Monthly Operating Repts for Dec 1987
ML20147E220
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 12/31/1987
From: Reavis J, Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8801210045
Download: ML20147E220 (12)


Text

.

O t

OPERAT!h5 DATA FEFORT DOCKET 50-369 CATE l-15-89 OFERATINS STATUS C0'!PLETED SV

.f. A. Reavis TELEFHCNE 704/373-7567

1. Unit Name: McEUIRE 1
2. Repartir; Fericd: DECEM!ER 1, 1987-DECEM!ER 31,1937 3.LitensedTherea1Pewer(Fat):

3411

4. Naseplate Ratir; (Srcss MWe):

1305+

1 Notes *Nateplate Rating I

5. Design Ele:trical Ratir; (Net N e):

1150 1 (Ercss Ne) calculated as I

6. Maxisus Cependable Ca;a:lty (Gross Ne):

1 1450.000 N A :.90 poner i

7. Mariaan Oe;endable Capa:ity (Net Neh 1150 i fa: tor per Pa;e iii, 1
3. If Changes Occur in Capacity Ratings (itsas Nusber 3 Three;h 7) Since Last i NbREC-0020.

I Re;;rt. Gite Reasons:

1 1

9. Fener Leye1 ie W5ich Restri:ted, If Any (Net b e):
10. Reas:n Fcr Restrictiers, If any:

Ttis M: nth Yr.-te-Date Cusulative

11. H:urs In Repcrtin; Feried 744.0 S,760.0 53,323.0
12. NtA er Of H urs Reacter Was Critical 722.2 6,835.7 36,663.6
13. Rea:ter Reserve State:nn H:urs

--0--

--0--

--0--

14, H:urs sererat:r Cn-Lite 718.0 6,715.7 36,343.2

15. Unit Reserve 5%thun Hours

--0--

--0--

--0--

16. Bress Trereal Energy Becerated (M) 2,251,637 22,115,367 105,069,579
17. Ercss Ele:trits! Ertrgy Sererated (NM) 793,246 7,660,950 36,396,157
15. het Ele:trical Energy Senerated (N H) 762,176 7,343,715 34,665,492 li. Unit Service Fa:ter 96.5 76.7 68.2
20. Unit Availarility fa:ter 96.5 76.7 69.2
21. Unit Capacity F4:t:r (Using M C Net) 59.1 73.0 55.6 E2, Unit Ca;acity Fa: tor (Usir; DER Net) 86.9 71.1 55.1
23. Unit Ferced Cutage Rate 3.5 4.8 13.0
24. Shuth es Sche hled Over hert 6 Myths (Ty:e, Date, and bratien of Each):

........N.o.n.e...............................................................................................................

25. If Snut I:mn At End Of Re;;rt ferted. Estinated Date of Startu;:

E$. Units In Test Status (Frict to C:::ercial Cperationh Forecast Achieved 1%lilAL CRITICALITY Ih!11AL ELECTRICITY CC"ERCIAL OFEUTICN 8801210045 871231 PDR ADOCK 05000369 R

DCD l

[;; a m.-4&iA.h_

m i

JL m

d.-A-E

'E.

.-+

.a aa a

m

-S--

,e4.

.-x--u m

-+*.-a.

-av d.

a 4

e l

1 AVERA6E DAILY UNii '

.A LEVEL t

i

?

DOCKET NO.

50-369 i

UNIT McGuire !

j DATE January 15,1999 CCMPLETED SY J. A. Feavis j

TELEPHONE 704-373-7567 1

i 1

I I

RONTH OECEMIER j

l DAY AVEFJ3E DA!LY FCWER LEVEL CAY AVERASE CAILY F0WER LEVEL (PWE-Net)

(PWE-Net) 1 1122 17 1122 l

2 1122 16 1121 l

3

!!20 19

!!21 I

i 4

1122 20 1122 5

!!!7 21 1123 l

6 1101 22 1120

(

7 1119 23 1120 6

1120 24 1119 t

l 9

1121 25 1115 i

l 10

!!21 26 563 l

11 1122 27 715 2

12

!!21 2B 605 7

13 1120 29 133 14 1121 30 858 4

15 1120 31 973 J

16 1120 4

4

,,,,---,--m

. - -. ~_ - -,, -., -, - -

.-n.-----,.,,

UNIT SHliTDOWNS AND POWER REDUCTIONS DOCKET NO.

_S0-36?_______

UNIT NAME JJGGUIRE_1 DATE _O1615488______ __

REPORT MONTH ____ December _1987_

COMPLETED BY _J._h_REAVISa __

TELEPHONE _HO4)-373_-7S R __

(1)

(2) (3)

(4)

(5) l R

MET-E HOD T

A OF LICENSE l

N Y

S SHUT EVENT SYS-CAUSE AND CORRECTIVE O

1: F DURATION

!O DOWN REPORT l TEM COMPONENT ACTION TO l

l DATE E l HOURS LN lR/X l NO.

l CODE CODE PREVENT RECURRENCE l

60 pl 87 1 l F l A l -- l HB l VALVEX i

n4 GOVERNOR VALVE PROBLEMS I

41 p 87 6 S

B HB VALVEX

  1. 4 GOVERNOR VALVE TESTING 42 p 87 6 F

A HB VALVEX M4 GOVERNOR VALVE PROBLEMS 43 p 87-12-26 S

F ZZ 222222 DISPATCHER PEQUEST 64 p 87-12-27 S

B IE INSTRU NUCLEAR INSTRUMENTATION CALIBRATION 45 p 87-12-27 F

A HB VALVEX

  1. 4 GOVERNOR VALVE PROBLEMS 11 07-12-28 F

25.98 H

3 ZZ ZZZZZZ DURING TESTING OF S/G LEVEL INDICATOR CHANNEL 2, A CARD WAS PULLED ON CHANNEL 4 DUE TO PROCEDURE PROBLEM.

46 p 87-12-30 F

B IE INSTRU NUCLEAR INSTRUMENTATION CALIBRATION t

(1)

(2)

(3)

(4)

F Forced Reason:

Method:

Exhibit G-Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data -

B-Maintenance or test 2-Manual Scram Entry Sheets For License C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NUREG-Ol61)

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error (Explain)

Exhibit I - Same Source H-Other (Explain)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-369 UNIT NAME

_MCGUIRE_1________

DATE _Q1415LS@______ __

REPORT MOtJTH December 1987 COMPLETED BY J.

A.

REAVIS.

1ELEPHONE,12Q41:373:2562___

(1):

(2)

(3)

(4)

(S)

~

R MEF-E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 47 p 87-12-31 S

lF l 22 222222 DISPATCHER REQUEST l

E (1)

(2)

(3)

(4).

F Forced Reason:

Methud:

Exhibit G-Instructions S Scheduled A-Equipment Failure'(Explain) 1-Manual

.for Preparation of, Data B-Maintenance or test 2-Manual Scram Entry Sheets For Licenss C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NUREG-0161)

E-Operator Training & License Examination F-Administrative (5)

G-Operator Error (Explain)

Exhibit I - Same Source H-Other (Explain)

DOCKET NO:

50-369 UNIT:

McGuire 1 DATE:

01/15/88 NARRATIVE

SUMMARY

Month: December, 1987 McGuire Unit 1 began the month of December operating at 96% power, limited by problems with the No. 4 Turbine Governor Valve. The unit was reduced to 88%.

power from 0735 on 12/06 to 1223 on 12/06 to perform tests on the No. 4 Turbine Governor Valve. The unit returned to 96% power at 1630 on 12/06. At 0012 on 12/26, the unit was reduced to 78% power per Dispatcher request. The unit began increasing load at 1034 on 12/27 and held power the same day at 94%, for 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br />, to perform Nuclear Instruaentation Calibration. The unit returned to 96%.

.f power at 2035 on 12/27. At 1322 on 12/28, the unit tripped off line during testing of the Channel No. 2 Level Indicator on the "B" S/G. The unit returned to service at 1521 on 12/29, and increased power to 78%, where power was held to perform Nuclear Instrumentation Calibration. The calibration was completed at 0138 on 12/31, and the unit remained at 78% power for the remainder of the month, per Dispatcher request.

i

i l

l 1

MONTHLY REFUELING INFORMATION REQUEST l

1.

Facility name: McGuire, Unit 1 2.

Scheduled next refueling shutdown: November, 1988 3.

Scheduled restart following refueling:

January, 1989 i

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment? No If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information: N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of fuel assemblies (a) in the core:

193 (b) in the spent fuel pool:

293 8.

Present licensed fuel pool capacity:

1463 Size of requested or planned increase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 l

i i

DUKE PONER COMPANY DATE:

January 15, 1988 Name of

Contact:

J. A. Reavis Phone:

704-373-7567 1

I

j l

r

~0FERATINS DATA REFORT DOCrET 50-370 DATE l-15-SS OPERATIN5 STATUS CCMPLETEDBf J. A. Reavis TELEPHONE 704/373-7567

1. Unit Nase: Mc5UIRE 2
2. Reportic; Feriod: DECEMBER 1,1997 DECEMiER 31,1987
3. Licensed Thernal Foner (PWt):

3411

4. Nateplate Pating (Gross MWe):

130$e i Notes

  • Nameplate Rating 1
5. Design Ele:trical Pating (Net MWeh 1180 1 (Eross MWel calculated as 1
6. Maxieus Dependable Capa:ity (Bross rWe):

I 1450.000 MVA :.90 p:wer.

I

7. Marstue tegendable Capacity (Net rie):

1150 i fa: tor per Page iii, t

2. If Changes Dccur in Capacity Ratin;s (ltets Nester 3 Thrcu;h 7) Sin:e Last i N'JRES-3020.

I Report. Sive Reasers:

l................................I

9. Poner level Te Which Restricted, If Any (Net NWe):
10. Reason For Festrictions, If any:

This Month Yr.-to-Date Cuaulative 11.HoursInReportir;Ferica 744.0 8,760.0 33,624.0

12. Nuster Of H:urs Reatter Was Critical 734.0 7,046.8 24,445.8
13. Reactor Feserve Shutd:wn Hours

--0--

--0--

--0--

14. Hours Eererator On-Lire 732.4 6,957.2 23,927.3
15. Unit Reserve Statdeun H:urs

--0--

--0--

--0--

16. Eress Trersal Energy Gererated (MWW) 2,949,205 22,539,550 77,239,951
17. Gross Electrical Erergy Generated (MWH) 653,613 7,5!!,613 27,075,803
18. Net Ele:trical Energy 6ererated (FWil B26,469 7,572,577 25,936,002
19. Unit Service Fa: tor 98.4 79.4 70.9
20. Unit Availability Fa: tor 99.4 79.4 70.9
21. Unit Ca;a:ity Facter (Using M.5C Net) 96.6 75.2 e6.3 2!. Unit Capa:ity Fa: tor (Usir; CER Net) 94.1 73.3 65.4
23. Unit Ferced Outa;e Rate 1.6 3.3 14.9
24. Shut:: ens 5:$eduled Over Next 6 M:nths (Type, Date, and Duration of Ear'.):

....... Re fn e.U ns.... m y. 2L. 1 RM... 10..v.e ck s............... _ _.................................................

25. If Shut Ocnn At End Of Fe; ort Feriod. Estimated Date of Startup.......................................................
26. Units In Test Status (Prict to C:: ercial 0;erationh Feretast A:hieved INITIAL CRITICALITY INITlat ELECTRICITY COPfiRCIAL OFERATICN e

4 i-i AVERASE DA!LY UNIT POWER LEVEL D3CKET N0.

50-370 7

s UNIT McGuire 2 j

OATEJanuary 15,1988 COMPLETED BY J. A. Feavis TELEPH0h!

704-373 7567 E

i MCN!H CECEM5ER 1

EAY AVERASE IAILY FCWER LEVEL CAY AVERABE DA!LY PCWER LEVEL (MWE-Net)

(PWE-Net) j I

1 122 17 1151 2

967 18 1154 3

1142 19

!!54 1

4 1144 20

!!!2 5

!!43 21 1154 6

1143 22 1154 l

7

!!49 23 1154 6

1152 24 1155 4

9 1152 25 1154 i

10

!!53 26 1155 i

4 l

11 1153 27 1153 1

12 1154 29 1149 13

!!54 29 1148 j

14 1154 3')

1151 15 1153 31 1151 4

1 16 1154 1

1 1

1 J

_ ' s_ _

l T

e nes e

ot n c

S i ae r

_ _g7 R

F tDc u

_6 RE TO c

i o

_S EK U

ufL)

S

_ I_ 5 7

TA ON ro R)

V -

AE O

t rE1 e

_A3 WR 3I snoL6 m

_2_8 E 2 B

Y T

noF( 1 a

0 S

_E 8 R_3 E

G R

TC I i OR/

V E

NR T

RN t st -

O S

CU

- at rG 5

)

I 2IG/A0 C

I 3U1 4

T N

LT F

reoE I

C E

OA M

NL G a e pR I

0C1 7

E R

OR E

OA pheU M

t eSRN t

5_ M_ 0_ J_1_

ROR CE H

I RTU N

C T

i r

(

i O

C RE AO bPyt b

.EEVE CNE OG Y

GT i

rne i

hrt el h

OMTBN OR T

R I

NAA O

DI AE A

TE xonvi x

EfEEF E

NDDH NTT TH D

I U

)

)

T EP ACN ST N

MD 4

5 ET TE AE O

(

(

KI EL E

V RD C

2E CN LE S

E OE E

HC OU PT U

R TP S

NP D

M A

P AP

' AI O

C RI R

BRU m)

EQ an C

ER O

NT F

LE ri E

NO mca GW D

I TT aSl O

L A

S r

p OL O

RFE ccx LF H

TOT S_i E t(

S ll l

l l a aamr N

O T

d uuoe N

R X

X onnth I

T

)

E K

X X

h aaut C

7 5

NE B

X X

t MMAO U

8 OD T

X X

e-(

D 9

PO K

X X

M1 234

)

E 1_

MC C

X X

3 R

O

(

r C

R e

l n

E b

E o

W m

SMD A

G Z

)

i O

e 4

YEO H

H Z

t P

c STC a

(

e l

n D_

D i

N m

A E

a S

T x

S NT R E

N ENO W

H CEPO e

)

O T

I VEN n

s D

N LER n

i T

O a

e

)

U M

l!

l l

c n

H T N p

ni i

S T

TD UWX x

oL a

)

R 3EOFHO/

3 E

i l

T O

MHOSDR

( t t&

p

(

I P

l s

c x

N E

ee i g E

)

U R

2 A

F A

rt rn

(

REASON u

ti

)

(

l L

l r snern io eivoi N

7 a

Raira O

5 Fe rt rl I S c

yT a E p TR 1

t ngr r

x AU 1

nanort rE RO enit oso(

UH mel ati t D

pt el anar ninuurire 1

fl ouif gemeh sqaeepd pt

)

TV PE F

F F

aEMRROAOO 1

e-(

RABCDEFGH ll l

)

2 0

1 1

(

2 E

2 2

2 d

T 1

1 1

e A

l D

7 7

7 d u 8

8 0

ed ce l

rh p

P oc FS 9

0 NO 8

3 4

FS

)

1 l

(

li i

I!

!4 l

ij j I

,!,3

11ij }:)!

':l il

DOCKET NO:

50-370 UNITt McGuire 2 DATE:

01/15/88 NARRATIVE

SUMMARY

Month: December, 1987 McGuire Unit 2 began the month of December out of service due to a Turbine /

Generator trip the previous month. The unit returned to service at 1134 on 12/01 and, following a power hold for Secondary Chemistry, reached 100% power at 1444 on 12/02. The unit then operated at 100% power until 12/20 at 0235 when unit output was reduced to 90% due to a faulty test on a Train "B" Hydrogen Mitigation Circuit. The unit returned to 100% power at 1045 on 12/20, where it operated for the remainder of the month.

MONTHLY REFUELING INFOR):ATION REQUEST 1.

Facility name: McGuire, Unit 2 2.

Scheduled next refueling sh tdown:

May, 1988 3.

Scheduled restart following refueling. August, 1988 4.

Will refueling or resumption of operation thereafter require a technical specification change er other license amendment? Yes If yes, what will these be?

Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unroviewed safety questions? N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting informat ion: N/A 6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, cignificant changes in design or new operating procedures).

7.

Number of fuel assemblies (a) in the core:

193 (b) in the spent fuel pool: 424 8.

Present licensed fuel pool capacity:

1463 Size of requested or planned inct>ase:

9.

Projected date of last refueling which can be accommodated by present licensed capacity: August, 2010 1

l 1

DUKE POWER COMPANY DATE:

January 15, 1998 Name of

Contact:

J. A. Reavis Phone:

704-373-7567 l

McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT 1.

Personnel Exposure For the month of November, no individuals exceeded 10 percent of their allowable annual radiation dose limit.

2.

The total station liquid release for November has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

The total station gaseous release for November has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

't l

  • ,+

e DUKE POWER GOMPANY P.O. HOX G3189 CitARLOTTE, N.O. 28942 HAL H. TUCKER TEl.EPHONE vice rassinent

( W )O N 801 WEELEAR PRODLTTION January 15, 1988 U: S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D. C.

20555 Re: McGuire Nuclear Station Docket No. 50-369 and 50-370

Dear Sir:

Please find attached information concerning the performance and operating status of the McGuire Nuclear Station for the month of December, 1987.

Very truly yours, h, & it 3 Hal B. Tucker JAR /1238/sbn Attachment i

xc:

Dr. J. Nelson Grace American Nuclear Insurers i

Regional Administrator / Region II c/o Dottie Sherman, ANI Library U. S. Nuclear Regulatory Commission The Exchange, suite 245 101 Marietta Street, NW, Suite 2900 270 Farmington Avenue Atlanta, Georgia 30323 Farmington, CT 06032 Mr. Phil Ross INFO Records Center U. S. Nuclear Regulatory Commission Suite 1500 MNBB-5715 1100 Circle 75 Parkway Washington, D. C.

20555 Atlanta, Georgia 30323 Mr. Darl Hood, Project Manager Mr. Richard G. Oehl, NE-44 office of Nuclear Reactor Regulation U. S. Department of Energy U. S. Nuclear Regulatory Commission 19901 Germantown Road Washington, D. C.

20555 Germantown, Maryland 20874 Mr. Robert G. Rogers Mr. W. T. Orders Nuclear Assurance Corporation NRC Pesident Inspector 6251 Crooked Creek Road McGuire Nuclear Station Norcross, Georgia 30092

$* )I i

1

-