Letter Sequence Other |
|---|
|
Results
Other: 3F0194-02, Clarifies Licensees Position on Use of Floor Response Spectra at Unit 3 for Resolution of USI A-46, 3F0398-16, Forwards Response to 980202 RAI Re Summary Rept on Resolution of USI A-46, Seismic Qualification of Equipment in Operating Npps. Confirmatory self-assessment of USI A-46 Resolutions Will Be Submitted,As Committed Previously, 3F0698-17, Submits Results of Evaluation to NRC Re GL 87-02, Verification of Seismic Adequacy of Mechanical of Condenser & Electrical Equipment in Operating Reactors (USI A-46) for Evaluation of Condenser Hotwell Suction Isolation Valve, 3F0993-04, Forwards Response to 5 of 6 RAIs in NRC Re Floor Response Spectra for Resolution of USI A-46.Floor Response Spectra for Upper Two Floors in Reactor Bldg in Process of Development & Will Be Provided by 931015, 3F0999-20, Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46, 3F1298-01, Forwards Response to NRC 980410 RAI Re Audit Rept of USI A-46,seismic Implementation & Subsequent Evaluations of Related Issues at Crystal River,Unit 3, ML20134C265, ML20141K807, ML20216F560
|
MONTHYEAR3F0993-04, Forwards Response to 5 of 6 RAIs in NRC Re Floor Response Spectra for Resolution of USI A-46.Floor Response Spectra for Upper Two Floors in Reactor Bldg in Process of Development & Will Be Provided by 9310151993-09-0707 September 1993 Forwards Response to 5 of 6 RAIs in NRC Re Floor Response Spectra for Resolution of USI A-46.Floor Response Spectra for Upper Two Floors in Reactor Bldg in Process of Development & Will Be Provided by 931015 Project stage: Other 3F1093-04, Provides Response to Request for Addl Info Re Floor Spectra for Resolution of USI A-461993-10-0606 October 1993 Provides Response to Request for Addl Info Re Floor Spectra for Resolution of USI A-46 Project stage: Request ML20058P1841993-12-16016 December 1993 Forwards SE Accepting Methods for Developing Floor Response Spectra for Resolution of USI A-46 Project stage: Approval 3F0194-02, Clarifies Licensees Position on Use of Floor Response Spectra at Unit 3 for Resolution of USI A-461994-01-0707 January 1994 Clarifies Licensees Position on Use of Floor Response Spectra at Unit 3 for Resolution of USI A-46 Project stage: Other ML20134C2651997-01-28028 January 1997 Requests Addl Info Re Resolution of Unresolved Safety Issue A-46 for Crystal River Nuclear Generating Plant,Unit 3 Project stage: Other ML20141K8071997-05-27027 May 1997 Summarizes 970516 Telcon Re Status of Resolution of USI A-46 (GL-87-02) Project stage: Other 05000302/LER-1997-041, :on 971110,discovered That Control Complex Chiller May Be Rendered Unavailable Due to Design Error in pre-1997 Mod.Will Implement Mod to Remove Subsequent Es Actuation Load Shedding Prior to Restart of Plant1997-12-10010 December 1997
- on 971110,discovered That Control Complex Chiller May Be Rendered Unavailable Due to Design Error in pre-1997 Mod.Will Implement Mod to Remove Subsequent Es Actuation Load Shedding Prior to Restart of Plant
Project stage: Request 3F1297-24, Provides Supplemental Info to Support Util Response to NRC Request for Addl Info,Dtd 970128.Clarification to Util RAI Responses,Discussed During NRC Audit USI A-46 & Calculations Encl also.W/10 Oversize Drawings1997-12-16016 December 1997 Provides Supplemental Info to Support Util Response to NRC Request for Addl Info,Dtd 970128.Clarification to Util RAI Responses,Discussed During NRC Audit USI A-46 & Calculations Encl also.W/10 Oversize Drawings Project stage: Supplement 3F0198-42, Forwards Rev 8 to Abnormal Procedure (AP) 961, Earthquake, as Supplemental Response for Resolution of USI A-461998-01-30030 January 1998 Forwards Rev 8 to Abnormal Procedure (AP) 961, Earthquake, as Supplemental Response for Resolution of USI A-46 Project stage: Supplement ML20199J3591998-02-0202 February 1998 Forwards Request for Addl Info Re Crystal River 3 Nuclear Plant,Summary Rept on Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors, Project stage: RAI 3F0398-16, Forwards Response to 980202 RAI Re Summary Rept on Resolution of USI A-46, Seismic Qualification of Equipment in Operating Npps. Confirmatory self-assessment of USI A-46 Resolutions Will Be Submitted,As Committed Previously1998-03-30030 March 1998 Forwards Response to 980202 RAI Re Summary Rept on Resolution of USI A-46, Seismic Qualification of Equipment in Operating Npps. Confirmatory self-assessment of USI A-46 Resolutions Will Be Submitted,As Committed Previously Project stage: Other ML20216F5601998-04-10010 April 1998 Discusses Audit Rept of USI A-46 Seismic Implementation Program Results Performed by FPC for Cystal River Nuclear Generating Plant Project stage: Other 3F0698-17, Submits Results of Evaluation to NRC Re GL 87-02, Verification of Seismic Adequacy of Mechanical of Condenser & Electrical Equipment in Operating Reactors (USI A-46) for Evaluation of Condenser Hotwell Suction Isolation Valve1998-06-0101 June 1998 Submits Results of Evaluation to NRC Re GL 87-02, Verification of Seismic Adequacy of Mechanical of Condenser & Electrical Equipment in Operating Reactors (USI A-46) for Evaluation of Condenser Hotwell Suction Isolation Valve Project stage: Other 3F1298-01, Forwards Response to NRC 980410 RAI Re Audit Rept of USI A-46,seismic Implementation & Subsequent Evaluations of Related Issues at Crystal River,Unit 31998-12-31031 December 1998 Forwards Response to NRC 980410 RAI Re Audit Rept of USI A-46,seismic Implementation & Subsequent Evaluations of Related Issues at Crystal River,Unit 3 Project stage: Other 3F0999-20, Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-461999-09-21021 September 1999 Forwards Summary Re Justification to Defer USI A-46 Commitment,Per Work Needed to Resolve GL 87-03, Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Usi A-46 Project stage: Other 1997-05-27
[Table View] |
Text
- 1 UNITED STATES g
]
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. SJ866-0001 k ***
f/
May 27, 1997 Mr. Roy A. Anderson Senior Vice President, Nuclear Operations Florida Power Corporation ATTN: Manager, Nuclear Licensing (SA2A)
Crystal River Energy Complex 15760 W Power Line Street Crystal River, Florida 34428-6708
SUBJECT:
CRYSTAL RIVER NUCLEAR GENERATING PLANT UNIT 3 -
SUMMARY
OF TELEPHONE CONVERSATION RE: RESOLUTION OF UNRESOLVED SAFETY ISSUE A-46 (GENERIC LETTER 87-02) (TAC NO. M69440)
Dear Mr. Anderson:
The purpose of this letter is to document our telephone conversation with your staff on May 16, 1997, relating to the status of resolution of Unresolved Safety Issue (USI) A-46, Generic Letter (GL) 87-02 at Crystal River 3 (CR3).
By letter dated January 28, 1997, the staff transmitted a request for additional information (RAI) in response to your CR3 plant-specific summary report documenting the results of a seismic walkdown performed to address the 4
USI A-46 issue.
By letter dated March 27, 1997, you provided a partial response to the staff's RAI.
Your response addressed 9 out of 25 RAI issues and indicated that the remaining issues would be addressed by July 21, 1997.
s Your seismic walkdown results identified over 100 outlier items.
They involve several potential non-conformances with licensing basis and issues of equipment operability to perform their intended safety functions. Your March 27, 1997 letter indicated that you plan to resolve these outliers by the end of Refuel 12 which is currently scheduled in the year 2000.
The staff expressed concern regarding your schedule for resolving the outliers and restart of the plant with potential non-conformances and unresolved equipment operability issues. The staff also indicated that it is necessary to characterize and resolve the outliers in accordance with their safety significance prior to restart of the plant, and establish adequate justification for continued operation (JCO) for other outliers which would not be resolved prior to restart of the plant.
The staff expressed interest in conducting a site inspection in September 1997.
Your staff agreed to N
,9 ggggER CON Y
290053 9705300122 970527 e
PDR ADOCK 05000302 P
PDR L
zn s
Mr. R. Anderson 2-May 27,1997 characterize the' outliers by July 1997, and prior to plant restart, resolve or establish adequate JC0 for all the outliers. Your staff also committed to J
include this action in your restart list.
l If you have any questions, please write or call me at (301) 415-1471.
l Sincerely, original signed by L.Raghavan L. Raghavan, Project Manager Project Directorate II-3 Division of Reactor Projects - I/II l
Office of Nuclear Reactor Regulation l
Docket No. 50-302 cc: See next page l
Distribution Docket: File.
'PUBLIC Crystal Reading S. Varga J. Zwolinski ACRS OGC J. Johnson, RII l
R. Wessman K. Manoly P.Y. Chen l
l^
l i
DOCUMENT NAME:
G:\\ CRYSTAL \\69440.LTR To receive a copy of this document, indicate in the box:
"C" - Copy without attachment / enclosure "E" - Copy with attachment / enclosure "N" - No co)y 0FFICE PDII 3/PM PDII 3/LA by PDI!*3\\D _}
lC l
NAME L. Raghavan UL BClayton 4W FHebdon N'
~
DATE 05/33/97 05/ s /97
05/37 /97
]
OFFICIAL RECORD COPY i
4 9
i e
1 i
l-f Mr. R. Anderson characterize the outliers by July 1997, and prior to plant restart, resolve or establish adequate JC0 for all the outliers.
Your staff also committed to include this action in your restart list.
1 If you have any questions, please write or call me at (301) 415-1471.
i Sincerely, l
L. Raghavan, Project Manager Project Directorate II-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-302 i
cc: See next page i
I l
i l
i I
(
l 4
4
l.
Mr. Roy A. Anderson CRYSTAL RIVER UNIT NO. 3 Florida Power. Corporation GENERATING PLANT cc:
Mr. R. Alexander Glenn Senior Resident Inspector Corporate Counsel Crystal River Unit 3 Florida Power Corporation U.S. Nuclear Regulatory Commission MAC-A5A 6745 N. Tallahassee Road l
P.O. Box 14042 Crystal River, Florida 34428 i
St. Petersburg, Florida 33733-4042 Mr. John P. Cowan Mr. Bruce J. Hickle, Director Vice President, Nuclear Production Nuclear Plant Operations (NA2C)
(SA2C)
Florida Power Corporation Florida Power Corporation i
Crystal River Energy Complex Crystal River Energy Complex 15760 W. Power Line Street 15760 W. Power Line Street i
l Crystal River, Florida 34428-6708 Crystal River, Florida 34428-6708 Mr. Robert B. Borsum Regional Administrator, Region II B&W Nuclear Technologies U.S. Nuclear Regulatory Commission 1700 Rockville Pike, Suite 525 61 Forsyth Street, SW., Suite 23T85 Rockville, Maryland 20852 Atlanta, GA 30303-3415 Mr. Bill Passetti Mr. Kerry Landis Office of Radiation Control U.S. Nuclear Regulatory Commission Department of Health and 61 Forsyth Street, SW., Suite 23T85 Rehabilitative Services Atlanta, GA 30303-3415 1317 Winewood Blvd.
Tallahassee, Florida 32399-0700 l
Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Mr. Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Chairman Board of County Commissioners l
Citrus County 110 North Apopka Avenue l
Iverness, Florida 34450-4245 Mr. David Kunsemiller, Director Nuclear Operations Site Support (SA2A)
Florida Power Corporation Crystal River Energy Complex 15760 W. Power Line Street Crystal River, Florida 34428-6708 J
1