ML20141H470
| ML20141H470 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 01/08/1986 |
| From: | Brownlee V NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Tucker H DUKE POWER CO. |
| Shared Package | |
| ML20141H473 | List: |
| References | |
| NUDOCS 8601140115 | |
| Download: ML20141H470 (1) | |
See also: IR 05000413/1985054
Text
r
ydra
-
i
'JAN8 W
puke Power Company
VATTN: Mr. H. B. Tucker, Vice President
Nuclear Production Department
422 South Church Street
Charlotte, NC 28242
Gentlemen:
SUBJECT:
REPORT N05. 50-413/85-54 AND 50-414/85-65
On December 9-13, 1985, NRC inspected activities authorized by NRC License
No. NPF-35 and Construction Permit No. CPPR-117 for your Catawba facility. At
the conclusion of the inspection, the findings were discussed with those members
of your staff identified in the enclosed inspection report.
Areas examined during the inspection are identified in the report. Within these
,
areas, the inspection consisted of selective examinations of procedures and
i
representative records, interviews with personnel, and observation of activities
in progress.
Within the scope of the inspection, no violations or deviations were identified.
Should you have any questions concerning this letter, please contact us.
Sincerely,
LS\\
Virgil L. Brownlee, Chief
'
Reactor Projects Branch 2
Division of Reactor Projects
a
Enclosure:
Inspection Report Nos. 50-413/85-54
and 50-414/85-65
cp w/ encl:
4R. L. Dick, Vice President - Construction
Kf. W. Hampton, Station Manager
t
N
ur, NRR
86J11goM
3
Document Control Desk
a
,
pb'Reskd"eYtIns""or
RII @
Il
RII
6
=
SVias:ht
J 41ake
ARHerdt
'
12/ 0/85
/6 /86
if/b /84
5
\\
I
I
i
_TEo l