Forwards Request for Addl Info by 860321 Re SER Confirmatory Issue 44 Concerning Procedures Generation Package,To Continue Review of Identifying Deviations from Westinghouse Emergency Response Guidelines
ML20141M759
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 02/20/1986
From: Youngblood B
Office of Nuclear Reactor Regulation
To: Conway R
GEORGIA POWER CO.
References
NUDOCS 8602280168
Download: ML20141M759 (3)


Text

-

- o Docket Nos: 50-424 FEB 2 o rg and 50-425 Mr. Richard Conway Senior Vice President and Project Director Georgia Power Company Rt. 2, Box 299A Waynesboro, Georgia 30830

Dear Mr. Conway:

Subject:

Request for Additional Information on Confirmatory Issue 44, " Procedures Generation Package" By letter dated September 16, 1985, Georgia Power Company identified significant Vogtle-specific deviations from the Westinghouse Emergency Response Guidelines in order to address confirmatory issue 44 as identified in the SER.

The staff has reviewed your deviations as contained in your September submittal. In order to complete our review, the additional information as discussed in the enclosure must be provided. A response is requested by March 21, 1986, so that this issue can be addressed in the next supple-ment to the Vogtle SER.

If there are any questions on this matter, please contact the Project Manager, Melanie Miller at (301) 492-7357.

Sincerely,

\ \

[ B. J. Youngblood, Director l

PWR Project Direr.torate #4 Division of PWR Licensing-A, NRR L

Enclosure:

As stated DISTRIBUTION:

F';D0cketF1Je ' MDuncan ACRS(10) cc: See next page NRC PDR" ' ~

MMiller OELD L PDR BJYoungblood R/F AGill NSIC EJordan BClayton PRC System BGrimes PWR#4 R/F JPartlow 8602280168 8602204

{DR ADOCK O y4 es<t it A PWR#,4hPWR-A PWR#4:DPWR-A

kab MDuilhan BJYoungblood MK 02 /86 02/30/86 02/ So /86

9

. Mr. R. E. Conway Georgia Power Company Vogtle Electric Generating Plant cc:

Mr. L. T. Gucwa Resident Inspector Chief Nuclear Engineer Nuclear Regulatory Commission Georgia Power Company P. O. Box 572  :

P.O. Box 4545 Waynesboro, Georgia 30830 Atlanta, Georgia 30302 Mr. Ruble A. Thomas Deppish Kirkland, III, Counsel Vice President - Licensing Office of the Consumers' Utility Vogtle Project Council Georgia Power Company / Suite 225 Southern Company Services, Inc. 32 Peachtree Street, N.W.

P.O. Box 2625 Atlanta, Georgia 30303 Birmingham, Alabama 35202 James E. Joiner Mr. Donald O. Foster Troutman, Sanders, Lockerman, Vice President & Project General Manager & Ashmore Georgja Power Company Candler Building Post Office Box 299A, Route 2 127 Peachtree Street, N.E.

Waynesboro, Georgia 30830 Atlanta, Georgia 30303 Douglas C. Teper Mr. J. A. Bailey Georgians Against Nuclea'r Energy Project Licensing Manager 1253 Lenox Circle Southern Company Services, Inc. Atlanta, Georgia 30306 P.O. Box 2625 Birmingham, Alabama 35202 Laurie Fowler, Esq.

218 Flora Avenue, N.W.

Ernest L. Blake, Jr. Atlanta, Georgia 30307 Bruce W. Churchill, Esq.

Shaw, Pittman, Potts and Trowbridge Tim Johnson 1800 M Street, N.W. Executive Director Washington, D. C. 20036 Educational Campaign for a Prosperous Georgia he. G. Bockhold, Jr. 1083 Austin Avenue, N.E.

Vogtle Plant Manager Atlanta, Georgia 30307 Georgia Power Company Route 2, Box 299-A , Billie Pirner Garde Waynesboro, Georgia 30830 Citizens Clinic Director Government Accountability Project Regional Administrator, Region II 303 10th Street U.S. Nuclear Regulatory Commission Augusta, Georgia 30901 101 Marietta Street, N.W., Suite 2900 Atlanta, Georgia 30323 I

j

Enclosure Request for Additional Information Vogtle Electric Generating Plant (VEGP) linits 1 and 2 Docket Nos.: 50-424 and 50-425

~$

1. The justification for Emergency Operating Procedure (EOP) # 19000-1 (Emergency Response Guideline (ERG) # E-0) step 15 stated that your plant design does not inclu'de a phase B containnent isolation signal. Provide a comparison table of all the systems isolated in the high pressure (HP) reference plant phases A and B and the systems isolated on phase A for your plant. Provide justification for each system that is isolated in the refer-ence plant which is not isolated at Vogtle.

. 2. Justify the elimination of sample line radiation and blowdown line radiation from the procedure identifying a ruptured steam generator.

(EOP #19030-1 (ERG #E-3) Step #2).

3. .In EOP # 19251-1 step 12 (reference ERG FR-Z.1 step 7), provide your Tiant-specific means for measurement of hydrogen concentration.
4. Provide plant specific procedures E0P # 19261-1 and 19262-1 (reference ERG # FR-I.1 and I.2). *
5. For E0P steps corresponding to ERG steps which require establishing specific charging flow values, modify your E0Ps to specify the amount of charging flow to be established. The following are examples of such steps.

l Plant Specific Equivalent to W ~

1 E0P#

," Step # ERG # Step #

1

- 19012-1 16 ES - 1.2 s 16

~

19030-1 22 E-3 22 19121-1 15 ECA - 2.1 15

.e

+7 F -

i E

, o *

. _ , - . . . . _- _r r_ , _ . . - _ - _, .-i