ML20147A823
| ML20147A823 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 02/23/1988 |
| From: | Calvo J Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML20147A828 | List: |
| References | |
| NUDOCS 8803010364 | |
| Download: ML20147A823 (7) | |
Text
.
UNITED STATES E
k NUCLEAR REGULATORY COMMISSION
%.....};E WASHINGTON, D. C. 20555 3
LOUISIANA POWER AND LIGHT COMPANY DOCKET NO. 50-382 WATERFORD STEAM ELECTRIC STATION, UNIT 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 30 License No. NPF-38 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for amendment by Louisiana Power and Light Company (the licensee) dated October 27, 1987, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Semission; C.
There is reasonable assurance (i) that the activities authorized by this amendmant can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable I
requirements have been satisfied.
8803010364 880223 PDR ADOCK 05000392 P
2.
Accordingly,.the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No.
NPF-38 is hereby amended to read as follows:
(2) Technical Specifications and Environmental Protection Plan The Technical Specifications contained in Appendix A,-as revised through Amendment No.
, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION f J ose A Calvo, Dire or j/p# Project Directorate - IV If Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance: February 23, 1988
s ATTACHMENT TO LICENSE AMENDMENT N0.30 TO FACILITY OPERATING LICENSE NO. NPF-38 00CKET N0; 50-382 Replace the following page of the Appendix A Technical Specifications with the attached page.
The revised page is identified by Amendment number and contain vertical. lines indicating the areas of change.
The corresponding overleaf page is also provided to maintain document completeness.
Remove Insert 3/4 3-68 3/4 3-68 f
p l
L
[
l t
l 2
1 L
- -. ~ -
1
~
w TABLE 4.3-9 (Continued)
/
A TABLE NOTATIONS
- At all times.
- 0uring WASTE GAS HOLDUP SYSTEM operation.
- When irradiated fuel is in the spent fuel pool.
(1) The CHANNEL FUNCTIONAL TEST shall also demonstrate that automatic isolation of this pathway and control room alarm annunciation occurs if any of the following conditions exists:
1.
Instrument indicates measured levels above the alarm / trip setpoint.
2.
Circuit failure.
3.
Instrument indicates a downscale failure.
" (2) The CHANNEL FUNCTIONAL TEST shall also demonstrate that control room alarm annunciation occurs if any of the following conditions exists:
1.
Instrument indicates measured levels above the alarm setpoint.
2.
Circuit failure.
(3) The initial CHANNEL CALIBRATION shall be performed using one or more of the reference standards certified by the National Bureau of Standards (NBS) or using standards that have been obtained from suppliers that participate in measurement assurance activities with NBS.
These'~ standards shall permit calibrating the system over its intended range of energy and measurement range.
For subsequent CHANNEL CALIBRATION, sources that have been related to the initial calibration shall be used.
(4) The CHANNEL CALIBRATION shall include the use of standard gas samples containing a nominal:
1.
Zero volume percent hydrogen, balance nitrogen, and 2.
Four volume percent hydrogen, balance nitrogen.
(5) The CHANNEL CALIBRATION shall include the use of standard gas samples containing a nominal:
1.
Zero volume percent oxygen, balance nitrogen, and l
2.
Four volume percent oxygen, balance nitrogen.
(6) The CHANNEL FUNCTIONAL TEST shall also demonstrate that automatic isolation of this pathway occurs if the instrument indicates measured levels above the alarm / trip setpoint and that control room alarm annunciation occurs if any of the following conditions exists:
1.
Instrument indicates measured levels above the alarm set.
2.
Circuit failure.
3.
Instrument controls not set in operate mode.
WATERFORD - UNIT 3 3/4 3-67 l
N INSTRUMENTATION 3/4.3.4 TURBINE OVERSPEED PROTECTION LIMITING CONDITION FOR OPERATION 3.3.4 At least one turbine overspeed protection system shall be OPERABLE.
APPLICABILITY: MODES 1, 2*, and 3*.
ACTION:
a.
With one stop valve or one control valve per high pressure turbine steam lead inoperable and/or with one reheat stop valve or one reheat intercept valve per low pressure turbine steam lead inoperable, restore the inoperable valve (s) to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, or close at least one valve in the affected steam lead or isolate the turbine from the steam supply within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.
b.
With the above required overspeed protection system otherwise inoperable, with 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> isolate the turbine from the steam supply.
SURVEILLANCE REQUIREMENTS 4.3.4.1 The provisions of Specification 4.0.4 are not applicable.
4.3.4.2 The above required turbine overspeed protection system shall be demonstrated OPERABLE:
a.
At least once p:r 31 days by cycling each of the following valves through at least one complete cycle from the running position.
1.
Four high pressure throttle valves, i
2.
Four high pressure governor valves.
3.
Six low pressure reheat stop valves.
4.
Six low pressure reheat intercept valves.
b.
At least once per 31 days by direct observation of the movement of l
each of the above valves through one complete cycle from the running position.
c.
At least once per 18 months by performance of a CHANNEL CALIBRATION on the turbine overspeed protection systems.
d.
At least once per 40 months by disassembling at least one of each of i
the above valves and performing a visual and surface inspection of valve seats, disks and stems and verifying no unacceptable flaws or corrosion.
e.
At least once per 40 operating months by inspecting the installed light low pressure turbine discs, and at least once per 60 operating months by inspecting the installed heavy low pressure turbine discs.
- With any main steam isolation valve and/or any main steam line isolation i
valve bypass valve not fully closed.
WATERFORD - UNIT 3 3/4 3-68 Amendment No.30
-