Text
- 1 UNITED STATES g
]
NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. SJ866-0001 k ***
f/
May 27, 1997 Mr. Roy A. Anderson Senior Vice President, Nuclear Operations Florida Power Corporation ATTN: Manager, Nuclear Licensing (SA2A)
Crystal River Energy Complex 15760 W Power Line Street Crystal River, Florida 34428-6708
SUBJECT:
CRYSTAL RIVER NUCLEAR GENERATING PLANT UNIT 3 -
SUMMARY
OF TELEPHONE CONVERSATION RE: RESOLUTION OF UNRESOLVED SAFETY ISSUE A-46 (GENERIC LETTER 87-02) (TAC NO. M69440)
Dear Mr. Anderson:
The purpose of this letter is to document our telephone conversation with your staff on May 16, 1997, relating to the status of resolution of Unresolved Safety Issue (USI) A-46, Generic Letter (GL) 87-02 at Crystal River 3 (CR3).
By letter dated January 28, 1997, the staff transmitted a request for additional information (RAI) in response to your CR3 plant-specific summary report documenting the results of a seismic walkdown performed to address the 4
USI A-46 issue.
By letter dated March 27, 1997, you provided a partial response to the staff's RAI.
Your response addressed 9 out of 25 RAI issues and indicated that the remaining issues would be addressed by July 21, 1997.
s Your seismic walkdown results identified over 100 outlier items.
They involve several potential non-conformances with licensing basis and issues of equipment operability to perform their intended safety functions. Your March 27, 1997 letter indicated that you plan to resolve these outliers by the end of Refuel 12 which is currently scheduled in the year 2000.
The staff expressed concern regarding your schedule for resolving the outliers and restart of the plant with potential non-conformances and unresolved equipment operability issues. The staff also indicated that it is necessary to characterize and resolve the outliers in accordance with their safety significance prior to restart of the plant, and establish adequate justification for continued operation (JCO) for other outliers which would not be resolved prior to restart of the plant.
The staff expressed interest in conducting a site inspection in September 1997.
Your staff agreed to N
,9 ggggER CON Y
290053 9705300122 970527 e
PDR ADOCK 05000302 P
PDR L
zn s
Mr. R. Anderson 2-May 27,1997 characterize the' outliers by July 1997, and prior to plant restart, resolve or establish adequate JC0 for all the outliers. Your staff also committed to J
include this action in your restart list.
l If you have any questions, please write or call me at (301) 415-1471.
l Sincerely, original signed by L.Raghavan L. Raghavan, Project Manager Project Directorate II-3 Division of Reactor Projects - I/II l
Office of Nuclear Reactor Regulation l
Docket No. 50-302 cc: See next page l
Distribution Docket: File.
'PUBLIC Crystal Reading S. Varga J. Zwolinski ACRS OGC J. Johnson, RII l
R. Wessman K. Manoly P.Y. Chen l
l^
l i
DOCUMENT NAME:
G:\\ CRYSTAL \\69440.LTR To receive a copy of this document, indicate in the box:
"C" - Copy without attachment / enclosure "E" - Copy with attachment / enclosure "N" - No co)y 0FFICE PDII 3/PM PDII 3/LA by PDI!*3\\D _}
lC l
NAME L. Raghavan UL BClayton 4W FHebdon N'
~
DATE 05/33/97 05/ s /97
05/37 /97
]
OFFICIAL RECORD COPY i
4 9
i e
1 i
l-f Mr. R. Anderson characterize the outliers by July 1997, and prior to plant restart, resolve or establish adequate JC0 for all the outliers.
Your staff also committed to include this action in your restart list.
1 If you have any questions, please write or call me at (301) 415-1471.
i Sincerely, l
L. Raghavan, Project Manager Project Directorate II-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-302 i
cc: See next page i
I l
i l
i I
(
l 4
4
l.
Mr. Roy A. Anderson CRYSTAL RIVER UNIT NO. 3 Florida Power. Corporation GENERATING PLANT cc:
Mr. R. Alexander Glenn Senior Resident Inspector Corporate Counsel Crystal River Unit 3 Florida Power Corporation U.S. Nuclear Regulatory Commission MAC-A5A 6745 N. Tallahassee Road l
P.O. Box 14042 Crystal River, Florida 34428 i
St. Petersburg, Florida 33733-4042 Mr. John P. Cowan Mr. Bruce J. Hickle, Director Vice President, Nuclear Production Nuclear Plant Operations (NA2C)
(SA2C)
Florida Power Corporation Florida Power Corporation i
Crystal River Energy Complex Crystal River Energy Complex 15760 W. Power Line Street 15760 W. Power Line Street i
l Crystal River, Florida 34428-6708 Crystal River, Florida 34428-6708 Mr. Robert B. Borsum Regional Administrator, Region II B&W Nuclear Technologies U.S. Nuclear Regulatory Commission 1700 Rockville Pike, Suite 525 61 Forsyth Street, SW., Suite 23T85 Rockville, Maryland 20852 Atlanta, GA 30303-3415 Mr. Bill Passetti Mr. Kerry Landis Office of Radiation Control U.S. Nuclear Regulatory Commission Department of Health and 61 Forsyth Street, SW., Suite 23T85 Rehabilitative Services Atlanta, GA 30303-3415 1317 Winewood Blvd.
Tallahassee, Florida 32399-0700 l
Attorney General Department of Legal Affairs The Capitol Tallahassee, Florida 32304 Mr. Joe Myers, Director Division of Emergency Preparedness Department of Community Affairs 2740 Centerview Drive Tallahassee, Florida 32399-2100 Chairman Board of County Commissioners l
Citrus County 110 North Apopka Avenue l
Iverness, Florida 34450-4245 Mr. David Kunsemiller, Director Nuclear Operations Site Support (SA2A)
Florida Power Corporation Crystal River Energy Complex 15760 W. Power Line Street Crystal River, Florida 34428-6708 J
1