Forwards Insp Rept 50-267/88-02 on 880125-29.No Violations or Deviations Noted
ML20147C853
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 02/23/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20147C857 List:
References
NUDOCS 8803030177
Download: ML20147C853 (2)


See also: IR 05000267/1988002

Text

yy_

v

,

.,

1

.

m

.

'

.

_

,x

.y (

JEB,2 31988

.~

'

'

-

.

.

Ih.Repl'y Refer To:

.

Docket: .50-267/88-02-

. -

[PublicService'CompanyofColorado

-

ATTN:

Robert 0. Williams, Jr.

-

~

Vice President,' Nuclear Operations

2420 W. 26th Avenue, Suite 15c

Denver,' Colorado 80211-

Gentlemen:

This refers to the inspection conducted by Mr. C. A. Hackney of this office .

^

.during the: period January 25-29, 1988, of activities authorized by NRC.0perating:

License DPR-34 for the Fort St. Vrain Nuclear. Generating Station, and to the

disr.ussion of our findings with you and other members of your staff at the

conclusion of the. inspection.

Areas examined during the inspection included changes to the emergency plan,

shift staffing and augmentation, knowledge and performance of duties, and-

operational status of the emergency preparedness program. Within these areas,-

-the inspection consisted of selective examination of procedures and

representative records, interviews with personnel, and observations by the NRC

-

inspector.

The inspection ~ findings are documented in the enclosed inspection

report.

Within the scope of the. inspection, no violations or deviations were identified.

We have also examined actions you have taken with regard to previously

identified inspection findings.

The status of this item is identified in

paragraph 2 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

1

Sincerely,

Odging signed By

C I.canan

L. J. Callan, Director

Division of Reactor Projects

Enclosure:

Appendix - NRC Inspection Report

50-267/88-02

cc w/ enclosure:

(ses next page)

RIV:NMEPB D

C:NMEP

DRP/BN

0:DRP

CAHackney;d

WLFisher

TFWesterman

LJCal

n

A /H /88

A /4488

.? /p /88

t/4V88

~

/

ggPHW Bi88jjy

d

p.

,>

--

m

y

-

's

,

.,

..

.

-

Public' Service Company of Colorado

-2-

,

i

cc w/ enclosure:

Manager, Nuclear Production Division

' Fort St. Vrain Nuclear Station

16805 WCR 19\\

Platteville, Colorado

80651

P. Tomlinson, Manager, Quality

Assurance Division

(same address)

Dr. H. G. Olson, Regional Director

FEMA Region 8

Denver Federal Center Bldg. 710

Box 25267

Denver, Colorado 80225-0267

Colorado 'Jadiation Control Program Director

Colorado Public Utilities Commission

/

bec to DMB (IE35)

bcc distrib. by RIV:

  • DRP/B

DRP

  • RRI

R. D. Martin, RA

  • Section Chief, DRP/B
  • Project Engineer, DRP/B

TSS

L. Shea, RM/ALF

  • MIS System
  • RSTS Operator
  • K. Heitner, NRR Project Manager
  • RIV File

DRS

  • R. Hall

NMEPB

  • Inspector (s)
  • W. L. Fisher

R. L. Bangart

D. B. Matthews, NRR

  • w/766