Informs of Several Listed Problems Delaying Completion of Plant ITS Amend.Rev to ITS Application to Resolve Problem Requested
ML20141J058
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 05/22/1997
From: Capra R
NRC (Affiliation Not Assigned)
To: Johnson I
COMMONWEALTH EDISON CO.
References
TAC-M94267, TAC-M94268, NUDOCS 9705270224
Download: ML20141J058 (4)


Text

t May 22, 1997 Ms. Irene Johnson, Acting Manager

. Nuclear Regulatory Services Commonwealth Edison Company Executive Towers West III 1400 Opus P1acec Suite 500 Downers Grove, IL 60E15

SUBJECT:

ZION IMPROVED TECHNICAL SPECIFICATIONS AMENDMENT (TAC NOS. M94267 AND M94268)

Dear Ms. Johnson:

. This is to inform you of several problems that'are delaying completion of the

' Zion Improved Technical Specifications (ITS) amendment. The Current Technical Specification (CTS) markup (page 324) shows the Pressure And Temperature Limits Report Amendmen(PTLR)t Nos. 177being added; and 164 however, issued the PTLR20, on December was already 1996. Weadded to theseveral also found CTS in errors in the table your staff prepared to cross-reference the CTS, the discussions of changes (DOC), and the control documents for items relocated from the CTS. Examples of errors we found in that table include: -

the table has two entries for DOC 5-26 relating to the PTLR, but, as stated >

above, it has already been incorporated by Amendment Nos.177 and 164; for DOC 3.8-4, the table does not show CTS 4.15.1.E being moved to the Bases, it does show CTS 4.15.1.B.3.e being moved to procedures, but this does not agree with the CTS markup; and

[

DOC 3.6-79 shows CTS 4.10.2.A.2 going to the Bases, but the table shows it going to procedures.

These items raise questions about the accuracy of your submittals and tracking system. This concern is causing us to spend additional time verifying information and is delaying completion of this project. Please submit a revision to your ITS ,

application to resolve the problem with the CTS markup related to PTLR and, if '

applicable, for DOC 3.8-4. Also, please arrange for members of your staff to meet with us, at the earliest opportunity, for a working level meeting so that we can 1

evaluate the impact of these items on our safety evaluation. Your attention to i these issues is requested to assure that the proposed ITS is correct and to prevent i further delays in this project.

Sincerely,  !

ORIGINAL SIGNED BY:

Robert A. Capra, Director i Project Directorate III-2 l Division of Reactor Projects -III/IV  !

Office of Nuclear Reactor Regulation Docket Nos. 50-295, 50-304 Distribution: Docket File JRoe, JWR ,

PUBLIC PDIII-2 r/f CMoore g j

EAdensam, EGA1 M. Parker, RIII RCapra  !

cc: see next page CShiraki OGC, 015818 LRossbach ACRS, T2E26 p@ D DOCUMENT NAME: G:\CMNTJR\ ZION \Z194267.1tr Ta receive a copy of this document,Indipate4n thopox: "C" = Cop / with>ut enclosures *E" = Copy with enclosures *N" = No copy 0FFICE PM:PDIII-2 C . LN:PAIII-2 W 0:PDIII-2 lG NAME LROSSBACH&wd QHD0f$ RCAPRA bc-DATE 05/22/97 ~05/.A/797 05/tt/97

" ' ' ^ ' " " " " "

n$58882rs8888,3 NRC FILE CENTER COPY P PDR S J

1

, 6, May 22, 1997 Ms. Irene Johnson, Acting Manager )

, Nuclear Regulatory Services l 4 < Commonwealth Edison Company Executive Towers West III 1400 Opus Place, Suite 500 Downers Grove, IL 60515

SUBJECT:

ZION IMPROVED TECHNICAL SPECIFICATIONS AMENDMENT (TAC NOS. M94267 AND M94268)

Dear Ms. Johnson:

This is to inform you of several problems that are delaying completion of the Zion Improved Technical Specifications (ITS) amendment. The Current Technical Specification (CTS) markup (page 324) shows the Pressure And Temperature Limits Report (PTLR) being added; however, the PTLR was already added to the CTS in Amendment Nos. 177 and 164 issued on December 20, 1996. We also found several errors in the table your staff prepared to cross-reference the CTS, the discussions of changes (DOC), and the control documents for items relocated from the CTS. Examples of errors we found in that table include:

the table has two entries for DOC 5-26 relating to the PTLR, but, as stated above, it has already been incorporated by Amendment Nos. 177 and 164; for DOC 3.8-4, the table does not show CTS 4.15.1.E being moved to the i Bases, it does show CTS 4.15.1.B.3.e being moved to procedures, but this does not agree with the CTS markup; and DOC 3.6-79 shows CTS 4.10.2.A.2 going to the Bases, but the table shows it going to procedures.

These items raise questions about the accuracy of your submittals and tracking system. This concern is causing us to spend additional time verifying information and is delaying completion of this project. Please submit a revision to your ITS application to resolve the problem with the CTS markup related to PTLR and, if applicable, for DOC 3.8-4. Also, please arrange for members of your staff to meet with us, at the earliest opportunity, for a working level meeting so that we can ,

evaluate the impact of these items on our safety evaluation. Your attention to these issues is requested to assure that the proposed ITS is correct and to prevent further delays in this project.

Sincerely, ORIGINAL SIGNED BY:

Robert A. Capra, Director Project Directorate III-2 Division of Reactor Projects -III/IV Office of Nuclear Reactor Regulation Docket Nos. 50-295, 50-304 Distribution: Docket File JRoe, JWR PUBLIC PDIII-2 r/f CMoore EAdensam, EGA1 M. Parker, RIII RCapra cc: see next page CShiraki LRossbach OGC, 015B18 ACRS, T2E26 DOCUMENT NAME: G:\CMNTJR\ ZION \ZI94267.ltr Ta receive a copy of this docurnent,IndipWTt4n the box: *C" = Copy without enclosures *E" = Copy with enclosures *N" = No copy 0FFICE PM:PDIII-2 cd . LN: PAIII-2 l D D:PDIII-2 lG NAME LROSSBAC W W l, QMUMk. RCAPRA hC-DATE 05/2 2497 "05/M797 05/r4/97 0FFICIAL RECORD COPY

purro

[

s t

j UNITED STATES NUCLEAR REGULATORY COMMISSION 1

..'s

%,***** / l May 22, 1997 l

l i

Ms. Irene Johnson, Acting Manager Nuclear Regulatory Services Commonwealth Edison Company Executive Towers West III 1400 Opus Place, Suite 500 Downers Grove, IL 60515

SUBJECT:

ZION IMPROVED TECHNICAL SPECIFICATIONS AMENDMENT (TAC NOS. M94267 AND l

M94268)

Dear Ms. Johnson:

1 This is to inform you of several problems that are delaying completion of the  !

Zion Improved Technical Specifications (ITS) amendment. The Current Technical Specification (CTS) markup (page 324) shows the Pressure And Temperature Limits i Report (PTLR) being added; however, the PTLR was already added to the CTS in i Amendment Nos. 177 and 164 issued on December 20, 1996. We also found several j errors in the table your staff prepared to cross-reference the CTS, the discussions of changes (DOC), and the control documents for items relocated from the CTS. Examples of errors we found in that table include:

the table has two entries for DOC 5-26 relating to the PTLR, but, as stated above, it has already been incorporated by Amendment Nos.177 and 164; for DOC 3.8-4, the table does not show CTS 4.15.1.E being moved to the Bases, it does show CTS 4.15.1.B.3.e being moved to procedures, but this does not agree with the CTS markup; and DOC 3.6-79 shows CTS 4.10.2.A.2 going to the Bases, but the table shows it going to procedures.

These items raise questions about the accuracy of your submittals and tracking system. This concern is causing us to spend additional time verifying information and is delaying completion of this project. Please submit a revision to your ITS application to resolve the problem with the CTS markup related to PTLR and, if applicable, for DOC 3.8 4. Also, please arrange for members of your staff to meet with us, at the earliest opportunity, for a working level meeting so that we can evaluate the impact of these items on our safety evaluation. Your attention to these issues is requested to assure that the proposed ITS is correct and to prevent further delays in this project.

Sincerely,
TO S. [

Robert A. Capra, Director Project Directorate III-2 Division of Reactor Projects -III/IV Office of Nuclear Reactor Regulation Docket Nos. 50-295, 50-304 cc: see next page

4 l

. . t b'

'* . I. Johnson Zion Nuclear Power Station l Commonwealth Edison Company Unit Nos. I and 2 cc:

, Michael I. Miller, Esquire Sidley and Austin

. One First National Plaza i

! Chicago, Illinois 60603 i i

i Dr. Cecil Lue-Hing Director of Research and Development Metropolitan Sanitary District of Greater Chicago  ;

i 100 East Erie Street I

Chicago, Illinois 60611 i

!- Phillip Steptoe, Esquire '

I i Sidley and Austin '

i One First National Plaza  ;

} Chicago, Illinois 60603 l 1

Mayor of Zion I Zion, Illinois 60099  !

Illinois Department of Nuclear Safety Office of Nuclear Facility Safety 1035 Outer Park Drive Springfield, Illinois 62704  ;

U.S. Nuclear Regulatory Commission Zion Resident Inspectors Office 105 Shiloh Blvd.

Zion, Illinois 60099 Regional Administrator U.S. NRC, Region III l 801 Warrenville Road i Lisle, Illinois 60532-4351 Station Manager Zion Nuclear Power Station '

101 Shiloh Blvd.

Zion, Illinois 60099-2797 Document Control Desk-Licensing Commonwealth Edison Company 1400 Opus Place, Suite 400 Downers Grove, Illinois 60515