ML20141K302
| ML20141K302 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 01/16/1986 |
| From: | Youngblood B Office of Nuclear Reactor Regulation |
| To: | Tucker H DUKE POWER CO. |
| References | |
| NUDOCS 8601220437 | |
| Download: ML20141K302 (1) | |
Text
-
Docket No.: 50-414 6M Mr. H. B. Tucker, Vice President Nuclear Production Department Duke Power Company 422 South Church Street Charlotte, North Carolina 28242
Dear Mr. Tucker:
I
Subject:
Certification of the Proposed Final Draft Technical Specifications for Catawba Unit 2 Enclosed is one copy of the proposed Final Draft Technical Specificatians for Catawba Nuclear Station, Unit 2.
As you-have requested, these Unit 2 Technical Specifications were combined with Catawba Unit 1 Technical Specifications. You are requested to review them and certify under oath and affirmation, by February 12, 1986, that to the best of your knowledge they accurately reflect the as-built condition of the facility, the Catawba Final Safety Analysis Report (as amended), other related documentation and the Safety Evaluation Report.
In addition, please provide a detailed description of the resources and process used to review and certify these Technical Specifications. Any proposed changes l
to the enclosed Final Draft should be identified in your response.
If you have any questions concerning this issue, please contact the Project Manager, Kahtan Jabbour, at (301) 492-9789.
Sincerely,
/51 1
B. J. Youngblood, Director PWR Project Directorate #4 Division of PWR Licensing-A
Enclosure:
Catawba Units 1 and 2 Technical cc w/o enclosures:
See next page ISTRLBUTION:
SFW'i-NRC PDR r Local PDR' %q PRC System 8601220437 860116 PDR ADOCK O g4 PWR#4 Rdql MDuncan A
KJabbour,
OELD i
ACRS (10)
MWangler j
JPartlow SBrown EJordan VBenaroya BGrimes BClayton al 3
PWR#4/hPWR-A PWR#
'R-A PWR#4/
-A KJabbour/mac WuWhah BJY' blood 01/g/86 01///,/86 01/
/86
a Mr. H. B. Tucker Duke Power Company Catawba Nuclear Station cc:
William L. Porter, Esq.
North Carolina Electric Membership Duke Power Company Corp.
P.O. Box 33189 3333 North Boulevard Charlotte, North Carolina 28242 P.O. Box 27306 Raleigh, North Carolina 27611 J. Michael McGarry, III, Esq.
Bishop, Liberman, Cook, Purcell Saluda River Electric Cooperative, and Reynolds Inc.
1200 Seventeenth Street, N.W.
P.O. Box 929 Washington, D. C.
20036 Laurens, South Carolina 29360 North Carolina MPA-1 Senior Resident Inspector Suite 600 Route 2, Box 179N 3100 Smoketree Ct.
York, South Carolina 29745 P.O. Box 29513 Raleigh, North Carolina 27626-0513 Regional Administrator, Region II j
U.S. Nuclear Regulatory Commission, Mr. C. D. Markham 101 Marietta Street, NW, Suite 2900 Power Systems Division Atlanta, Georgia 30323 Westinghouse Electric Corp.
P.O. Box 355 Pittsburgh, Pennsylvania 15230 Robert Guild, Esq.
2759 Rosewood Drive NUS Corporation Columbia, South Carolina 29205 2536 Countryside Boulevard Clearwater, Florida 33515 Palmetto Alliance 2759 Rosewood Drive Mr. Jesse L. Riley, President Columbia, South Carolina 29205 Carolina Environmental Study Group 854 Henley Place Karen E. Long Charlotte, North Carolina 28208 Assistant Attorney General N.C. Department of Justice Richard P. Wilson, Esq.
P.O. Box 629 Assistant Attorney General Raleigh, North Carolina 27602 S.C. Attorney General's Office P.O. Box 11549 Spence Perry, Esquire Columbia, South Carolina 29211 Associate General Counsel Federal Emergency Management Agency Piedmont Municipal Power Agency Room 840 100 Memorial Drive 500 C Street Greer, South Carolina 29651 Washington, D. C.
20472 Mark S. Calvert, Esq.
Mr. Michael Hirsch Bishop, Liberman, Cook, Federal Emergency Management Agency Purcell & Reynolds Office of the General Counsel 1200 17th Street, N.W.
Room 840 Washington, D. C.
20036 500 C Street, S.W.
Washington, D. C.
20472 Brian P. Cassidy, Regional Counsel Federal Emergency Management Agency, Region I J. W. McCormach P0CH Boston, Massachusetts 02109
_-.