i y
(
,A
\\
L(
's 4
4 e &
g s
,s.
(_
i
< 1 i
N
.\\
g A
h 7
g I
k 1
\\.
^
.t
's r w
)
,'\\
~u 1
}
k
'^
.p,
. '\\
[
5 1
\\
Q
.a
. Ah.
\\
\\.
, Jt
( 'I a
-s S
~
- 4 s
'\\
1
+
a u..n
}
y J
NS $. AVANNAll FACII,ITY I,1CFNSE NS-1, DOCKET 50--238 pilOCEDUllE FOR TESTING CONTilOI.1,ED llADI ATION AllEA INT 11USION Al vit INITIALS O
A.
OBJECTIVE - To test the operability of l' lie".Cu6Jdet a1 arms.
I B.
ledBO DUHE 1.
Unlock the chain and undog the B deck entry door to the upper reactor space and open slightly.
The horn < hen activated will be nudible.
2 Resecure door.
Affix new Seal MNN I
3.
Proceed to the flying bridge nnd check visible alarm signal.
l
)
4.
Roset alarm panel on A deck, port side l
port.
DATE.
Signature - P
's'o n'~ Cot 1 d u c t i n g Te-I t
I a
Signature - Witness-O $t)
As 1
l l,
c NS SAVANNAll FACILITY 1.1 CENSE NS-1, DOCKET 50-238 4
I PitOCEDUllE FOR TESTING CONTitOLI.ED ltADI ATION AREA INTRUSION A1. ARM INITIA1,S y
A.
OBJECTIVE - To test the operabil'it,y of the sub, ject alaims.
B.
!'it6Cl:DUllE 1.
Unlock the chain and undog the B deck entry door to the upper reactor spa.:e and open siightly.
The hurn when activated will be audible.
2.
Resecure door.
Affix new Seal # N / N d2 3.
Proceed to the flyin'g bridge and check 7
visible alarm signal, t
4 4.
Roset alarm panel on A deck, port side port.
\\
N
-aff
-DATE t
4 Sicnature - Person Co ducting Test
- j Signature - Witness I
)
1 4
i l
l
O F
i I
NS SAVANNAll FACILITY I,1 CENSE NS-1, DOCKET 50-238 pHOC2 DURE FOR TESTING CONTROLLED RADIATION AREA INTRUSION ALARM INITIALS A.
OBJECTIVE
.To test the operability of the subject alarms.
R.
l'H0ChDUltE 1.
Unluck the chain and undog the B dock entry door to the upper renetor space and open s1ightly.
The horn when activated will be audible.
2.
Resecure door.
Affix new' Seal k
{
3.
proceed to the flying bridge and check i
visible alarm signal, f
4.
Roset alarm panel on A deck, port side
- port, i
f((
D5TE / ~/
l i
1 lh
^
Signature - Person Co ducting Test
/.
)
Signature - Witness
)
't 4
NS SAVANNAll FACILITY LICENSE NS-1, DOCKET 50-238 PitOCEDURE FOR TESTING CONTROLLED RADI ATION ARMA INTitVSION AI. ARM
.[N I TI ALS, A.
OBJECT,I_VE - To test the operability of the sub, ject alarms.
B.
PRDCEDURE 1.
Unlock the chain and undog the B dock entry door to the upper reactor. space and open slightly.
The horn when activated will be audible,
.j 2
Rosecure door.
Af fix now Seal # / / V/[
l 3.
Proceed to the flying bridge and check T
i visible alarm signal.
4.
Roset alarm panel on A dock, port side i
- port, i
/
. /:3 M 7 7 DATE
/
4 r
Siglature - Por. n Conducting Test Signature, Witness 1
-un,
,r.
.m,
NS SAVANNAH FACILITY LICENSE NS-1, DOCKET S0-238 PROCEDURE FOR TESTING CONTROLLED RADIATION AREA INTRUSION ALARM INITIALS A.
OBJECTIVE - To test the operability of
/
the subject alarms.
l B.
PROCEDURE -
l 1.
Unlock the chain and undog the B deck entry door to the upper reactor space and open slightly.
The horn when activated will be audible.
2.
Resecure the door.
Affix new seal *$U / / M. ' 2 3.
Prodeed to the flying bridge and check visible alarm signal.
4.
Reset alrm panel on "A" deck, port side entry port.
// -} ?-) "i Date
/
y'
- Signature - Per on conducting test
e u,,
South Carolina Department of Health and Environmental Control Board Mows H Clarbon, Jr. Cha:rman 2t<C Bull Street Gerald A kaynard. %:ce Chairman Columbia. 5 C. 29201
{
,r Oren L Brady.Jr.. Secretary Barbara P Nueule James A. Spruill Jr Commissoner William H Hester M D Michael D Jarrett Euta M. Cohin. M.D.
Y May 4, 1987 MAY - 61987 Mr. Chuck Waldrop, Deputy Director PATR:0TS POINT State of South Carolina DEVELOPMEM M11105 Patriots Point Development Authority P.
O. Box 986 Mt. Pleasant, South Carolina 29464
Dear Mr. Waldrop:
Enclosed is the Annual Survey Report conducted on the N.S. Savannah March 26, 1987.
This report should be maintained with your records and a copy filed with the NRC Annual Report.
Thank you for your cooperation and assistance.
Should you have any questions, please do not hesitate to contact me.
Very truly yours, Virgi
. Aut y, D1 ector Division of Ra 'oactive Material Licensing and Compliance Bureau of Radiological Health j
/ms t
Enclosure
\\
@C Lc>5u f E (I)