. _ _ _ _ _ _ _ _ _ _ _ ______
)
h
.
r
e
- 0
%,O
UNITED STATES
NUCLEAR REGULATORY COMMISSION
=
g
[I
n
REGION IV
b
j
611 RYAN PLAZA ORIVE, SUITE 1000
$*
2
,,
g
3.,,.*/
October 30', 1978
.
In Reply Refer To:
Docket No. 50-298/78-17
Nebraska Public Power District
ATTN: Mr. J. M. Pilant, Director
Licensing and Quality Assurance
P. O. Box 499
Columbus, Nebraska 68601
Gentlemen:
This refers to the inspection conducted by Messrs. E. H. Johnson and
G. L. Constable of this office during the period October 2-5, 1978, of
activities authorized by NRC Operating License DPR-46, and to the
discussions of the findings with Mr. P. V. Thomason.
Principal areas examined during the inspection included:
(1) review of
offgas system; (2) requalification training program; (3) safety limits,
limiting safety system settings and LC0's; (4) mair,tenance activities;
and (5) follow up IE Circular 78-08.
Within these areas, the inspection
consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspectors.
Two new unresolved items were identified and are included in the enclosed
report.
Based on the results of this inspection it appears that certain of your
activities were not conducted in full compliance with NRC requirements, as
set forth in the Notice of Violation, enclosed herewith as Enclosure (1).
This notice is sent to you pursuant to the provisions of Section 2.201 of
the NRC's " Rules of Practice," Part 2, Code of Federal Regulations.
Section
2.201 requires you to submit to this office within 20 days of your receipt
of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you, and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved.
Since the
corrective action for Deficiency B of Enclosure (1) was accomplished prior
to the completion of the inspection and verified by the inspector, no
further reply is required for this item at this time.
781218034g
...
_ . _ _ _ _ _ _ _ _ _ - _ _ _ _ ._
. . _ . _ _ _ _ - _ _ _ _ _ _
.
.
Nebraska Public Power District
-2-
October 30, 1978
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
4
Room.
If this report contains any information that you or your contractors
believe to be proprietary, it is necessary that you make a written applica-
tion within 20 days to this office to withhold such information from public
-
disclosure. Any such application must include a full statement of reasons
l
on the basis of which it is claimed that the information is proprietary
and should be prepared so that the proprietary information identified in
i
<
'
the application is contained in a separate part of the document.
If we do
not hear from you in this regard within the specified period, the report
will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be
pleased to discuss them with you.
Sincerely,
hS*kokwd
'G. L. Madsen, Chief,
Reactor Operations and
i
Nuclear Support Branch
Enclosures:
1.
,
2.
IE Inspection Report No. 50-298/78-17
.
cc w/ enclosures:
L. C. Lessor, Superintendent
Cooper Nuclear Station
P. O. Box 98
a
Brownville, Nebraska 68321
_ - _ _ _ - _ _ _ - _ .