ML20141M875

From kanterella
Jump to navigation Jump to search
Forwards Amend 72 to License DPR-61 & Safety Evaluation. Amend Revises Tech Spec 1.8 Re Containment Integrity Definition & Incorporates Table 3.11-2 Concerning Nonautomatic Containment Isolation Valve Testing
ML20141M875
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 02/19/1986
From: Frank Akstulewicz
Office of Nuclear Reactor Regulation
To: Opeka J
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20141M876 List:
References
NUDOCS 8602280800
Download: ML20141M875 (2)


Text

.o.

February 19, 1986 Docket No. 50-213 DISTRIBUTION Docket File OELD NRC PDR ELJordan Mr. John F. Opeka, Senior Vice President Local PDR BGrimes Nuclear Engineering and Operations ISAP Reading JPartlow Connecticut Yankee Atomic Power Company NSIC ACRS (10)

Post Office Box 270 RDiggs (w/TACS) JRaval Hartford, Connecticut 06141-0270 FMiraglia TBarnhart(4)

FAkstulewicz LJHarmon

Dear Mr. Opeka:

PAnderson MVirgilio OELD WJones CMiles, OPA

SUBJECT:

TECHNICAL SPECIFICATIONS TO PERMIT TESTING 0F THE POST-ACCIDENT SAMPLING SYSTEM Re: Haddam Neck Plant The Comission has issued the enclosed Amendment No. 72 to Facility Operating License No. DPR-61 for the Haddam Neck Plant. This amendment is in response to your application dated October 31, 1985.

This amendment revises Technical Specification 1.8, Containment Integrity (definition), and incorporates a new Table 3.11-2, Non-automatic Containment Isolation Valves, to allow for surveillance testing of normally closed, non-automatic containment isolation valves that are part of the Post-Accident Sampling System (PASS).

A Notice of Consideration of Issuance of Arrendment to License and Proposed No Significant Hazards Consideration Determination and Opportunity for Hearing related to the requested action was published in the Federal Register on January 15, 1986 (51 FR 1873). No comments or requests for hearing were received.

A copy of our related Safety Evaluation is enclosed. This action will appear in the Comission's biweekly notice publication in the Federal Register.

Sincerely.

Original signed by: F. Akstulewicz 06022000000Q2pgg PDR ADOCK 9 PDR Francis M. Akstulewicz, Jr.

P Integreted Safety Assessment Project Directorate Division of PWR Licensing - B

Enclosures:

1. Arrendment No. 74 to License No. DPR-61
2. Safety Evaluation cc w/ enclosures:

See next paqe A [)\

DPLB:! SAP,'yB DPI ^(P

.5 D-B : IMf' OELD FAkstulewic7 :l t PA L n' CGrimes 4/AJ

(,@01// o /86 01/M/86 03/Ft/86 1/3c/86 L -_ ___________--________--_A

Mr. John F. Opeka Connecticut Yankee Atomic Power Company Haddam Neck Plant cc:

Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry & Howard Radiation Control Unit Counselors at Law Department of Environmental City Place .

Protection Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Superintendent Haddam Neck Plant Richard M. Kacich, Supervisor RDF #1 Operating Nuclear Plant Licensing Post Office Box 127E Northeast Utilities Service Company East Hampton, Connecticut 06424 Post.0ffice Box 270 Hartford, Connecticut 06141-0270 Edward J. Mroczka Vice President, Nuclear Operations Northeast Utilities Service Company Post Office Pox 270 Hartford, Connecticut 06141-0270 Board of Selectmen Town Hall Haddam, Connecticut 06103 State of Connecticut Office of Policy and Management ATTN: Under Secretary Energy Division 80 Washington Street Hartford, Connecticut 06106 Resident Inspector Haddam Neck Nuclear Power Station c/o U.S. NRC East Haddam Post Office East Haddan, Connecticut 06423 Regional Administrator, Pegion !

U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 w __ . .. . .