ML20141F464
| ML20141F464 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 04/14/1986 |
| From: | Frank Akstulewicz Office of Nuclear Reactor Regulation |
| To: | Opeka J CONNECTICUT YANKEE ATOMIC POWER CO. |
| Shared Package | |
| ML20141F467 | List: |
| References | |
| NUDOCS 8604230030 | |
| Download: ML20141F464 (5) | |
Text
-
/
UNITED STATcs
{
p, NUCLEAR REGULATORY COMMISSION 3
( [
W ASHINGTON, D. C. 20555 April 14.1986 Docket No. 50-213 Nr. John F. Opeka, Senior Vice President Nuclear Engineering and Operations Connecticut Yankee Atomic Power Company Post Office Box 270 Hartford, Connecticut 06141-0270
Dear Mr. Opeka:
SUBJECT:
CYCLE 14 RELOAD TECHNICAL SPECIFICATIONS Re:
Haddam Neck Plant The Commission has issued the enclosed Amendment No. 74 to Facility Operating License No. OPR-61 for the Haddam Neck Plant. This amendment is in response to your application dated December 11, 1985.
Your application requested changes to the technical specifications to permit plant coastdown at the end of cycle 14.
An our meeting with your staff on January 23, 1986, we learned that all the necessary analyses to support a plant coastdown had not been done. At that time, we informed your staff, as documented in Reference 10 of the Safety Evaluation, that the staff could not approve coastdown for cycle 14 without additional supporting analyses.
Per telephone call on January 24, 1986, we were informed that CYAPCo was withdrawing its request for coastdown for cycle 14 and were provided with the necessary editorial changes to remove references from the proposed technical specifications. The technical specifications being issued with this license amendment do not permit the use of a coastdown for cycle 14 without a
~
separate license amendment.
The license amendment changes the technical specifications that are directly related to the fuel cycle design and safety analyses for plant operation during cycle 14. The technical specification changes include: 1) the definition of quadrant power tilt ratio; 2) setpoints for protection instrumentation;
- 3) isothermal coefficient of reactivity; 4) limiting heat generation rates;
- 5) power distribution monitoring and controls; and 6) reactor coolant system flow, temperature and pressure.
A Notice of Consideration of Issuance of Amendment to License and Proposed No Significant Hazards Consideration Determination and Opportunity for j
Hearing related to the requested action was published in the Federal Register on January 29, 1986 (51 FR 3713'). No comments or requests for hearing were '
j received.
860414 T 2]@as osoog2y 3 P
L
. A copy of our related Safety Evaluation is enclosed. Consistent with the agreement documented in Reference 10 of the Safety Evaluation, CYAPCo should either provide a fuel misloading analysis, or justify why one is not required, before the end of cycle 14 operation. This action will appear in the Commission's biweekly notice publication in the Federal Register.
Sincerely, AWWhY-Francis M. Akstulewicz, Jr Integrated Safety Assessment Project Directorate Division of PWR Licensing - B
Enclosures:
1.
Amendment No. 74 to License No. DPR-61 2.
Safety Evaluation cc w/ enclosures:
See next page 1
~
April 14,1986
~ A copy of our related Safety Evaluation is enclosed. Consistent with the agreement documented in Reference 10 of the Safety Evaluation, CYAPCo should either provide a fuel misloading analysis, or justify why one is not required, j
before the end of cycle 14 operation. This action will appear in the i
Cocunission's biweekly notice publication in the Federal Register, i.
Sincerely, Original signed by: F. Akstulewicz Francis M. Akstulewicz, Jr i
Integrated Safety Assessment Project Directorate Division of PWR Licensing - B
Enclosures:
1.
Amendment No. 74 to License No. DPR-61 2.
Safety Evaluation I
cc w/ enclosures:
See next page
[
DISTRIBUTION I
- sNiiER"TTie S OELD
~ NRC ' PDR '" ' ' ^
ELJordan Local POR BGrimes 1
ISAP Reading JPartlow NSIC ACRS (10)
RDiggs (w/TACS)
FMiraglia TBarnhart (4)
FAkstulewicz LJHarmon PAnderson MVirgilio OELD WJones CMiles, OPA 4
i
- SEE PREVIOUS SHEET FOR CONCURRENCE.
DPL-B:ISAP*
DPL-B:ISAP*
DPL-A:RSB*
DPL-B:I
/ OELD /
FAkstulewicz:lt PAnderson CBerlinger CGrimes L
@W 04/09/86 04/09/86 04/09/86 04/10/86 a/86 b
fN l
L
2-A copy of our related Safety Evaluation is enclosed.
Consist t with the agreement documented in Reference 10 of the Safety Evaluati
, CYAPCo shall provide a fuel misloading analysis before the end of cycl 14 operation. This action will appear in the Commission's biweekly notice blication in the Federal Register.
Sincerely, Fr cis M. Akstulewicz, Jr I egrated Safety Assessment Project Directorate Division of PWR Licensing - B
Enclosures:
1.
Amendment No.
to License No. DPR-61 2.
Safety Evaluation cc w/ enclosures:
i See next page DISTRIBUTION Docket File OELD i
NRC PDR ELJorda Local PDR BGrimes ISAP Reading JPar low
~ NSIC.
ACR (10)
RDiggs (w/TACS)
FMiraglia T rnhart (4) 4 FAkstulewicz LdHarmon PAnderson p'Nirgilio OELD WJones CMiles, OPA 1
DPL-B:ISAP DPl d AP
[
d DPL-B:ISAP OELD
]
04/g/86 04/i/86 0(B FAkstulewicz:lt par erson nger CGrimes 4
/86 04/ /86 04/ /86
(
n t
Mr. John F. Opeka Connecticut Yankee Atomic Power Company Haddam Neck Plant CC:
Gerald Garfield, Esquire Kevin McCarthy, Director Day, Berry & Howard Radiation Control Unit Counselors at Law Department of Environmental City Place Protection Hartford, Connecticut 06103-3499 State Office Building Hartford, Connecticut 06106 Superintendent Haddam Neck Plant Richard M. Kacich, Supervisor RDF #1 Post Office Box 127E Operating Nuclear Plant Licensing Northeast Utilities Service Company East Hampton, Connecticut 06424 Post Office Box 270 Hartford, Connecticut 06141-0270 Edward J. Mroczka Vice President, Nuclear Operations Northeast Utilities Service Company Post Office Box 270 l
Partford, Connecticut 06141-0270 Board of Selectmen Town Hall Haddam, Connecticut 06103 State of Connecticut Office of Policy and Management ATTN: Under Secretary Energy Division 80 Washington Street Hartford, Ccnnecticut 06106 Resident Inspector Haddam Neck Nuclear Power Station c/o U.S. NRC East Haddam Post Office East Haddam, Connecticut 06423 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 h
kl>
L.