ML20141G535

From kanterella
Jump to navigation Jump to search
Forwards LER 97-003-00,concerning Inoperability of Hpcis When Wire Lug Was Lifted in Control Circuit on 970601
Date released: 06/03/2020 Download: ML20141G535


:on 970601,HPCI Was Inoperable.Caused by Lifting of Common Power Wire Lug in HPCI Electrical Power Logic as Part of GP-25 Activity.Hpci Sys Was Restored to Operable Condition
ML20141G539
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 06/27/1997
From: Lengyel G
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
References
Download: ML20141G539 (4)
Forwards LER 97-003-00,concerning Inoperability of Hpcis When Wire Lug Was Lifted in Control Circuit on 970601
ML20141G531
Person / Time
Site: Peach Bottom Constellation icon.png
Issue date: 06/27/1997
From: Geoffrey Edwards
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
Download: ML20141G531 (1)