Forwards SALP 7 Board Insp Repts 50-282/87-01 & 50-306/87-01 for June 1986 - Nov 1987.Improvements Needed in Functional Area of Training & Qualification Effectiveness
ML20147C516
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 02/25/1988
From: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Larson C
NORTHERN STATES POWER CO.
Shared Package
ML20147C519 List:
References
NUDOCS 8803030099
Download: ML20147C516 (3)


See also: IR 05000282/1987001

Text

'

l,

(G

%

.

,

%'

4

e.

_

FEB' 2 5 1988

Docket No. 50-282

Docket No~. 50-306
Northern States' Power Company

' ATTN: -Mr. C. E. Larson

Vice President, Nuclear

Generation

414 Nicollet Hall

Minneapolis,-MN 55401

Gentlemen:

Enclosed for your review, prior to our scheduled meeting on March 11, 1988, is

the SALP 7 Board Report for the Prairie Island Nuclear Power Plants, covering

the period June 1,1986, to November 30, 1987.

In accordance with NRC policy, I have reviewed the SALP Board Assessment and

concur with its ratings. Overall, during the assessment period, your

performance was found to be excellent.

You have maintained a high level of

regulatory and safety performance for the past several years. Continuance of

this performance was exemplified by the fact that no functional areas declined,

six maintained a Category 1 rating, four remained a Category 2 rating, and one

area (surveillance) improved from a Category 2 rating to a Category 1 rating.

Furthermore, although Operations remained a Category 2, the SALP Board noted

an improvement in the area with an improving trend near the end of the

assessment period.

The NRC also' notes the superior reliability of Unit 2 which ran continuously

for more than 300 days by the end of the SALP period, and subsequent to the

period continued to run for a total of 406 days before it was shut down for

refueling. Simultaneously, Unit 1 operated for more than 180 days during the

assessment period. This type of operating record is a positive reflection on

the maintenance program and on the entire staff at Prairie Island.

One functional area where improvements are needed was Training and Qualification

Effectiveness. Poor performance on the part of senior reactor operators on NRC

administered requalification exams midway through the period resulted in the

issuance of a Confirmatory Action Letter and in a management meeting regarding

the remedial measures needed. The overall rati1g for this area is unchanged

from the previous assessment period in part because of the good performance

of new senior reactor operator candidates during NRC administrative

examinations late in the period.

s\\

Teol

'

'C803030099 880225

PDR- ADOCK 05000282

0

DCD

L

.

t

,

,

-

.

--

..

Northern States Power Company

2

FEB 2 51988

While you will have sufficient opportunity to present your comments at the SALP

meeting scheduled for March 11, 1988, we also-solicit your written comments

within 30 days after the meeting to enable us to thoroughly evaluate your

comments and provide you with our conclusion relative to them.-

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the SALP

Report will be placed in the NRC's Public Document Room.

Should you have any questions concerning the SALP Report, we would be pleased

to discuss them with you.

Sincerely

. Be t Davfs

Regional Administrator

s

Enclosure: SALP 7 Board Reports

No. 50-282/87001(DRP);

No. 50-306/87001(DRP)

cc w/ enclosure:

E. L. Watz1, Plant Manager

DCD/DCB (RIDS)-

-

Licensing Fee Management Branch

Resident Inspector, RIII Prairie

Island

Resident Inspector, RIII Monticello

John W. Ferman, Ph.D. ,

Nuclear Engineer, MPCA

State Liaison Officer, State

of Minnesota

T. E. Murley, NRR

Regional Administrators

RI, RII, RIV, RV

Sie

R T

RII

RIII

R

RI

R

9nf0

W

Passehl/jlr

ette

JMcBarger

arski

xelson

G d

nd

'

7-n-d

p

s ./2

/ #

phs

WP

\\

\\

Greentnan

N

Miller

f

k

RI, (DayPk

7

s

l

)aff)

Y N

i

!

l

L

N

~

jg

.

,. g.

o

,1

i

..

. . .

.

.

w

.

-Northern States Power Company

3

FEB 2 51988

DistributionQCont'd):

L. W.'Zech, Chairman

K. C. Rogers, Comissioner

F. M. Bernthal, Comissioner-

-

T. M.- Roberts, Commissioner

lK. M. Carr,. Commissioner

D. DiIanni, NRR Project Manager

M. Virgilio, NRR Director, Project Directorate III-1

J. Lieberman, Director, Office of Enforcement

'A. Ramey-Smith,-SALP Coordinator,'NRR

RIII PRR

RIII SGA

INPO

~DRP, DRS, DRSS Section

and Branch Chiefs