ML20147C743
| ML20147C743 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 02/23/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20147C748 | List: |
| References | |
| GL-83-05, GL-83-5, NUDOCS 8803030148 | |
| Download: ML20147C743 (3) | |
See also: IR 05000498/1987075
Text
[
fN:
'
.t
a,
,
e
,
r
.
..
..
,
.,.
.In Reply Refer To: .
Dockets: -50-498/87-75
-
' '50-499/87-75
FED 23 W
-
'
,
,
'e
T
Houston Lighting-& Power Company
F
ATTN:
J. H; Goldberg-
_
-
Group Vice President,' huclear
P.O. Box 1700
,'
. Houston, Texas 77001
,
Gentlemen:
This1 refers to the inspection conducted by Messrs..D.
R.' Carpenter, H. F.
Bundy, J. E. Bess, E. P. Hildebrand and other members of this office
.
during the period. December 1-31,-1987, of activities authorized by NRC Operating
'
' License NPF-71 and Construction-Permit CPPR-129, for the South Texas Project,
Units 1 and.2, and to the discussion of our findings with Mr. W. H. Kinsey and
other members, of your staff at the conclusion of the inspection.
Areas examined during the inspection included licensee' action on previously
rsported items, slave relay surveillance deficiency due to personnel error, TMI
and Generic Letter 83-28 action item followup, IE Circulars, Class 1E batteries
inoperable, cold weather preparations, chemical detection system inoperability,
safety '}njection pumps recirculation flow, Unit 2Lpreoperational test program,
incore thimble tube inspections, Unit I significant events, status of
incomplete preoperational tests (Unit 1), status of auxiliary feedwater system
failure (Unit 1), and site tours. 'Within these areas, the inspection consisted
of selective examination of procedures and representative records, interviews
with personnel, and observations by the NRC inspectors.
The inspection
findings are documented in the. enclosed inspection report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Your response should be based on the specifics contained in the
Notice of Violstion enclosed with this letter.
Two unresolved items are identified in paragraphs 5 and 11 of the enclosed
inspection report.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 3 of the enclosed report.
D: DRP/hY'7
I' : D /D
DRS/PSS
DRP/D
F.
dy
REIreland
ristable
LJCallan
t.488
dl/%/88
A /2 fl88
L/1}88
$
'8803030148 880223
I
'
ADOCK 05000498
l
l
,0
.
. 3
-
,
[E
.4
.
'
'
- .
.,
Houston Lighting & Power Company
-2 -
~
,
The4 response requested.by this letter-.is not subject to the clearance
..
procedures of'the Office of Management and Budget as required by the~ Paperwork-
Reduction Act of~1980, PL.96-511.-
'
Should you have any_ questions concerning this inspection, we will be pleased to
discuss.them with you.
. Sincerely,.
,
~ Original 5fgned Dy-
,
,
~ L J. Calha
L. J. Callan, Director
~
-Division of Reactor Projects-
Enclosures:
'
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report ,
50-498/87-75
50-499/87-75-
~
cc w/ enclosures:
Houston Lighting & Power Company
_,
ATTN:
M. Wisenberg, Manager
Nuclear Licensing
P.O. Box 1700
Houston, Texas 77001
.
. Houston Lighting & Power Company
ATTN: Gerald E. Vaughn, Vice President
Nuclear Operations
P.O. Box 1700
'
Houston, Texas 77001
Contral Power & Light Company
ATTN:
R. L. Range /R. P. Verret
P.O. Box 2121
Corpus Christi, Texas 78403
City Public Service Board
ATTN:
R. J. Costello/M. T. Hardt
P.O. Box 1771
San Antonio, Texas 78296
City of. Austin
ATTN:
M. B. Lee /J. E. Malaski
P.O. Box 1088
Texas Radiation Control Program Director
,
.
e
_
. .
. - n-
- -
.
> > -
+
"
_,
,
N - ,.: ^
,
e
,
y(-
yd . , '
-
-
,
'
'
- w sy'
.- ) , .
x.
~
,
I [, .- ^
8..
s
,-
t
,
-
,
,
w
- ,
,
,
-
-
..
.
c
. .
".
.
W
'
,,,, ^ . Houston' Lighting & Power Company.
-3-
'
-
^
'
-
.
-
-
'
-
<
'
,
,
,
.
_
_
,
-l : ;..
'
fbcc to DM8'(IE01))
-
,
.
i l
-
'
_
_
~
bcc distrib. by RIV:
.
-
- DRP:
.,
- RRI-OPS
.
-
,TR..D/-Martin, RA--
- RRI-CONST.
'
'
,
L*Section' Chief'(DRP/D)
.'RPSB-DRSS
+
. MIS System:
- RIV File
- Lisa Shea,.RM/ALF
- H.
Bundy--
'
-
R. Bachmann, OGC.-
~*R.. Hall
y
- P. Kadambi, NRR Project Manager
D.= Powers-
7:
. TSS~
'
R. Haag'
.
>*DRS
M.' Murphy:
J.
P.' Clausner
<
>
E. ' P.' Hildebrand
- w/766
'
'
,
5
%
%
.'
,
,
4
s
?
r
j
~
'[.
4
t
t
J
l
.
)
I
b
i
L
t
s
-
u- -
. . - - - - - -
__--_.--_-_______-----._-_-_.._----..___--._---_--__-_.,-----._.a_
. -
-
- . - - -
- .
- - -
- - - -
. -
---