ML20141N230
ML20141N230 | |
Person / Time | |
---|---|
Site: | Palisades |
Issue date: | 02/26/1986 |
From: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
To: | Buckman F CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
Shared Package | |
ML20141N231 | List: |
References | |
NUDOCS 8603040537 | |
Download: ML20141N230 (2) | |
Similar Documents at Palisades | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML18066A6871999-10-19019 October 1999
[Table view]Forwards Response to NRC 990908 RAI Re Inservice Insp Program Relief Request 14.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6881999-10-19019 October 1999 Forwards Rev 5 to Palisades Nuclear Plant COLR, Per Requirements of TS 6.6.5.Ltr Contains No New Commitments & No Revs to Existing Commitments ML18066A6841999-10-13013 October 1999 Forwards Insp Rept 50-255/99-10 on 990812-0921.One Violation Noted Re Adherence to Radiological Protection Procedure Requirements.Violation Being Treated as Ncv,Consistent with App C of Enforcement Policy ML18066A6781999-10-0707 October 1999 Summarizes 991005 Meeting at Region III to Discuss Radiation Protection Program at Palisades.Topics Discussed Included Management Changes in Radiation Protection Program & Actions Taken to Correct Deficiencies Identified During 1998 Outage ML18066A6651999-10-0505 October 1999 Informs of Completion of Review of Palisades Plant 25-year Tendon Surveillance Rept & Associated post-surveillance Regression Analysis Submitted by Ltrs Dtd 971218,980223 & 980925.Forwards SE Supporting Performance of Surveillance ML18066A6721999-10-0404 October 1999 Forwards Operator Licensing Exam Rept 50-255/99-301(OL) for Initial Operator Licensing Exams at Palisades NPP Completed on 990614.Two RO Applicants & Two SRO Applicants Failed One or More Portions of Respective Exams & Were Denied Licenses ML18066A6741999-10-0202 October 1999 Forwards MOR for Sept 1999 for Palisades Nuclear Plant & Operating Data Rept Sheet for Month of Aug 1999.MOR for Aug 1999 Inadvertently Had Copy of Ref Data Sheet for Apr 1999 Data ML18066A6791999-10-0101 October 1999 Provides Response to RAI Re Draft Rept, Study of Air- Operated Valves in Us Nuclear Power Plants ML18066A6691999-09-30030 September 1999 Advises of Plans for Future Insp Activities at Facility for Opportunity to Prepare for Insps & to Provide Feedback on Any Planned Insps Which May Conflict with Plant Activities ML18066A6621999-09-30030 September 1999 Notifies NRC That Util Will Implement ITS at Plant on or Before Oct 31,2000 & Attachments 1 & 2 Contains Request for License Condition Which Relates First Performance of New or Revised Surveillance Requirements to Implementation of ITS ML18066A6601999-09-29029 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator Licensing Examinations ML18066A6561999-09-28028 September 1999 Discusses Closeout of GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps. Understands That Util Will Address Concerns Raised by Insp Team at Future Date ML18066A6531999-09-23023 September 1999 Forwards Insp Rept 50-255/99-14 on 990831-0901.No Violations Noted.Insp Results Indicated with Crsd on-line (Non Outage) Planning & Scheduling Program Provided Effective Coordination & Established Appropriate Radiological Control ML18066A6471999-09-17017 September 1999 Forwards Final Clean Copies of ITS & Bases Pages Which Incorporate All Changes Proposed in Listed Ltrs.Clean Copies Also Incorporate Some Editorial Changes & Bases Clarifications as Result of Ongoing Reviews to LCOs ML18066A6441999-09-15015 September 1999 Informs That as Result of 980908 Response to RAI Re GL 92-01,Rev 1,Suppl,staff Revised Info in Rvid & Released Info as Rvid Version 2 ML18066A6431999-09-0808 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Operator License Applicants During Wk of 000522,in Response to Nl Haskell ML18066A6381999-09-0808 September 1999 Forwards Request for Addl Info Re ISI Program Relief Request 14 for Palisades Plant ML18066A6391999-09-0303 September 1999 Forwards Insp Rept 50-255/99-09 on 990522-0811.No Violations or Deviations Noted ML18066A6331999-09-0202 September 1999 Forwards Monthly Operating Rept for Aug 1999 & Revised Monthly Operating Rept for Apr 1999 for Palisades Nuclear Plant ML18066A6261999-08-26026 August 1999 Forwards Addl New Valve Relief Request as Alternative to Code Requirements That Will Provide Acceptable Level of Quality & Safety.Request Would Allow Use of App II, Check Valve Condition Monitoring Program, of ASME OM Code-1995 ML18066A6231999-08-26026 August 1999 Forwards SE Related to ISI Program Request for Relief ML18066A6091999-08-19019 August 1999 Provides Licensee with Individual Exam Results for Licensee Applicants Who Took June 1999 Initial License Exam.Without Encls ML20211D5661999-08-17017 August 1999 Forwards semi-annual Fitness for Duty Program Performance Rept for 990101-990630,IAW 10CFR26.71(d).Attachments 1 & 2 Summarize Test Results at Palisades Plant,Big Rock Point Plant & Corporate Ofc ML18066A6111999-08-13013 August 1999 Requests Exemption from Certain Requirements of 10CFR50,App R, Fire Protection Program for Nuclear Power Facilities Operating Prior to 790101. Request Concerns Oil Collection Sys Requirements for PCP Motors ML18066A6031999-08-0909 August 1999 Forwards SE Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety Related Movs, for Plant ML18066A5921999-07-30030 July 1999 Forwards Results of Review by Consumers Energy of Two NRC Draft Repts Entitled, Evaluation of Air-Operated Valves at Light-Water Reactors & Study of Air-Operated Valves in Us Nuclear Power Plants ML18066A5881999-07-30030 July 1999 Provides Rev to Instrument Channel Drift Measurement Submitted on 990611,in Response to NRC Comments on Util RAI Response for Sections 3.3,3.5 & 3.6 & Editorial Changes Revs Necessary for Consistency within ITS ML18066A5971999-07-30030 July 1999 Forwards Markup of Draft NRC SE Re Util Proposal to Convert to Its.Ltr Contains No New Commitments & No Revs to Existing Commitments ML20210G8351999-07-29029 July 1999 Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR ML18066A5801999-07-26026 July 1999 Discusses Evaluation of Relief Requests for ISI Re ASME Section Xi,Subsections IWE & Iwl.Staff Partially Denied Relief Request 1 on Basis That General Visual Exam in Lieu of VT-3 Exam.Relief Requests 4 & 6 Denied as Listed ML17191B4031999-07-23023 July 1999 Informs That NRC Plans to Administer GFE Section of Written Operator Licensing Exam on 991006.Ltr Should Be Submitted to Appropriate Regional Administrator at Listed Address to Register Personnel to Take GFE ML18066A5651999-07-19019 July 1999 Forwards Corrections to Previously Submitted TS Section 3.7, Plant Systems, Converting to Its,Per NUREG-1432.Licensee Realized That Certain Provisions of CTS Had Been Inappropriately Replaced with Provisions from STS ML18066A5481999-07-13013 July 1999 Forwards Draft SE Re Proposed Conversion to Its.Se Based on Review of Consumers Energy Co 980126 Application & as Supplemented by 980430,0914,1012,1109,990301,22,30,0407, 0503,0604,11 & 17 Ltrs ML18066A5381999-07-0808 July 1999 Forwards Insp Rept 50-255/99-08 on 990522-0630.No Violations Noted.Determined That Emergent Repairs to EDG Were Completed in Timely & Skillful Manner to Prevent Challenge to Plant Operation ML18066A5361999-07-0606 July 1999 Discusses 990629 Meeting with PRA Staff Re Initiatives in Risk Area & to Be Establish Dialog Between SRAs & PSAs Staff ML18066A5111999-06-29029 June 1999 Provides Voluntary Confirmation of Facility Readiness as Outlined in GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Npps. Disclosure & Response Encl ML20209B2081999-06-29029 June 1999 Discusses Closure of Response to RAI Re GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Rvid,Version 2 Issued as Result of Review of Responses.Info Should Be Reviewed & Comments Submitted by 990901 ML20210G8791999-06-23023 June 1999 FOIA Request for All Document Communications Between NRC & Region III Involving R Landsman,B Jorgensen & R Caniano & NRC Staff Under Their Supervision & All Communications in Their Possession to & from Consumers Power Re Plant ML18066A5061999-06-17017 June 1999 Forwards Responses to NRC Questions for ITS LCOs 3.6.3 & 3.6.6 of 990126 Submittal.One Editorial Change in Addition to Those Made in Response to NRC Comments & Conforming Changes Made to Associated Bases,Encl ML18066A4991999-06-11011 June 1999 Forwards Responses to NRC Comments Re ITS Section 3.3 & Associated Revs to ITS Sections 1.0,3.3,3.4 & 3.9 of 990126 ITS Conversion Submittal.One Technical Change & Several Editorial Changes Unrelated to NRC Comments,Also Provided ML18066A4921999-06-0909 June 1999 Discusses Response of 980226 Violation Re Insp Rept 50-255/97-18 Re Failure to Take Adequate Corrective Action. Ltr Contains New Commitments & No Rev ML18068A6011999-06-0808 June 1999 Forwards Description of Recent Changes Made to Palisades Site Emergency Plan,Excluding Minor & Editorial Changes Not Requiring Further Explanation ML18066A4851999-06-0404 June 1999 Forwards Insp Rept 50-255/99-04 on 990410-0521.No Violations Noted.Radiation Dose Received During Outage Was Significantly Less than Projected Because of Radiological Personnel Efforts to Create Heightened Awareness ML18066A4881999-06-0404 June 1999 Provides Responses to NRC Questions & Associated Editorial Revs for ITS LCOs 3.6.1,3.6.2,3.6.4,3.6.5 & 3.6.7 of 980126 Submittal.Responses to Comments on Remaining Section 3.6 LCOs Will Be Submitted Separately ML18066A4811999-06-0303 June 1999 Forwards Insp Rept 50-255/99-06 on 990506-12.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML18066A4731999-05-24024 May 1999 Informs That Region III Received Fema,Region V Ltr Transmitting FEMA Final Exercise Rept for 981201 Plume Exposure Pathway Exercise.No Deficiencies Identified, However,Seven Areas Requiring Corrective Actions Identified ML18066A4801999-05-24024 May 1999 Forwards Copy of Rev to NPDES Permit Number MI0001457 Renewal Application as Submitted to Mi Dept of Environ Quality on 990513 ML18066A4681999-05-19019 May 1999 Forwards Insp Rept 50-255/99-05 on 990503-06.Determined That Violation Occurred & Being Treated as Non-Cited Violation. Insp Focused on Whether Activities Associated with GL 96-05 Were Sufficient to Ensure Continued Capability of MOVs ML18066A4721999-05-18018 May 1999 Informs That During Period from 981101-990430,there Were No NPDES Permit Violations & No Repts of Oil,Salt or Polluting Matl Losses Were Made to Govt Agencies ML18066A4651999-05-17017 May 1999 Forwards ISI Program Relief Request 14 for NRC Approval in Accordance with 10CFR50.55(a)(3) as Requirement for Which Proposed Alternative Provide Acceptable Level of Quality & Safety.Rev 0 to SIR-99-032 Rept Also Encl 1999-09-08 Category:NRC TO UTILITY MONTHYEARML18057A5711990-11-15015 November 1990
[Table view]Advises That 900928 Response to Generic Ltr 90-03 Re Vendor Interface for safety-related Components Acceptable ML18057A5821990-11-15015 November 1990 Confirms 901129 Meeting in Glen Ellyn,Il to Discuss Util Engineering self-assessment,SIRW Tank Repair,Steam Generator Replacement,Nrc Bulletin 79-14 Follow Up & Details of Startup Test Program ML18057A5841990-11-14014 November 1990 Requests That Proprietary ANF-90-079(P), Mechanical Licensing Rept for Palisades High Thermal Performance Fuel Assemblies ANF-90-079(P), Be Withheld Per 10CFR2.790 ML18057A5851990-11-13013 November 1990 Summarizes Status of GSIs Which Remain Unimplemented at Palisades,Per Generic Ltr 90-04 ML18057A5761990-11-0909 November 1990 Forwards Safety Insp Rept 50-255/90-28 on 901015-29. Violations Noted ML18057A5721990-11-0909 November 1990 Forwards Safety Insp Rept 50-255/90-30 on 901016-17.No Violations Noted.Enforcement Conference Set for 901115 ML18057A5661990-11-0808 November 1990 Confirms 901115 Enforcement Conference in Region III Ofc to Discuss Falsification of Chemistry QA Sample Results, Training Records Falsification & High Radiation Area Violation ML18057A5631990-11-0707 November 1990 Forwards Fitness-For-Duty Insp Rept 50-255/90-29 on 901016-19.No Violations Noted.Significant Elements of 10CFR26 Not Adequately Implemented,Per Reactive Insp of QA Audit Rept QA-90-02 ML20058G8921990-11-0707 November 1990 Forwards Insp Repts 50-155/90-20 & 50-255/90-20 on 900925-28 & 1015-19.Violations Noted ML18057A5491990-10-29029 October 1990 Forwards Safety Evaluation Re Closeout of IE Bulletin 79-15, Deep Draft Pump Deficiencies ML18057A5441990-10-25025 October 1990 Forwards Insp Rept 50-255/90-24 on 901001-05.No Violations Noted ML18057A5411990-10-24024 October 1990 Forwards Safety Insp Rept 50-255/90-21 on 900828-1010.No Violations Noted ML18057A5241990-10-0505 October 1990 Grants 890628 Request for Relief from Actions 4 & 5 of NRC Bulletin 88-010 Re Nonconforming Circuit Breakers. Nontraceable Breaker Will Be Disposed of ML18057A5201990-10-0505 October 1990 Forwards Safety Insp Rept 50-255/90-19 on 900813-17,0910-14 & 0919 & Notice of Violation ML18057A5141990-10-0303 October 1990 Forwards Safety Insp Rept 50-255/90-22 on 900904-07 & 10.No Violations Noted.Concern Raised Re Lack of Mgt Oversight ML18057A5171990-10-0303 October 1990 Disagrees W/Util Position in 900320 Response to Generic Ltr 89-19 That Design & Safety Assessment Using Independent Plant Exam Deemed Appropriate to Continue Evaluation of Impacts of Steam Generator Overfill.Response Requested ML18057A5131990-10-0101 October 1990 Confirms 901004 Meeting at Facility to Discuss Assessment of Recent NRC ALARA Team Insp Findings,Including Corrective Actions & Findings from ALARA self-assessment ML18057A5011990-09-24024 September 1990 Forwards Safety Insp Rept 50-255/90-23 on 900830-0919.No Violations Noted ML18057A4591990-09-14014 September 1990 Forwards Exam Rept 50-255/OL-90-02 Administered During Wk of 900806.Requests Response within 60 Days Re Concern About Quality of Ref Matl Sent to NRC & Contract Examiners for Exam Development Purposes ML18057A4711990-09-14014 September 1990 Forwards Safety Insp Rept 50-255/90-18 on 900717-0827 & Notice of Violation ML18057A4481990-09-0505 September 1990 Ack Efforts of P Loomis,D Fugere,A Zillins & B Hamm in Implementation of Emergency Response Data Sys at Facility ML20059G5461990-09-0404 September 1990 Discusses 900816 Site Visit Re Const Activities Requiring Security Force Compensatory Measures & Security Plan ML18057A4431990-08-31031 August 1990 Forwards Safety Insp Rept 50-255/90-17 on 900730-0803. Deficiencies Noted in 10CFR50.59 Evaluation ML18057A3831990-08-14014 August 1990 Confirms 900828 Meeting W/Util at Plant to Discuss Bechtel & Westinghouse Participation in Facility Steam Generator Replacement Project,Engineering self-assessment,diesel Generators as ECCS Equipment & Operational Initiatives ML18057A3711990-08-0909 August 1990 Requests Response to Allegation RIII-90-A-0062 Re Complaint from Former Employee on Dismissal Due to Expressing Safety Concerns.Due to Possible Violation,Listed Info Requested, Including Basis for Employment Action ML18057A3771990-08-0909 August 1990 Forwards Safety Insp Rept 50-255/90-15 on 900601-0716.No Violations Noted ML18057A3671990-08-0909 August 1990 Forwards Safety Insp Rept 50-255/90-03 on 900122-0720.No Violations Noted ML18057A3701990-08-0909 August 1990 Ack Receipt of Addressing Isolation Zone & Closed Circuit Television Coverage of Plant Security Bldg.Util Next Rev to Security Plan Should Address Isolation Zone & Closed Circuit Television Configuration for Security Bldg ML20058M6141990-08-0707 August 1990 Forwards Sample Registration Ltr for 901010 Generic Fundamentals Section of Written Operator Licensing Exam. Registration Ltr Listing Names of Candidates Taking Exam Should Be Submitted to Region 30 Days Prior to Exam Date ML20056A4981990-08-0101 August 1990 Forwards Master Bwr/Pwr Generic Fundamentals Exam Section W/Answer Key.W/O Encls ML18057A3501990-07-25025 July 1990 Forwards Request for Addl Info Re Proposed Transfer of Ownership of Facility to Palisades Generating Co.Response to Questions Re Stockholder Financial Liability & Equity Responsibility Should Be Submitted by 900820 ML18057A3541990-07-25025 July 1990 Confirms 900717 Telcon W/S Cooper Requesting Response to Request for Addl Info by 900901,per Util 871112 & s Requesting Authorization Under Provisions of 10CFR20.302 to Dispose of Contaminated Soil in Place ML20055J4351990-07-23023 July 1990 Ack Receipt of 900702 Transmittal of Rev 26 to Physical Security Plan.Estimated Start & Completion Dates for Each Mod Project & Compensatory Measures Requested within 30 Days After Receipt of Ltr ML18057A3451990-07-17017 July 1990 Approves Programmed Enhancements for Generic Ltr 88-17, Loss of Dhr ML18057A3391990-07-12012 July 1990 Forwards Ofc of Investigations Synopsis for Case 4-88-028 Re Procurement & Receipt of Commercial Grade Replacement Parts & Followup to 881021 Part 21 Rept ML18057A3331990-07-12012 July 1990 Confirms Arrangements for 900718 Meeting in Glen Ellyn,Il Re Steam Generator Replacement Project & ALARA Program ML18057A3441990-07-11011 July 1990 Advises That 900514 Rev MRN-EP-90-003 to Section 1 to Plant Site Emergency Plan,Consistent w/10CFR50.54(q) & Acceptable. Changes Do Not Decrease Effectiveness of Emergency Plan ML20055F2271990-07-0606 July 1990 Forwards Physical Security Insp Rept 50-255/90-16 on 900618- 22 & 25.No Violations Identified IR 05000255/19900141990-06-14014 June 1990 Forwards Safety Insp Rept 50-255/90-14 on 900420-0531.No Violations Noted ML20059M9181990-06-13013 June 1990 Forwards NRC Performance Indicators for First Quarter 1990. W/O Encl ML18057A2721990-06-12012 June 1990 Forwards Safety Insp Rept 50-255/90-11 on 900521-25.No Violations Noted ML18057A2651990-06-0808 June 1990 Forwards Safety Insp 50-255/90-10 on 900313-15,0402-06 & 0509.No Violations Noted.Based on Audit Results Necessity for Significant Improvements in Design Basis Documentation Process Identified ML20043A7291990-05-17017 May 1990 Advises That 900410 Rev 6 to Section 7 of Site Emergency Plan Consistent W/Provisions of 10CFR50.54(q) & Acceptable ML18057A2291990-05-15015 May 1990 Recommends Implementation of EPIP Changes After Successful Completion of Emergency Response Data Sys Tests.Planned Implementation Date Is 900601 as Indicated ML18057A2281990-05-14014 May 1990 Discusses Low Upper Shelf Energy Matl in Reactor Vessel Beltlines.Nrc Intends to Issue Guidance Re Credibility of J-R Curves Representative of Vessel Matl Toughness & Will Define What Conservative Bound to J Delta Data Means ML18054B5931990-05-10010 May 1990 Informs That Util Response to NRC Bulletin 89-003, Potential Loss of Required Shutdown Margin During Refueling Operations, Satisfactory ML18054B5961990-05-0909 May 1990 Forwards Safety Insp Rept 50-255/90-12 on 900309-0419 & Notice of Violations.No Response to Violation 1 Required ML20042G1171990-05-0909 May 1990 Ack Receipt of & 900322 Wire Transfer of $75,000 in Payment of Civil Penalties Proposed in NRC ML18054B5831990-05-0202 May 1990 Advises That 891220 Response to Generic Ltr 89-10 Re motor-operated Valve Testing & Surveillance Considered Complete.Review & Verification of Program Implementation Will Be Addressed by Regional Insp Process ML18054B5751990-04-27027 April 1990 Confirms 900503 Meeting at Plant in Covert,Mi to Plan Region III Licensee Info Conference Scheduled for Late June 1990-09-05 Category:OUTGOING CORRESPONDENCE MONTHYEARML18066A6841999-10-13013 October 1999
[Table view]Forwards Insp Rept 50-255/99-10 on 990812-0921.One Violation Noted Re Adherence to Radiological Protection Procedure Requirements.Violation Being Treated as Ncv,Consistent with App C of Enforcement Policy ML18066A6781999-10-0707 October 1999 Summarizes 991005 Meeting at Region III to Discuss Radiation Protection Program at Palisades.Topics Discussed Included Management Changes in Radiation Protection Program & Actions Taken to Correct Deficiencies Identified During 1998 Outage ML18066A6651999-10-0505 October 1999 Informs of Completion of Review of Palisades Plant 25-year Tendon Surveillance Rept & Associated post-surveillance Regression Analysis Submitted by Ltrs Dtd 971218,980223 & 980925.Forwards SE Supporting Performance of Surveillance ML18066A6721999-10-0404 October 1999 Forwards Operator Licensing Exam Rept 50-255/99-301(OL) for Initial Operator Licensing Exams at Palisades NPP Completed on 990614.Two RO Applicants & Two SRO Applicants Failed One or More Portions of Respective Exams & Were Denied Licenses ML18066A6691999-09-30030 September 1999 Advises of Plans for Future Insp Activities at Facility for Opportunity to Prepare for Insps & to Provide Feedback on Any Planned Insps Which May Conflict with Plant Activities ML18066A6561999-09-28028 September 1999 Discusses Closeout of GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps. Understands That Util Will Address Concerns Raised by Insp Team at Future Date ML18066A6531999-09-23023 September 1999 Forwards Insp Rept 50-255/99-14 on 990831-0901.No Violations Noted.Insp Results Indicated with Crsd on-line (Non Outage) Planning & Scheduling Program Provided Effective Coordination & Established Appropriate Radiological Control ML18066A6441999-09-15015 September 1999 Informs That as Result of 980908 Response to RAI Re GL 92-01,Rev 1,Suppl,staff Revised Info in Rvid & Released Info as Rvid Version 2 ML18066A6431999-09-0808 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Operator License Applicants During Wk of 000522,in Response to Nl Haskell ML18066A6381999-09-0808 September 1999 Forwards Request for Addl Info Re ISI Program Relief Request 14 for Palisades Plant ML18066A6391999-09-0303 September 1999 Forwards Insp Rept 50-255/99-09 on 990522-0811.No Violations or Deviations Noted ML18066A6231999-08-26026 August 1999 Forwards SE Related to ISI Program Request for Relief ML18066A6091999-08-19019 August 1999 Provides Licensee with Individual Exam Results for Licensee Applicants Who Took June 1999 Initial License Exam.Without Encls ML18066A6031999-08-0909 August 1999 Forwards SE Accepting Licensee Response to GL 96-05, Periodic Verification of Design-Basis Capability of Safety Related Movs, for Plant ML20210G8351999-07-29029 July 1999 Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR ML18066A5801999-07-26026 July 1999 Discusses Evaluation of Relief Requests for ISI Re ASME Section Xi,Subsections IWE & Iwl.Staff Partially Denied Relief Request 1 on Basis That General Visual Exam in Lieu of VT-3 Exam.Relief Requests 4 & 6 Denied as Listed ML17191B4031999-07-23023 July 1999 Informs That NRC Plans to Administer GFE Section of Written Operator Licensing Exam on 991006.Ltr Should Be Submitted to Appropriate Regional Administrator at Listed Address to Register Personnel to Take GFE ML18066A5481999-07-13013 July 1999 Forwards Draft SE Re Proposed Conversion to Its.Se Based on Review of Consumers Energy Co 980126 Application & as Supplemented by 980430,0914,1012,1109,990301,22,30,0407, 0503,0604,11 & 17 Ltrs ML18066A5381999-07-0808 July 1999 Forwards Insp Rept 50-255/99-08 on 990522-0630.No Violations Noted.Determined That Emergent Repairs to EDG Were Completed in Timely & Skillful Manner to Prevent Challenge to Plant Operation ML18066A5361999-07-0606 July 1999 Discusses 990629 Meeting with PRA Staff Re Initiatives in Risk Area & to Be Establish Dialog Between SRAs & PSAs Staff ML20209B2081999-06-29029 June 1999 Discusses Closure of Response to RAI Re GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity. Rvid,Version 2 Issued as Result of Review of Responses.Info Should Be Reviewed & Comments Submitted by 990901 ML18066A4851999-06-0404 June 1999 Forwards Insp Rept 50-255/99-04 on 990410-0521.No Violations Noted.Radiation Dose Received During Outage Was Significantly Less than Projected Because of Radiological Personnel Efforts to Create Heightened Awareness ML18066A4811999-06-0303 June 1999 Forwards Insp Rept 50-255/99-06 on 990506-12.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML18066A4731999-05-24024 May 1999 Informs That Region III Received Fema,Region V Ltr Transmitting FEMA Final Exercise Rept for 981201 Plume Exposure Pathway Exercise.No Deficiencies Identified, However,Seven Areas Requiring Corrective Actions Identified ML18066A4681999-05-19019 May 1999 Forwards Insp Rept 50-255/99-05 on 990503-06.Determined That Violation Occurred & Being Treated as Non-Cited Violation. Insp Focused on Whether Activities Associated with GL 96-05 Were Sufficient to Ensure Continued Capability of MOVs ML18068A5951999-05-13013 May 1999 Informs That NRC Ofc of NRR Reorganized,Effective 990328. Forwards Organization Chart ML18068A5771999-04-23023 April 1999 Forwards Insp Rept 50-255/99-03 on 990226-0409.No Violations Noted.However,Weaknesses in Cold Weather Preparations Identified by Inspectors ML18066A4591999-04-21021 April 1999 Informs That,Based on Determinations That Changes in Rev 15 Do Not Decrease Effectiveness of Plant EP & That Plan Continues to Meet Stds of 10CFR50.47(b) & Requirements of App E to Part 50,NRC Approval Not Required ML18066A4491999-04-0808 April 1999 Informs That Meeting to Discuss Results of Plant Performance Review Process Scheduled for 990428 ML18066A4511999-04-0707 April 1999 Discusses 990401 Telcon Re Palisades Improved TSs Review Schedule.Encl Table Provides Agreed Upon Milestone Dates for Completion of Review & Reflects Proposed Amend Request Date of 990830 ML18066A4461999-03-26026 March 1999 Advises of Planned Insp Effort Resulting from Palisades PPR Review,Which Was Completed on 990203.Overall Performance at Palisades Was Acceptable IR 05000255/19980221999-03-22022 March 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-255/98-22 Issued on 990210.Corrective Actions Will Be Examined During Future Insps ML18068A5431999-03-17017 March 1999 Forwards RAI Re Licensee 980126 Request to Convert Palisades Nuclear Plant Current TSs to Improved Tss.Response Requested by 990430 ML18068A5381999-03-0505 March 1999 Forwards Insp Rept 50-255/99-01 on 990112-0225.No Violations Noted ML18066A4071999-02-10010 February 1999 Forwards Insp Rept 50-255/98-22 on 981126-990112 & Nov. Violation Identified Re Failure to Submit Engineering Analysis Pertaining to Degraded Studs on Primary Coolant Pump ML18066A4111999-02-10010 February 1999 Ack Receipt of ,Which Transmitted Changes Identified as Rev 42 to Plant Security Plan Submitted Under Provisions of 10CFR50.54(p).No NRC Approval Required IAW 10CFR50.54 ML20203F2541999-02-10010 February 1999 Informs That Beginning 990216,DE Hills Will Be Chief of Operations Branch Which Includes Operator Licensing Function ML18066A4061999-02-10010 February 1999 Informs That Requested Response Was Provided by Licensee on 980707 & That According to Nudocs,Document Should Be Available in Pdr.Informs That Staff Issued Evaluation of Licensee Response to USI A-46 by Ltr ML18068A5221999-02-10010 February 1999 Confirms 990208 Telcon Between R Bailey & R Frigo Re Arrangements Made for Administration of Licensing Exams at Palisades Facility Weeks of 990607 & 0614.NRC Will Make Exam Validation Visit to Facility Week of 990524 ML18066A3991999-02-0505 February 1999 Forwards Insp Rept 50-255/99-02 on 990119-22 & Notice of Violation.Violation Involved Failure to Mark Two Security Procedures That Contained Protected Info (Safeguards Info) & to Properly Store Some Copies of One of Those Procedures ML17191B2221999-02-0202 February 1999 Informs That NRC Plans to Administer Gfes of Operator Licensng Exam on 990407.Authorized Facility Representative Must Submit Ltr to Appropriate Regional Administrator Identifying Individuals Taking Exam ML18066A3841999-01-29029 January 1999 Forwards Request for Addl Info Re TS Change Request to Convert to Improved TS for Plant.Mutually Agreeable Completion Date of 990331 Established ML18066A3851999-01-28028 January 1999 Forwards SE Accepting Licensee 981220 Request for Staff to Authorize Consumers Energy Proposed Alternative to Requirements of ASME Section XI Article IWA-5250 for Degraded P-50A Primary Coolant Pump Casing Bolts at Plant ML18066A3711999-01-12012 January 1999 Refers to Consumers Energy 981215 Response to 980731 RAI Re Proposed Fluence Calculation Methodology.Confirms Understanding That Based on Discussions at 981207 Meeting, Licensee Does Not Expect Further Review of Methodology ML18066A3601998-12-29029 December 1998 Forwards Emergency Preparedness Exercise Insp Rept 50-255/98-21 on 981130-1204.No Violations Noted.Objective of Insp to Determine Whether Palisades Emergency Plan Adequate ML18066A3571998-12-28028 December 1998 Forwards SE Authorizing Licensee 980313 Request to Use ASME OMa-1996,Subsection Istd, Preservice & Inservice Exam & Testing of Dynamic Restraints in Light Water Reactors, as Alternative to Requirements of ASME OMa-1988 Part 4 ML18066A3501998-12-15015 December 1998 Informs That as Part of PRA Implementation Plan, Commission Assigned Two SRAs to Each Regional Ofc.Sras Will Routinely Assess Licensee Event Repts,Plant Events,Insp Findings & EAs from Risk Perspective ML18066A3471998-12-14014 December 1998 Forwards Insp Rept 50-255/98-19 on 981008-1125.No Violations Noted.Noted That Weakness in Equipment Status Control Contributed to Incident That Inadvertently Drained Hydrazine Addition Tank to Turbine Building Sump ML18066A3431998-12-0404 December 1998 Forwards Request for Addl Info Re TSs Change Request to Convert to Improved TSs for Palisades Plant.Addl Info Needed in Sections 2.0,3.1 & 3.2.Response Requested 60 Days from Date Ltr Was Established ML18066A3461998-12-0202 December 1998 Advises of Planned Insp Effort for Next 6 Months at Plant. Info Provided to Minimize Resource Impact on Staff & to Allow for Scheduling Conflicts & Personnel Availability to Be Resolved in Advance of Inspector Arrival Onsite 1999-09-08 |
See also: IR 05000255/1986006
Text
.
.
__
.
.
FEB 261986
Docket No. 50-255
Consumers Power Company
ATTN: Mr. F. W. Buckman
Vice President
Nuclear Operations
212 West Michigan Avenue
Jackson, MI 49201
Gentlemen:
This refers to the roetine safety inspection conducted by Mr. D. L. Williams
of this office on Janua.v 27, through February 7, 1986, of activities at
Palisades Nuclear Generat:ng Plant authorized by NRC Operating License
No. DPR-20 and to the discussion of our findings'with Mr. R. Feneck at the.
conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined during
,
the inspection. Within these areas, the inspection consisted of a selective
l
examination of procedures and representative records, observations, and
interviews with personnel.
i
During this inspection, certain of your activities appeared to be in violation
.
'
of NRC requirements, as specified in the enclosed Notice. A written response
is required.
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC Public Document Room.
The responses directed by this letter and the accompanying Notice are not
'
subject to the clearance procedures of the Office of Management and Budget
as required by the Paperwork Reduction Act of 1980, PL 96-511.
8603040537 860226
DR
ADOCK O
y5
\\
\\
//o/
.
-
-
- -
-
-
.
-
.
.
.
.
-
-
-
(
_
,
-
_
-
-__
,
.
a
Consumers Power Company
2
FEB 261986
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
I E '. Z1 I7'C,~ J, , u;
c
J. J. Harrison, Chief
Engineering Branch
,
Enclosures:
1.
2.
Inspection Report
No. 50-255/86006(DRS)
cc w/ enclosures:
Mr. Kenneth W. Berry, Director
Nuclear Licensing
J. F. Firlit, General Manager
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
Ronald Callen, Michigan
Public Service Commission
Nuclear Facilities and
Environmental Monitoring
,
Section
,
RIII
RIII
RIII
RIII
R II
yfY
(S W{
Wh
. W
Williams /jlk
Ring
gon
Pp fello
uerman
.Ha
.
L
.
.
--m
.
.
.
.
.m