TABLE 1.2 L

b OPERATIONAL-CONDITIONS i

MODE' SWITCH AVERAGE REACTOR j

CONDITION POSITION =

COOLANT TEMPERATURE j

1.

POWER OPERATION Run Any temperature-l 2.

5TARTUP Startup/ Hot Standby Any temperature 3.

HOT SHUTDOWN Shutdown #'***

> 200*F'

[

l 4.

COLD SHUTDOWN Shutdown #'##'***

< 200 F 5.

REFUELING

  • Shutdown or Refuel **'#

140 F l-1 If /ke reedor ande swt/ch n pieced in tire -

4H$*s ikr Oe * "'I' Od inle' led' li Aefvel 1 i

shel!.he dPfr%>fLE.

7

.or. dehel h

  1. The reactor mode 7 witch may be placed in :the 'Runipe tartup/ Hot Standb'y position to test the switet interlock functions and related instrumentation-provided that the control ~ rods l-are veriffed to remain fully inserted by a secondlicensedoperatororother' technically ~qualifiedmemberoftheunik.L technicalistaff.9
    1. The reactor mode' switch may be placed in the Refuel position while:a. single-i l

control rod drive is being> removed from the reactor oressure vessel perL Specification 3.9.10.1.

1

  • Fuel = in the reactor vessel 'with th'e vessel head cl'osure bolts'iless than

]

I fully tensioned'or with the head removed.

-]

    • See Special:Testi. Exceptions 3.10.1 and 3.10.3.

5 l

      • The reactor mode switch may beiplaced in-the Refuel. position while a,sirgle controlarod isLbeing recoupled or withdrawn provided that the'one-rod-out-l' interlock is OPERABLE.

i~

9208110033 920805- -

=-

PDR ADOCK 05000354-t P'

PDR' HOPE' CREEK 1-11 1

J

.u.

.---,_...~,-..-...._,...,,n,.-~.