Forwards Addl Documentation Re Use of Forged Fittings,Per Request Contained in 920310 Summary of 911114 Meeting W/Nrc
Date released: 06/03/2020 Download: ML20141M032


Rev 1 to Finalization Program FP-7 - as Built Engineering Walkdown Guideline Phases 1 & 2. W/One Oversize Drawing
ML20141M049
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 10/03/1986
From: Abua E, Fraser D, Holtz A
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To:
References
Download: ML20141M049 (178)
Rev 4 to Vogtle Finalization Program FP-7 Final Design Verification for Safety-Related Piping Sys,Incorporating Configuration Control Methods Established for Unit 2 As- Built Reconcilation Program
ML20141M042
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 10/07/1987
From: Ayoob A, Maryak M
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To:
References
Download: ML20141M042 (11)
Change Notice CN (App 2)-17-1 to Rev 2 to App 2 Engineering Field Procedures,Section 17, Final Design Verification for Safety-Related Piping Sys of Project Ref Manual
ML20141M033
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 12/08/1987
From:
GEORGIA POWER CO.
To:
References
Download: ML20141M033 (12)
Forwards Addl Documentation Re Use of Forged Fittings,Per Request Contained in 920310 Summary of 911114 Meeting W/Nrc
ML20141M030
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 03/26/1992
From: Mccoy C
GEORGIA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20141M030 (2)