ML20141M281

From kanterella
Jump to navigation Jump to search
Suppl to 920519 License Change Request 92-02 to License NPF-57,allowing Exception to Spec 4.0.4 for SRMs & IRMs When Operational Condition 2 or 3 Entered from Operational Condition 1 Covering Testing of Reactor Mode Switch
ML20141M281
Person / Time
Site: Hope Creek 
Issue date: 08/05/1992
From: Miltenberger S
Public Service Enterprise Group
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20141M282 List:
References
NLR-N92109, NUDOCS 9208110030
Download: ML20141M281 (5)


Text

e Pubhc Service Electric and Gas Company St:ven E. Miltenberger Pubhc Service Electric and Gas Company P.O 30x 238, Hancocks Bridge, NJ 08036 609-339-1100 Vice Prescent and CNef Wctear Q'Ocer AUG O 51992 NLR-N92109 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Gentlemen:

SUPPLEMENT TO LICENSE AMENDMENT APPLICATION EXCEPTIONS TO SPECIFICATION 4.0.4 FOR SRMS AND IRMS FACILITY OPERATING LICENSE NPF-57 HOPE CREEK GENERATING STATION DOCKET NO. 50-354 h

Public Service Electric and Gas-Company (PSE&G) submitted a.

request for amendment of Facility Operating License NPF-57 (LCR 92-02, NLR-N92068)'on May 19, 1992.

The request proposed to allow an exception to Specification 4.0.4~for the SRMs and IRMs when operational condition 2 or 3 is entered from operational condition.1.

Additionally, two administrative changesLwere proposed; one corrected a typographical error.and the other 4

revised Table 1.2,

" Operational Conditions", to permit the reactor mode switch to be placed in the Refuel position while in hot or cold shutdown to test the switch-interlock functions and-related-instrumentation.

Presently,-only the Run and Startup/ Hot Standby switch positions are specified for this purpose.

PSE&G is submitting this supplement to LCR 92-02.in order to 1

clarify the conditions under which the reactor mode switch would be placed in the Refuel position for the specified testing and to add an additional statement to.the proposed marked-up specifications.

Neither the information in this submittal nor the revised marked-up specification in Attachmeat 1 contain anr substantive changes to the original submittal or in any way change the original significant hazards analysis..

I Under the' proposed change, the reactor mode switch would be placed in the Refuel position,'in lieu ot1the Run or Startup/ Hot Standby positions, for testing only when,this configuration would verify the operability of all the same. switch contacts, interlocks,.and instrumentation as when the test is performed with-the. reactor. mode switch in the Run.or Startup/ Hot Standby _

positions.

t 9208110030 920805

't u 'i 4

PDR--ADOCK 05000354 P-PDR i

k,,

T i;

3

Document Control Desk 2

NLR-N92109 As explained in our original LCR 92-02 submittal, it is preferable to perform testing with the reactor mode switch in the i

Refuel position because this position enables the one-red-cut interlock thereby providing an additional margin of safety beyond the administrative controls in preventing the occurrence of inadvertent rod withdrawal events.

PSE&G is herebr proposing i

that an additional statement be added tx) the_ subject note which requires the_one-rod-out interlock to be operable if testing is performed with the reactor mode switch in the Refuel-position.

The revised marked-up specification is contained in attachment 1 of this submittal.

Should you have any questions or comments on this submittal, please do not hesitate to contact us.

sincerely, I

f a

/

S 4.

Y

4 Document Control Desk 3

AUG O 5 '1992 N LR-N 97.109 Affidavit Attachment C

Mr. T.

T. Martin, Administrator - Region I U.

S.

Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Mr. J.

Stone, Licensing Project. Manager (Acting)

U. S. Nuclear _ Regulatory Commission One White Flint North 11555 Rockville Pike Rockville,LMD 20832 Ms. A.

Feller U.-S.

Nuclear Regulatory Commission One. White Flint North 11555 Rockville Pike Rockville, MD 20852 Mr. T.

P.- Johnson _-(SOS)

USNRC Senior Resident Inspector Mr. K. Tosch,_ Chief NJ Department of Environmental Protection Division of Env.ironmental Quality Burer.u of Nuclear Engineering CN 415 Trenton, NJ 08625 y

w-*

'T

+

't#uF 1

t Ref:

NLR-N92109 1

STATE OF NEW JERSEY

)

)

SS.

COUNTY OF SALEM

)

S. Miltenberger, being' duly sworn according to law deposes and says:

I am Vice President and. Chief Nuclear Officer:of Public Service Electric and Gas Company, and as such, I find the matters set-forth in our letter, NLR-N92109, concerning the Hope Creek Generating Station, are.true to.the best of my knowledge,-

information and belief.

w'd,

N L

7 l

SubscrphedandSworntobeforeme this day of flil/2004C,1992 7

.l Y)f$O L.?-

Y c-Nbtary PubM c of-New Jersey KIMBERLY A. HILL NOTARY PUBUC 0F NEW JERSE7 My Commission Expaes March 9.1997 -

My Commission expires on 1

I

-l f

. &I-y 4

s t

ATTACHMENT 1:-

-SUPPIE. MENT TO. LICENSE AMENDMENT APPLICATION-

- ZXCEPTIONS TO SPECIFICATION 4.0.4 FOR SRMS AND IRMS" FACILITV-GPERATINGJLICENSE.NPF-57 HOPE CREEIU GENERATING' STATION' DOCKET'NO.= 50-354 i1

(

I.

g_ ;

- t -.

N 1

f -

-1 x

x


.----___i._._=.1___,m

_m.