OPERATLNG DATA REPORT DOCKET NO.
50-369 DATE 1/15/86 COMPLETED BY. cr.n. nnavis j
TELEPHONE 7n4-373-7567 OPERAT!NG STATUS
- 1. Unit flame:
McGuire 1 Notes
- Nameplate Rating
- 2. ReportingPeriod: December 1. 1985-December-31. 1985 (Gross MWe) calculated as
- 3. Licensed Thermal Power (MWt):
3411 1450.000 MVA x.90 power 1305*
factor per Page lii,
- 4. Nameplate Rating (Gross MWe):
N G-0020.
1180
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
11R0
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.G!ve Reasons:
None 1
d
- 9. Power Level To Which Restricted,if Any (Net MWe):
None
- 10. Reasons For Restrictions,if Any:
1 This Month Yr to.Date Cumulative t
- 11. Hours In Reparting Period 7aa.o 8 760.0 35 808.0
- 12. Number Of Hours Reactor Was Critical 727.5 6 842.3 25 005.9
- 13. Reactor Reserve Shutdown Hours i.c
- 14. Hours Generator On Line 721.A-A 7Ao n 24 7 Q. 5
- 15. Unit Resene Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 2 425 449 20 562 275 67 366 575
- 17. Gross Electrical Energy Generated (MWH) 847 161 7 082 008 23 311 233
- 18. Net Electrical Energy Generated (MWH) 815 342 6 776 759 22 152 014
- 19. Unit Service Factor 97.3 77.0 69.0
- 20. Unit Availability Factor 97.3 77.0 69.0
- 21. Unit Capacity Factor (Using MDC Net) 92 9 65.6 52.4.
- 22. Unit Capacity Factor (Using DER Net) 92.9 65.6 52.4
- 23. Unit Forced Outage Rate 2.7 9.1 14.3
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date.and Duration of Each):
NONF 4
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units In Test Status iPrior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8601220001 85 y
PDR ADOCK pg l l/
. (of77y R_
l
)
'. AVERAGE DAILY UNIT POWER LEVEL DOCKET-NO. 50-369 UNIT McGuire 1 DATE 1/15/86-COMPLETED BY J.A.
Reavis TELEPHONE 704-373-7567
?
MONTH December, 1985 I
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net);
(MWe-Ne t) i 1:
1 151 17 1 151 i
2 1 151 18
-1 150-3 1 152 19
'I~150-1
{_
4 1 152 20 1 117 4
l 5
1 152 21 1 150 6
1 153 22 844 i
7 1 153
-23 153 8
1 153 24
-818 e
9 1 155 25 1 123-10 1 156-26 1 133
{
11 l'155 27 l'151-J i
12 1 152 28
- 1 146 i
13 1 152 29
-1 150 l
14
-1 151 30 1 148-l
'2 i-15
' 1 152-31 1 148
[
16 1 151 l
INSTRUCTIONS
.On this format, list the average daily ~ unit power -level in MWe-Net fort each day
.in the reporting month. Compute'to the nearest whole megawatt.
l t
~
g
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET N0. 50-369 UNIT NAME McGuire 1 DATE 1/15/86
~
REPORT MONTH December 1985 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 O
gj License y
Cause & Corrective e32 "a
m3E N3.
Date
~.
g 5; 3
Jg g c Event h
h Action to a
bO e
om3 MV EV N S3 E
$65 S Report #
d?O OO Prevent Recurrence A
HH PUMPXX-(IC2) Heater Drain Pump Out of Service 42-p 85-12-05 F
43-p 85-12-20 S
B CC VALVEX Turbine Valve Movement Test 8
85-12-22 F
20.13 A
3 HA CKTBRK Ground on Busline (B), Phase Y, Transformer Side Motor Operated Disconnect 9
85-12-23 F
0.27 A
3 HA CKTBRK Generator Breaker (A) Opened Due to Low Breaker Closing Pressure A
HA CKTBRK Work on Busline (IB) 44-p
.85-12-23 F
45-p 85-12-24 F
B IB INSTRU.
Nuclear Instrumentation Calibration 1
2 3
4 Reason:
Method:
Exhibit G - Instructions S S b led A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets ~for. Licensee C-Refueling 3-Automatic Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161)
E-Operator Training 4 License Examination F-Administrative S
G-Operational Error (Explain)
Exhibit I - Same Source H-Other (Explain)
'9/771
i Docket No.: '5'0-369 Unit: McGuire 1
~ /15/86 1
Date:
Month: December, 1985 McGuire 1 began Decerter at 100% but tripped on December 22nd due to a ground-fault on the "B" Busline. The unit returned to service December 23rd and-J increased power to 100%.
j 1
i G
o e
4 4
4 4.
4 e
w r
... - + -
M.ONT*>'Y RIKE:.INO INFO?f.ATION RECUEST
)
i 1.
Facility na e:
McGuire Unit 1 1
2.
Scheduled next refueling shutdown:
June 1986 3.
Scheduled restart following refueling:
September 1986 4.
Will refueling or resu=ption of operation thereaf ter require a technical specification change or other license a=endment?
YES If yes, what will these be?
Technical Specification Revisiog j
If no, has reload design and core configuration been reviewed by Safety Review Co=:ittee regarding unreviewed safety questions?
N/A 5.
Scheduled date(s) for sub itting proposed licensing action and supporting information:
N/A a
6.
I=portant licensing considerations (new or different design or supplier, unreviewed design or perfor=ance analysis methods, significant changes in design or new operating procedures).
d 5
7.
Nu=ber of fuel assemblies (a) in the core:
193 (b) in the spent fuel pool:.
152 i
8.
Present licensed fuel pool capacity:
1463-Size of requested or planned increase:
9.
Projected date of last' refueling which can be acco=modated by present licensed capacity:
August 2010 m
LtKE PcWER COM?NiY Date:
January 15, 1986 Name of
Contact:
J. A. Reavis Phone:
704-373-7567
OPERATLNG DATA REPORT DOCKET NO.
50-370 DATE 1/15/86 COMPLETED BY J.A. Reavis TELEPHONE 7nd-173-7567 OPERATING STATUS Notes
- Nameplate Rating
- 1. Unit Name:
Mccuire 2 (Gross MWe) calculated as
- 2. Reporting Period: Decamber 1.
19AS-Neamhnr 11. 19Rg 1450.000 MVA x.90 power
- 3. LicensedThermalPower(MWt):
3411 factor per Page 111, 1305*
- 4. Nameplate Rating (Gross MWe):
1180
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
1180
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur L. Capacity Ratings (items Number 3 Through 7) Since Last Report.Give Reasons:
- 9. Power Level To Which Restricted,If Any (Net MWe):
- 10. Reasons For Restrictions,If Any:
This Month Yr..to.Date Cumulative i1. Hours in Reporting Period 744.0 8 760.0 16 104.0
- 12. Number Of Hours Reactor Was Critical 424.0 s aon s 11 6?R.6
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 422.3 5 174.5 11 265.6
- 15. Tidt Resene Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 1 328 243 16 779 706 36 150 377
- 17. Gross Electrical Energy Generated (MWH) 474 526 5 862 844 12 700 567
- 18. Net Electrical Energy Generated (MWH) 451 434 5 595 853 12 153 653
- 19. Unit Service Factor 56.8 59.1 70.0
- 20. Unit Availability Factor 56.8 59.1 70.0
- 21. Unit Capacity Factor (Using MDC Net) 51.4 54.1 64.0
- 22. Unit Capacity Factor (Using DER Net) 51.4 54.1 64.0
- 23. Unit Forced Outage Rate 43.2 28.6 22.4
- 24. Shutdowns Scheduled Over Next 6 MonthsIType.Date and Duration of Each1:
Refueling - April 2, 1986 - 8 weeks
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast -
Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPER ATION (9/77)
AVERAGE DAILY UNIT POWER LEVEL i
s.
DOCKET NO.- 50-370 UNIT McGuire 2 I
DATE 1/15/86 COMPLETED BY J.A.
Reavis TELEPHONE 704-373-7567 MONTH December. 1985 i
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAll.Y POWER LEVEL' (MWe-Net)
(HWe-NCt) 1 1 166 17
~---
i
~1 167 18 2
4 3
1 167 19 4'
4 1 168 20 5
1 267 21 6
1 150 22 7
1 168 23 1
i 8
1 168 24 i
9 1 168 25 395 10 1 169 26 1 150 11 725 27 1 159
~
12 28 1 157 i
f 13 29
-1 158 14 30 513 l_
15.
.31 l'108 i
16 J
INSTRUCTIONS On t;ils format, -list the average daily unit power level in MWe-Net for each day -
l In tim ' reporting month. ' Compute to the _ nearest whole megawatt.
L
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-370 UNIT NAME Mccuir, 2 DATE 1/15/86 REPORT MONTH December 1985 COMPLETED BY J. A. Reavis TELEPHONE 704-373-7567 "sO o en$
License g
Cause & Corrective c32 "c
v5E y
.N3.
Date
%h 8
jy Event h
gm, Action to 5E E
TEb EB 8B Prevent Recurrence H
o~
oc xmo Report #
mo uo B
CC VALVEX Turbine Valve Movement Test 37-p 85-12-06 S
i 21 85-12-11 F
321.67 A
1 CH HTEXCH Steam Generator Tube Leak Outage 38-p 85-12-25 F
H CJ XXXXXX Hold to Make-up to the Refueling Water Storage Tank F
HH XXXXXX Hold for Secondary Chemistry 39-p 85-12-25 F
A CH VALVEX Repair (B) Steam Generator Feedwater 40-p 85-12-30 F
Regulating Valve (CF-23) 41-P 85-12-30 F
F RC FUELXX Axial Flus Difference Limit
.F RC FUELXX Axial Flux Difference Limit 42-P 85-12-31 F
T A
i 1
2 3
4-Reason:
Method:
Exhibit G - Instructions
-[ F A-Equipment Failure (Explain).
1-Manual-Entry Sheets for Licensee for Preparation of Data g
B-Maintenance or Test -
2-Manual Scram C-Refueling 3-Automatir. Scram Event Report (LER)
D-Regulatory Restriction 4-Other (Explain)
File (NUREG-0161)
E-Operator Training 6 License Examination F-Achinistrative _
5
. G-Operational Error (Explain)
Exhibit I,- Same Source.
H-Other (Explain) 4/771
4 Docket No.: ~ _50 70 i
Unit: McGuire 2 Date:
1/15/86 Month: December, 1985 McGuire Unit 2 began December at 100% but.was shutdown December lith to repair.
i leaking steam generator tubes. The unit returned to service on December 26 and 4
increased power to 100%.
4 i
t i
i e
r
}
i f
4
,,r.,
,.,_,,.,.;,=,.,,~.
P.0STELY p2 EEI, ISO INFORMATION REQUEST i
.I i
1.
Tacility name:
McGuire Unit 2 2.
Scheduled next refueling shutdown:
April, 1986 1
3.
Scheduled restart following refueling:
June, 1986 4.
Will refueling or resu=ption of operation'thereafter require a technical specification change or other license a=end=ent?
YES If yes, what will these be?
Technical Specification Revision If no, has reload design and core configuration been reviewed by Safety Review Co==ittee regarding unreviewed. safety questions?
N/A 5.
Scheduled date(s) for sub=itting proposed licensing action and supporting infor=ation:
N/A 6.
Important licensing considerations (new or different design or supplier, unreviewed design or perfor=ance analysis =ethods, significant changes in design or new op rating procedures).
7.
Nc=ber of fuel asse=blies (a) in the core:
193 (b) in the spent fuel pool:'
'74 8.
Present licensed fuel pool capacity:
1463 li:e of requested or planned increase:
r 9.
Projected date of last refueling which can be acco==odated by present licensed capacity:
August 2010 DUF2 POWER COMPASY Date:
January 15, 1986 Na=e of
Contact:
J.'A. Reavis Phone:
704-373-7567 i
l e
McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT 1.
Personnel Exposure For the month of November, no individual (s) exceeded 10 percent.of their allowable annual radiation dose limit.
2.
The total station liquid release for November has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for November has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
i 1
j l
l L
r- - '
i
?
DUKE POWER GOMPANY s
i P.O. BOX 33189 -
CHARLOTTE, N.O. 28949 HAL B. TUCKER Tstressown-
- wwm ensamen (704)373 4831 3rs;cLaan peopccytole January 15, 1986 Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Comtission Washington, D.C.
20555 Attention: Document Control Desk Re: McGuire Nuclear Station Docket No. 50-369 and 50-370
Dear Sir:
S
.g Please find attached information concerning the performance and operating' status of the McGuire Nuclear Station for the month of. December, 1985.
Very truly yours, kb-lh Hal B. Tucker
.y
^
7AR/jgm Attachment xc:
Dr. J. Nelson Grace, Regional Administratori '
U.S. Nuclear Regulatory Commission Region II b."
101 Marietta Street, NW, Suite 2900 k
Atlanta,-Georgia 30323 Mr. Phil Ross U.S. Nuclear Regulatory Commission MNBB-5715 Washington, D.C.
20555 t
American Nuclear Insurers c/o Dottie Sherman, ANI Library P
1 i
The Exchange, Suite'245 j
270 Farmington Ave.
Farmington, CT 06032 l
.o
(
Mr. Richard G. Oehl, NE-44 N
,5, J'*
.U.S.
Department of Energy 19901 Germantown Road u
Germantown,-Maryland 20874 9't i
4 t
v w
=
y, ert f
.v -
?
1J;nuary 16,-1986 iPage'Two-n,.
s cc:
INPO Records Center Suite 1500 1100 Circle 75 Parkway Atlanta, Georgia 30323 a-Mr. Darl Hood, Project Manager,.
.1 Office.of Nuclear. Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 4
g.
Mr.'W. T. Orders NRC knior.Recident InspectoE
~
McGuire Nuclear Station
+
Ms. Judy Dovers Nuclear Assurance Corporation
- s. x 5720 Peachtree Parkway Norcross, Georgia 30092 I
.)^
-(
s
. y. _ 'Q b
_y
/,
1 a
J
- 4 '
~9 m
\\.~
s 4
9 3
1 I
- k. -
+
4
- k., m.s.
j D.
g
__y A i t '.