Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-267/85-31
ML20141N205
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 02/24/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Lee O
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20141N206 List:
References
NUDOCS 8603040479
Download: ML20141N205 (2)


See also: IR 05000267/1985031

Text

. e

FEB 2 41986

In Reply Refer To:

Docket: 50-267/85-31

Public Service Company of Colorado

ATTN: 0. R. Lee, Vice President

Electric Production

P. O. Box 840

Denver, Colorado 80201-0840

Gentlemen:

Thank you for your letter (serial P-86046) of January 17, 1986, in response t1

our letter and the attached Notice of Violation dated December 18, 1985. As a

result of our review, we find that additional information, as discussed with

your Mr. Fuller and Mr. Evans (and other members of your staff at an exit

interview on February 13,1986) is needed. Specifically, your revised Procedure

50P S2-04, Section 2.2, "Startup Check List for Automatic Operation," instructs

the operators to confirm the availability of service water, to check the lube

oil level, and to verify that the engine water jacket heaters are operating.

Your corrective action still does not delineate which valves, plugs or similar

components to check in verifying correct system lineup. Consequently, it also

does not provide a means for the operator to document that all applicable

components were checked as correctly aligned. The procedure still relies on

the operator's familiarity with the system. In addition, the corrective action

does not address independent verification. Please provide the supplemental

information within 30 days of the date of this letter.

Sincerely,

Origina! Cianad D/

J. E. Gag! ardo

J. E. Gagliardo, Chief

Reactor Projects Branch

cc:

J. W. Gahm, Manager, Nuclear

Production Division

Fort St. Vrain Nuclear Staticn

16805 WCR 191

Platteville, Colorado 80651

l

L. Singleton, Manager, Quality

Assurance Division

(same address)

Colorado Radiation Control Program Director

I

RPB/ I RPB

RIV:RP8/ Ash ~

MESkow/lk FI JPJau' don JEGagl do

1/I4/86 k/y)' /86 >/n/f

g3040479060224

0 ADocK 05000267 J

PDR { f I

,

'

-

-

-

,

, ,

Public Service Company of Colorado -2-

bcc distrib. by RIV:

RPB DRSP

Resident Inspector R. D. Martin, RA

SectionChief(RPB/A) RSB

SectionChief_(RSB/ES) R&SP8

RSTS. 0perator RIV File

,,

a