IE Inspec Repts 50-298/78-17 on 781002-05 During Which 2 Items of Noncompliance Were Noted:Failure to Follow Procedure for Control of Valves in Liquid Control Sys & to Sched Requal Lectures for Lic Operators
ML20147C614
Person / Time
Site: Cooper Entergy icon.png
Issue date: 10/27/1978
From: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20147C580 List:
References
50-298-78-17, NUDOCS 7812180356
Download: ML20147C614 (8)


See also: IR 05000298/1978017

Text

_

-________- ____ _

-

l

l

.

9

U. S. NUCLEAR REGULATORY COMMISSION

OFFICE OF INSPECTION AND ENFORCEMENT

REGION IV

Report No. 50-298/78-17

'

Docket No. 50-298

License No. DPR-46

Licensee:

Nebraska Public Power District

P. O. Box 499

Columbus, Nebraska 68601

Facility Name: Cooper Nuclear Station

Inspection At: Cooper Nu:: lear Station, Nemaha County, Nebraska

Inspection Conducted: October 2-5, 1978

Principal

T * N do

A

2 ~'

B

Inspector:

E. H. Johnson, Reactor Inspector

Date

.

It/2 7/g

G. L. Constable, Reactor Inspector

Date

Approved By:

Y2ddw-

/o/n b r

G. L. Mad en, Chief, Reactor Operatiens &

Date

"

Nuclear Support Branch

Inspection Summary

Inspection on October 2-5,1978 (Report No. 50-298/78-17)

Areas Inspected:

Routine, unannounced inspection of offgas system; requalifi-

cation training program; safety limits, limiting safety system settings and

limiting conditions for operation; maintenance activities; and follow up on

IE Circular 78-08. The inspection involved thirty-nine (39) inspector-hours

on-site by two (2) NRC inspectors,

e

Results: Of the five areas inspected, no items of noncompliance or deviations

were noted in three areas.

Two items of noncompliance (Infraction - failure to

i

follow the locked valve procedure for the control of valves in the standby

liquid control system, paragraph 5; Deficiency - failure to schedule requal-

ification lectures for licensed operators as required tsy the requalification

program, paragraph 4) were noted in two areas.

781218035%

_ - - - _ _ _ _ - - - - - _

- _ - _ _ - -

..

.

.

-2-

  • ~

'

i

DETAILS

-

e

r

Persons Contacted

P. L. Ballinger, Reactor Engineer

.

L. F. Bednar, Electrical Engineer

P. J. Borer, Technical Assistant to the Station Superintendent

R. D. Creason, Shift Supervisor

W. F. Gilbert, Training Coordinator

'

L. C. Lessor, Station Superintendent

D. E. Mayer, Mechanical Engineer

E. R. Noyes, Engineering Supervisor

J. L. Peaslee, Shift Supervisor

R. W. Seier, Qualtiy Assurance Supervisor

  • P. V. Thomason, Assistant to the Station Superintendent

M. G. Williams, Operations Supervisor

  • Present at the exit interview.

In addition to the above technical and supervisory personnel, the

inspector held discussions with various maintenance, operations,

technical support and administrative members of the licensee's

staff.

1.

Plant Status

During the period of this inspection, the plant was in routine power

operation at approximately 90% power.

The inspectors conducted a

walk-through of accessible areas of the plant.

Several minor material

discrepancies were noted and brought to the attention of the Shift

Supervisor.

-

The inspectors noted that walk-through radiation monitors are installed

in various locations of the plant where radioactive contamination is

possible.

However, these monitors did not appear to be regularly

used by Station personnel when leaving such areas.

The inspectors

discussed this item with the Assistant Station Superintendent at the

exit interview and expressed their concern that there does not appear

to be clear guidance on the use of these walk-through radiation

monitors.

2.

Review of Offgas System

The objective of this inspection effort was to review the design,

operation, maintenance, and installation of the offgas system in response

to a request from NRC IE Headquarters for this information.

The specific items reviewed were the physical location and installation

of offgas system piping and components, system controls, loop seals,

ventilation and gas monitors associated with the offgas piping areas

l -.

.

. . . . _ . - - - - - - - -

,

,

-3-

and licensee procedures for conducting maintenance on offgas piping

and handling abnormal conditions with the offgas system.

No items of noncompliance or deviations were noted in this area. The

infonnation gathered in this portion of the inspection has been

forwarded to HRC IE Headquarters.

3.

Environmental Qualification of Safety-Related Electrical Eqtipjmegt

The objective of this inspection effort was to review the licensee's

action on IE Circular 78-08, " Environmental Qualification of Safety-

Related Electrical Equipment."

The licensee has received all the reference material associated with

this Circular and has assigned responsibility to the Quality Assurance

Supervisor for reviewing the references and assembling the available

on-site documentation to support the environmental qualification of

safety-related electrical equipment.

The QA Supervisor is being

assisted by the on-site engineering staff.

A formal schedule for

completion of the review has not been established, but a licensee

representative indicated to the inspector that review should be

substantially completed by December 1, 1978.

The inspector noted that

the licensee has not yet established any areas requiring corrective

action.

The inspector indicated that this area would received further follow-

up during subsequent inspections.

4.

Requalification Training

The objective of this inspection effort was to ascertain whether the

licensed operator requalification training program is effective and

in conformance with regulatory requirements.

The inspector reviewed the ongoing requalification training program

including the following training records.

Annual Examintion for 1978

Lecture Schedule

Attendance Records

Records of On-the-Job Training

Records of Control Manipulations

Records of Supervisory Evaluations

The annual requalification examination was given in March 1978.

The

average grade was 91.6%.

The lowest average grade was 88%.

Five

individuals made less than 80% but greater than 70% on individual

sections of the exam.

Attendance at the requalification lecture

>

_

_ - - - - - - - - - - - - - - - -

_

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _

.

,

-4-

series is generally required of all licensed operators and senior

operators.

All training is conducted at the senior operator level

of understanding.

The lectures are given at random intervals during

the year as plant workload permits when two or more operators and

an instructor are available.

As of the date of the inspection,

eleven lectures were listed on the attendance record.

The Training

Coordinator stated that additional lectures were planned for later

in the year.

Within the scope of this inspection effort one item of noncompliance

was identified.

l

The operator and senior operator requalification program for Cooper

,

Nuclear Station requires that an annual written examination be given

to all licensed operators and senior operators to determine areas in

which requalification training is needed.

A planned lecture series

is required where the annual examination indicates a need for additional

'

training.

A minimum grade of 80% on each section is needed to exempt

an operator or senior operator from required attendance at the

lecture on that section.

Contrary to the above, five individuals made

less than 80% (but greater than 70%) on four sections of the annual

exam, yet lectures on these sections were not scheduled nor was there

any indication of a requirement for these five individuals to attend

the required lectures.

-

Prior to the completion of the inspection, the inspector was presented

with a revised requalification schedule that was expanded to include

lectures on the required subjects and indicated the required attend-

ance at these lectures.

Since this constitutes the corrective action

for this item, no written response will be necessary for this noncom-

pliance.

The completion of the required training by the licensed

personnel noted above will be reviewed during a future inspection.

5.

Standby Liquid Control System Valves

During this inspection the inspector conducted a walk-down of the

standby liquid control system to determine that system valves were in

the proper start positions.

The inspector noted that valve SLC-10,

Standby Liquid Control Outlet Valve, from the storage tank was not

lock-wired open as required by Process and Instrument Drawing 2045.

A broken lock wire was found in the vicinity of this valve.

A check

of the Valve Seals Log (Attachment E to Procedure 1.4) indicated that

valve SLC-10 was to have been lock-wired open with the serialized

lead seal lock wire noted by the inspector.

The check of the Shift

Superivsor's Log revealed that on September 25, 1978 a surveillance

procedure had been performed on the Standby Liquid Control System

-

which required the removal of the valve seal on SLC-10; however, the

.

_ - - _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ . - _ - _ - -

-

_

_ ....- _ _

.

.

-5-

valve was not resealed following completion of the surveillance test.

Procedure 1.4 requires that whenever a seal is broken for any reason,

the Shift Supervisor be notified and the seal returned to him.

He

will then update the valve seals log and ensure that the valve is

resealed when returned to its normal position.

Criterion V to 10 CFR 50, Appendix B, requires that activities

affecting quality be prescribed by written approved procedures and

that these attivities be accomplished in accordance with these pro-

cedures.

This requirement is amplified in the licensee's Quality

Assurance Manual, Section 2.5.

The failure to control the removal and reinstallation of the valve

seal on valve SLC-10 is contrary to the requirement stated above and

is an item of noncompliance.

No other items of noncompliance or deviations were noted in this

area.

During the above review of valves in the Standby Liquid Control System,

the inspector noted that valve SLC-28 did not have a " locked closed"

tag on the valve, nor was the valve lock-wired.

Process and Instru-

mentation Drawing 2045 indicates that the valve is locked closed.

This apparent discrepancy was brought to the attention of the Shift

Supervisor who entered the valve in the Valve Seals Log and issued a

lock wire for the valve in accordance with the procedure.

6.

Safety Limits, Limiting Safety System Settings, Limiting Conditions

for Operation

The objective of this inspection effort was to review the licensee's

adherence to Technical Specification requirements for safety limits,

limiting safety system settings and limiting conditions for operation.

The inspector reviewed licensee procedures, records of calibration,

recorder charts, selected maintenance activities, records of completed

surveillance tests and conducted inspections of selected safety systems

to determine conformance to Technical Specification requirements.

The Technical Specification items reviewed are indicated below.

Requirement

TS_

Items Reviewed

MCPRj[1.07

1.1.A

P-2 computer printouts 9/1/78

through 10/4/78

LPRM Operability

3.1.1

Same as above

_ _ _ - _ _ _ _ _

_ _ _ _ _ _

.

.

-6-

Requirement

TS

Items Reviewed

SBLC Operability

3.4

1978 maintenance activities

on SBLC

Visual inspection of SBLC

system valves

Selected SBLC system surveil-

lance test records

J

Reactor Heatup Rate

3.6.A.1

Recirculation temperature

f 1000F/hr

recorder charts 5/1-4/78 &

5/ 31/78

Reactor Periods on

6.2.7.A.4

Source range / intermediate

Startup

range level recorders 5/1-4/78

& 5/ 31/ 78

LC0 for Recirculation

3.6.A.5

GOP 2.1.15 data sheet dated

Pump Startup

10/1/78

HPCI System Lineup for

3.5.C

Valve and switch lineup on

Standby

control room panel

Core Spray System Lineup

3.5.A

Valve and switch lineup on

for Standby

control room panel

Operability of SW Subsystems

3.12.C.2

SP 6.3.18.1 data sheet dated

with Inoperable Service

10/2/78 to verify operability

Water Pump

of remaining SW pumps

Operability of Diesel

3.5.F

Surveillance procedure data

Generator & associated

sheets to verify remaining

ECCS Components with one

diesel and associated ECCS

Diesel Out-of-Service

Components operable for

period 9/12-15/78

Diesel Generator Lineup

3.9.A.2

Inspection of diesel generator

for Standby

and control room panels for

normal lineup and system

parameters

No items of noncompliance or deviations were noted in this area, except

as described in paragraph 5 above.

7.

S_ource Range Indications for Startup

During the review of source range level of recorder charts for reactor

startups performed on May 1,1978, the inspector noted the following

discrepancies which were discussed with the Assistant Station Super-

intendent at the exit interview.

_ _ _ ~ . , . _ -

---

. _ _ _ . _

_

_ _ -_

- - - , - - _ _ , ,

_ - - - - - -

.

.

-7-

Upon reviewing the source range level recorder chart the inspector

noted that the only annotations contained on this chart were the

time the chart was put on and removed from the recorder.

Such other

j

information as time of reactor criticality, and shifting recorder

speeds from slow to fast were not recorded.

The inspector expressed

his concern that the lack of such information on recorder charts

prevents any adequate reconstruction of events.

The Assistant to the

Station Superintendent indicated that the necessity of properly annotat-

ing recorder charts would be stressed to operating personnel.

This

item will remain unresolved pending review of licensee's actions on

4

this matter.

(Unresolved Item 7817-1)

The source range recorder chart is a two panel recorder, each panel

capable _of recording either of the two source range channels.

It

was noted that during the training criticals being performed on May 1,

1978, at approximately 0800, one of the two source range level

recorder pens was not recording.

Chart indications show that one

of the two pens was stuck.

The inspector expressed his concern that

this condition was not noted by the operating staff for some period

i

of time, although training criticals were in progress.

The inspector

reviewed the licensee's procedures for reactor startup and determined

l

that there are no administrative controls to ensure that monitoring

instrumentation is recording as required.

The Assistant to the Station

i

Superintendent indicated that this item would be reviewed.

This item

will remain unresolved pending results of the licensee's review.

(Unresolved Item 7817-2)

8.

Maintenance

The objective of this inspection effort was to review the qualifica-

tion of selected maintenance personnel to determine that these personnel

were adequately prepared to perform safety-related maintenance by

virtue of previous. experience or training provided by the licensee.

The general requirements for such training are contained in ANSI

Standard 18.7-1972.

The inspector reviewed the personnel records and training records for

selected maintenance personnel.

No items of noncompliance or deviations

were noted in this area.

9.

Unresolved Items

Unresolved items are matters about which more information is requried

to ascertain whether they are acceptable items of noncompliance or

deviations.

The following unresolved items were identified during

this inspection:

7817-1

Recorder Chart Annotation (paragraph 7)

7817-2 Operability of Instrumentation Recorders (paragraph 7)

-

_

_

.

.

-8-

10.

Exit Interview

-

The inspector met with the Assistant to the Station Superintendent

at the conclusion of the inspection.

The scope of the inspection

and the findings were discussed.

The Assistant to the Station Super-

intendent acknowledged the findings relative to the items of

noncompliance, and unresolved items detailed above and indicated

that these items would be reviewed and corrected.

The inspector

.

indicated that the corrective action had been reviewed for the item

of noncompliance noted in paragraph 4 above and no further response

would be required for this item.

)

i

.

i