.. . .. .-_ .- .-
June 26, 1997 Mr. James Davis
- Nuclear Energy Institute l 1776. Eye Street, N. W.
Suite 300 Washington, DC 20006-2496
Dear Mr. Davis:
l The purpose of this letter is to transmit a summary of the Technical Specifications Task Force (TSTF) meeting, which took place at the Nuclear
[ Regulatory Commission in Rockville, Maryland, on June 19, 1997.
Sincerely, Original Signed By William D. Beckner, Chief Technical Specifications Branch Office of Nuclear Reactor Regulation I
l
Enclosure:
As stated l cc: J. Volkoff, CE0G B. Ford, BWROG M. Eades, BWROG
!. L. Bush, CE0G D. Wuokko, BWOG C. Szabo, BWOG D. Hoffman, TSTF C. Grimes, PDLR/DRPM
! s DISTRIBullg(:
N File Ceater PUBLIr l
RZi:nmerman DI i*y lo m,eh 1 JRoe 1y 67 l SVarga )( N N l WBeckner TSB Staff NRC FILE CENTER COPY #
i
> t t 010015 d, pb i
DOCUMENT NAME G:\DLJ\MTCSUM06.97 I 0FFICE NRR/ADPR/TSB. NRR/ADPR/TSB .c,
%AME DLJohnson ,/M WDBeckner V' 10 ATE 06/24/97 0 06/ 14 /97 a
, 9707010194 970626 'CIAL RECORD COPY PDR REVGP ERONUMRC I PM
D
' je9 %,
g 4 UNITED STATES l g j NUCLEAR P.dGULATORY COMMISSION WASHINGTON, D.C. 30666-0001
! o 0
4,,,,* June 24, 1997 Mr. James Davis Nuclear Energy Institute 1776 Eye Street, N. W.
Suite 300 Washington, DC 20006-2496 l
j
Dear Mr. Davis:
The purpose of this letter is to transmit a summary of the Technical Specifications Task Force (TSTF) meeting, which took place at the Nuclear Regulatory Commission in Rockville, Maryland, on June 19, 1997.
Sincerely, U JA U-William D. Beckner, Chief l Technical Specifications Branch Office of Nuclear Reactor Regulation
Enclosure:
As stated cc: J. Volkoff, CE0G l B. Ford. BWROG M. Eades, BWROG L. Bush, CEOG D. Wuokko, BWOG l C. Szabo, BWOG l D. Hoffman, TSTF i
l l
l 4
_ _. _m . . _ . . _ . _ . _ _ . _ _ . _ _ _ _ _ _ . _ . _ . _ . _ . _ . _ _ _ . _ . . . _ _ _ _ _ . . _
j i TECHNICAL SPECIFICATIONS TASK FORCE MEETING
SUMMARY
June 19, 1997
- A meeting between the NEI Technical Specifications Task Force (TSTF), and NRC I j staff was held on June 19, 1997. The attendees were
i l James Davis, NEI Christopher Grimes, NRC/PDLR l Clint Szabo, Entergy/BWOG William D. Beckner, NRC/TSB l John Volkoff, BGE/CEOG F. Mark Reinhart, NRC/TSB
- Marsha Eades, Entergy/BWROG Tom Dunning, NRC/TSB
! Donald Hoffman, EXCEL Services Carl Schulten, NRC/TSB Steve Katradis, NUS-LIS Maggalean Weston, NRC/TSB ,
- Jared Wermeil, NRC/HICB Deborah Johnson, NRC/TSB i i Angelo Marinos NRC/HICB i Hukam Garg, NRC/HICB The Attendees List is Attachment 1.
- Coments on Meetina Summary of Acril 17. 1997 Meetina i Mr. Reinhart asked for comments on the meeting summary transmitted to James i Davis, Nuclear Energy Institute, by letter dated May 6,1997. Mr. Hoffman's comments follow the related section titles
- 1. Traveler Discussion: The TSTF Owner's Group (OG) will backfit all l previously-submitted EDIT packages with a numbering system that can be j tracked. The OG will withdraw the three EDIT packages that were referred
- to and more carefully consider those packages being submitted as editorial
! changes.
- 2. Use of 50.59 Process for Relocated Items: After some discussion, the OG concluded that they will develop guidance to clarify the distinction :
between L, and L, process and submit to NRC for comments.
- 3. TSTF Processina Procedures: The OG acknowledged that there have been some problems in the past with illegible traveler packages because the copying process left the hand-marked changes too light, and accepted that, should ,
there be any future submittal of this type, NRC would reject them. '
l l
Status of Travelers A meeting package (Enclosed) was given to all attendees containing a brief list of pending travelers and a more detailed status report of pending travelers.
Those pending travelers indicating that they have been forwarded to either Mr.
Grimes or Mr. Reinhart are being held for the incoming Branch Chief, Mr. Beckner.
In addition, the meeting package included status reports showing those travelers that were approved, modified, and withdrawn since the last OG meeting. A status report of all editorial change packages received was also included in the meeting package.
The OG indicated that thirteen revision packages are about to be sent to NRC.
The OG inquired as to the status of TSTF-067. Mr. Reinhart indicated that it is close to disposition and he will follow-up with the reviewer.
The OG inquired as to the status of TSTF-135. Mr. Wermeil, HICB, indicated that his staff has gone through most 7f the package. The OG indicated that the comment portion of the status reart indicating the six-week review time was helpful in their planning. Mr. Schulten stated that he was inclined to modify the traveler to preclude holding-up the entire package.
The OG inquired as to the status of TSTFs -199 through -123 (the break-out of TSTF-ll5). Some discussion ensued with the conclusion that the OG should send NRC a copy of the IEEE endorsemant letter for these travelers to NRC, which would assist the review.
The OG accepts the rejection of TSTFs -041 and -048, which proposed changes to LC0 3.0.7, and intends to submit a new, single proposal.
The NRC inquired as to the status of TSB-011 regarding improvement to the technical specification administrative controls section. The OG responded that the CE0G is reviewing this proposal and will have a determination within six weeks.
TSTF processina A discussion began when the OG expressed concern about NRC agreeing that plants could submit pending TSTF changes as part of their conversion packages, then asking them to remove the references when review of the conversion package is completed and TSTFs are still pending. Both NRC and the OG agreed that improvements are needed for the TSTF approval process and the OG will attempt to more strongly base their classifications so that NRC will be better able to judge the priority. This topic will be part of the agenda for the next meeting.
Channel Functional Testina i
TSTF-064 proposed a change to the definition of Channel Calibration in all of the standard technical specifications, with corresponding changes to Channel ,
l Functional Test because of " frequent misinterpretations of this phrase." After reviewing, the Technical Specifications Branch (TSB) found that the proposed change did not improve the understanding of these terms, but believe that a change to these definitions or some other clarification of the NRC's expectations i
I
! 1 i
! : for the related practices is warranted. Therefore, TSB forwarded the proposed change to the Instrumentation and Controls Branch asking that they determine what action is appropriate to calibration and testing concerns. The OG acknowledged that a definition needs to be established and will submit within two to four weeks their position.
OG Priorities /Ma.ior Issues 1 Mr. Hoffman stated that the OG had, during their meeting this morning, concluded that there were six priorities or major issues. They are listed, but not necessarily in priority order: l
- 1. TSTF Resolution Process and Schedule i
- 2. Control of Relocated Items (L./Lr/50.59)
- 3. Generic ITS Conversion Process
- 4. Writer's Guide Revisions
- 5. Word Processing Platform and SGML
- 6. Individual Plant ITS Review Process Disoosition Wordina for TSTFs that are Revised Ms. Johnson indicated that the OG sometimes submits revisions to proposed change packages before NRC makes a disposition, which leaves the original proposal in a sort-of limbo. She requested that the OG have a discussion and suggest wording to indicate, within the tracking database, that the original packages had been ,
dispositioned. It was decided that the wording of the disposition for those '
packages that have been superseded will be Closed, and a notation in the Comment portion will indicate which TSTF and revision is now active.
Aaenda for Future Meetina The next meeting of the NEI-TSTF and NRC will be held sometime in July 1997; a specific date for the meeting will be agreed upon later. The topics to be !
discussed include Process Improvements for Conversions and the Status of Pending Travelers, with the OG communicating significant issues prior to the meeting.
I
i Attachment 1 l
t I
l t.
ATTENDEES LIST NRC/TSTF OWNER'S GROUP MEETING JUNE 19,1997 NAME ORGANIZATION ADDRESS PHONE # E-MAIL ID James Davis Nuclear Energy 1776 Eye Street, NW 202-739-8105 jwd@nei.org institute (NEI) Washington, DC 20006 Clinton Szabo BWOG/EOl/ANO 1448 S. R. 333 501-858 4622 cszabo@
Russellville, AR 72801-0967 entergy.com John Volkoff CEOG/BGE 1650 Calvert Cliffs Parkway 418-495 3649 John.Volkoff@B Lusby, MD 20657-4702 GE.com Mrrsha Eades BWROG/WPPSS Box 968, PEC, MD-PEZO 509-377-4277 MGEADES@WN Richland, WA 99352 P2.com Donald Hoffman EXCEL /TSTF 11921 Rockville Pike 301-984-4400 donaldh@ l Suite 100 excelsves. I Rockville, MD 20852 com Steve Katradis NUS LIS 910 Clopper Road 301-258-2448 skatradis@
Gaithersburg scientech.
com Jarzd Wermiel NRR/HICB/DRCH NRC 301-415 2821 jsw1@nrc. gov Angelo Marions NRR/HICS/DRCH NRC 301-415 2911 ecm@nrc. gov Hukam Garg NRR/HICB/DRCH NRC 301-415 2929 hcg @nrc. gov Christopher 1. NRR/PDLR/DRPM NRC 301-415-1183 cig@nrc. gov Grimes William Beckner NRR/TSB/ADPR NRC 301-415 1161 wdb@nrc. gov Mark Reinhart NRR/TSB/ADPR NRC 301-415-1185 fmr@nrc. gov Tom Dunning NRR/TSB/ADPR NRC 301-415-1189 tod@nrc. gov I Ctrl Schulten NRR/TSB/ADPR NRC 301-415-1192 css 1@nrc. gov Maggalean Weston NRR/TSB/ADPR NRC 301-415-3151 mww@nrc. gov Daborah Johnson NRR/TSB/ADPR NRC 301-415-3060 dij@nrc. gov Page 1 of 1 l
TSB PENDING TRAVELLERS v June 1997 TSTF # TSB Action l 2,R.1 EST Proposed chnages to the Bases for SR 3.8.3.5 submitted to EELB, EST &
j CCH on 5/15/97. No response.
16, R.1 EST Scope of the issues are defined in a note from CGrimes dated 4/10/97.
36, R.2 CCH Ae/ect basis for #36 to C/G 5/12/97. A meeting is needed to resolve the issues.
l 19, R.1 CSS to reviewer 4/10/97' 23, R.2 MWW to reviewer 4/10/97 27, R.2 30, R.1 CSS to CIG 3/17/97. Reviewer recommended modification. (TSTF should provide References 7 and 8 for page B 3.6 32 (BWR/4 STS).)
37, R.1 EBT to C/G 5/12/97 39, R.1 CCH to CIG 3/14/97 l
l 51 RJG Proposed FHA Action Plan returned for further work; closeout letter for l
! 68, R.1 Grand Gulf amendment referred from PM. '
58 NVG Commission approved the RI-TS pilot; address as soon as ANO amendment l l 59 is issued.
64 CCH to CIG 2/4/97 65 MWW to CIG 6/20/96 67 TRT 5/2/97 returned to reviewer to supplement cornments with a note-to file 69 CSS still awaiting HlCB 72 73 75 76 81 87, R.1 MWW pending receipt of revision package from TSTF 88 CCH to ClG 2/4/97
. 92, R.1 MWW pending review 105 MWW to C/G 5/29/97 110, R.1 TRT pending review 111, R.1 CSS pending review l 113 MWW to ClG 11/5/96 116. R.1 MWW pending review
! 119 TRT Referred to SPLB 3/17/97
! MLR l
l G:\TSTF-DUE.o67 Page 1 l
i
l 4
!* TSTF# TSB ActiSn 4
i 120 EST ClG returned to coordinate with EMC8 to develop recommendation to Modify changes to provide guidance on incorporating applicable standards.
124 CCH pending review 127 TRT pending receipt of revision package from TSTF 128 MWW TSTF justification technically incorrect. To M. Reinhart for disposition 6/18/97.
135 CSS pending HICB review 141 TRT to CIG IV29/97 142 145, R.1 RJG to MReinhart 6/6/97
{
151 MWW ' to MReinhart 6/18/97 161 CSS pending review 162 MWW pending review 1
163 EBT to ClG 5/12/97 167 TRT to CIG 5/29/97 1
168 CSS pending review l 169 170 171 172 178 179 180 181 182 183 184 185 186 j
187 i 188 189 j
190 191 192 l i
173 RJG to MRetnhart 6/6/97 l
l 177 MWW pending review I 195 197 196 RJG oendina review I G:\TSTF-DUE.067 Page 2
TSTF # - TSB Action
$ 198 EBT pending EELS review 199 200 201 202 203 l
l e
l l
i a: STF-DUE.067 Page 3
- _ __-a___.
Modified Status Report of the STS, Rev. 2, Changes Pending Travellers Chapters or NUREGs Package NRC Contact Package # LCOs Affected Affected Status Comments TOMLINSON, E TSTF-002, R.1 3.8.3, B3.8.3 All OGs 10/3/95 pkg rec'd. 10/12/95 E. Relocate the requirements of SR 3.8.3.6 (10 year ;
Tomlinson reviewing. Pkg sediment deaning of fuel oil storage tank) to hcensee referred to EELB (Frank Ashe) control. 6/11/96 C. Grimes comment TSB will accept forinput 9/17/96 TSB still with modification: add darification to Bases for the fuel awaiting EELB review oil tank surveillance requiremerd, which would refer to recommendation. 4/10/97 the tank maintenance practices. The Tech Branch not TSB still awaiting EELB buying in on a generic basis. 4/10/97 CGrimes retumed ,
response. pkg to reviewer to determine whether darification will resolve EELB's concems. 5/15/97 Mi. Grimes provided a proposed solution to EELB. i TOMLINSON, E TSTF-016 3.8.9 PWRs and 10/3/95 pkg rec'd. 10/11/95 Add Action to LCO 3.8.9 to require enty into LCO 3.0.3 BWPJB assigned to E. Tomlinson. when there is a loss of function. NRC-20, C.1 changed t 12/15/95 TSTF to resubmit BWR/4. 6/11/96 C. Grimes comment: TSTF-16 TSTF-16. changes are not a major problem, consistency problems. Needs clarification of 3.0.3. 9/24/96 Reviewer discussed comments with Tech Branch (EELB) and they agree to his proposal to reject because ,
the change proposes conection of a problem because of ;
in" > pcration of NRC-02, wtuch should not have been ;
acc ; Sed previously it does not indude a time elemerd ;
for determining the existence or absence of a loss of '! '
function; and the NUREGs treatment of Distribution Systems is a compromise that works poorty and is not ,j satisfactory to either the Owner's Group nor the staff.
More elaboration is contained in the attachment to the ,
Traveller.
l ReportPnntet 6ft9/97 1
Modified Status Report of the STS, Rev. 2, Changes l
Pending Travellers Chapters'or NUREGs Package NRC Contact Package # LCOs Affected Affected Status Comments TOMLINSON, E TSTF-016. R.1 3.8.9 PWRs and 32/96 TSTF-16. R.1, 32/96 Revised to include all Action and Bases changes BWRM received and assigned to E. needed for all NUREGs.
Tomhnson. 9/24/96 Reviewer
{
recommended rejection.
9/26/96 to C. Grimes for disposition. 4/10/97 C.
Grimes requested meeting with TSB staff via Note.
SCHULTEN, C. TSTF-019 R.1 1.1, B 3.3.1, B BWOG, 4/7/97 Rec'd package. Relocate the details of RTD and thermocouple 3.3.3, B 3.3.4, WOG, 4/10/97 Forwarded to reviewer. calibration from the Channel Calibration definition.
B 3.3.11 A, B CEOG 3.3.11 D, B 3.3.12A, B 3.3.12D, B 3.3.17 B 3.3.18 WESTON, M. TSTF-023, R 2 3.9.2, 3.9.3, B WOG 4/7/97 Rec'd package. Revised to bracket NUREG-1431 LCO 3.9.2, Unborated ,
3.9.2, B 3.9.3 4/10/97 Fonwarded to reviewer. Water Source Isolation Valves, and add revm' wer's note.
WESTON, M. TSTF-027. R.2 3.4.2, B 3.4.2 BWOG, 4/7/97 Rec'd package. Revised SR frequency for Mmimum Temperature for WOG, 4/10/97 Forwarded to reviewer. Criticality.
CEOG '
Report Ptinted: 6ff$W7 2
-. . . - . _ - - . ~ . . . - . - . - . - . . - _ - - _ - - - - - - - - - . - . . . . - . ~ . - . . - - - . - . - - . - - - - .
i Modified Status Report of the STS, Rev. 2, Changes Pending Travellers Chapters or NUREGs Package i NRC Contact Package # LCOs Affected Affected Status Comments '
i SCHULTEN, C. TSTF-030, R.1 3.6.3, B 3.6.3, BWOG, 1/23/97 received Revision 1 TSTF Revised to indude "and a closed system" after 3.6.1.3,B WOG, and pmvided to C. Schulten PCIV" at the end of the line in sechon 3.6.1.3, Adion -
3.6.1.3 CEOG, forreview. 3/10/97 Reviewer C, NOTE. 3/10/97 Reviewer noted that in Rev. O, TSTF !
B W R/4, recommends modification. revised Adion C, NOTE, to include "and a closed i B W R16 3/17/97 to C. Grimes for system" after PCIV" at the end of the line. In Rev.1 disposition. TSTF should provide References 7 & 8 for page B 3.6-32 (BWR/4 ST3).
TOMLINSON, E TSTF-036 R.1 3.7.13,3.8.2, All OGs 1/3/96 pkg rec'd and assigned Addition of LCO 3.0.3 N/A to shutdown elechical power .
3.8.5, 3.8.8, to E.Tomlinson. 9/17/96 specifications. 6/11/96 C. Grimes comment: TSTF-36 ,
3.8.10 Reviewer recommended will be rolled-in with TSTF-16. 8/12/96 TSTF-36, R.1, i B3.7.13, rejection. Pkg to C. Grimes rec *d to correct WOG B 3.7.14 to B 3.7.13. 9/17/96
. B3.8.2, B3.8.5, for review. 9/26/96 C. Grimes Reviewer proposes rejection because submittal is 83.8.8, B3.8.10 indicated package should be incomplete. Submittal should include markups of all TS :
i rolled-in with TSTF-16. & Bases affected, plus the wonhng for the lasert. These 4/10/97 C. Grimes requested have not been provided 9/17/96 Pkg to C. Grimes for meeting with TSB staff via review. 9/26/96 C. Gdmes comment: Clanfication of Note. note is appropnate. Pending roll-in with TSTF-16. l t
i I
I i
r r
Report Printed- 6ff 9N7. 3
i Modified Status Report of the STS, Rev. 2, Changes Pending Travellers l
Chapters or NUREGs Package NRC Contact Package # LCOs Affected Affected Status Comments TOMUNSON, E TSTF-038, R.2 3.8.2, 3.8.5, All OGs 1/23/97 Revision 2 received TSTF Appealed to revise insert 3.0.3 NA for PWRs as 3.8.8,3.8.10, and provided to E. Tomlinson follows: " MODE 4 or 5" changed to " MODE 5 or 8* and ,
3.3.8,3.3.10, for review. 5/9/97 reviewer " MODE 1,2, or 3" changed to MODE 1,2,3, or 4". !
3.7.13,3.7.14. recommended rejection. " Insert 3.0.3 NA" for WOG B 3.7.14 not in new package, l B 3.8.2, B 5/12/97 to C. Grimes for but was in orl0inal package;" Insert 3.0.3 NA" for WOG j 3.8.5, B 3.8.8, disposition. B 3.7.13 is included in new package but was not in ;
B 3.8.10. B original. 5/9/97 For a typical two train plant, the i
, 3.3.8 B 3.3.10, proposed change is not necessary. Therefore, with !
B 3.7.13 B respect to Section 3.8 the proposed generic change ,
3.7.14 should be rejected. inclusion of the proposed exception !
may be considered on a plard-specific basis if it can be shown that the above discussion is not applicable to the ,
plant design. More reviewer elaboration is contained in hard-copy file. !
TOMLife 7TF-037, R.1 3.3.3, 3.3.3.1, All OGs 1/23/97 Revision 1 seceived TSTF Appealed to submit new sections for PWRs. ,
3.3.11, 3.3.17, and provided to E. Tomlinson Revised to change Spec reference in section 3.3.3.1, !
3.8.1,5.8,B for review. 5/9/97 reviewer REQUIRED ACTION B.1 and G.1; in section 3.8.1, 3.3.3,B recommended modification. FREQUENCY changed for SR 3.8.1.2 and SR 3.8.1.3, ,
3.3.3.1,B 5/12/97 to C. Grimes for and deleted Table 3.8.1-1; section 5.8.7 deleted and 3.3.11, B disposition. following sections numbers changed; and changes in 3.3.17. B 3.8.1 Bases made to reflect above changes. 5/9/97 The change is acceptable h concept. However, some modifications are required. More elaborabon is ;
contained in the hard-copy file.
i
- Report Printed
- 6ffSNT 4
Modified Status Report of the STS, Rev. 2, Changes Pending Travellers Chapters or NUREGs Package NRC Contact Package # LCOs Affected Affected Status Comments HARBUCK, C. TSTF-039 R.1 1.1- BWOG, 5/29/96 revision pkg rec'd and 1/30/97 The proposed change is contrary to the way the -
1 WOG assigned to C. Harbuck. COT and TADOT and CFT are meant to be performed.
1/30/97 reviewer Recommend l&C Branch Review.
recommended change be rejected, but refer to HICB.
2/13/97 Transmittal note -
propered and routed for concurrence / signature to reviewer /C. Grimes. 3/14/97 via e-mali to DLJ and CCH, C.
Grimes deemed referral to Tech Branch unnecessary and will make disposition.
i t
'I Report Pnnted: Uf 9N7 5
- - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _____.___i
Modified Status Report of the STS, Rev. 2, Changes Pending Travellers Chapters or NUREGs Package NRC Contact Package # LCOs Affected Affected -
Status Comments GIARDINA, R. TSTF-051 3.3.6,3.3.6.1, BWOG, 4/23/96 pkg rec *d and Revise containment requirements during handling l
L 3.3.6.2, 3.3.7, WOG, assigned to NRR Tech irradiated fuel and core alterations. (Not all Bases 3.3.7.1, 3.3.8, CEOG, Branches for review. sections are listed; they would not fit in the text field.
3.3.9,3.3.10, BWR/4, The sections not included are: B3.3.7, B3.3.7.1, B3.3.8, 3.3.15,3.3.16, BWRNi B3.3.9 B3.3.10, B3.3.15, B3.3.16 B3.6.3, E3.6.1.3, 3.6.1.3, 3.6.4.1, B3.6.4.1, B3.6.4.2, B3.6.4.3, B3.7.3, B3.7.4. 83.7.10, 3.6.4.2, 3.6.4.3, B3.7.11 B.3.7.12, B3.7.13, B3.7.14, B3.7.16, B3.8.2, 3.7.3, 3.7.4, B3.8.5, B3.8.8, B3.8.10, B3.9.3, B3.9.4 B3.9.6.) R.
l 3.7.5,3.7.10, Giardina is listed as primary contad because he had the l 3.7.11, 3.7.12, most sections for review; Schulten Tomlinson &
3.7.13,3.7.14, Weston are secondary. 6/11/96 C. Gnmes comment:
3.8.2, 3.8.5, TSTF-51 pkg was not a " job" for TSB; R was referred to 3.8.8,3.8.10, DRPM. TSTF-51 is being appended to an action plan.
3.9.3, 3.9.4, DRPM staff will revisit fuel handling and revise the SRP.
3.9.6, B3.3.6, B3.3.6.1, B3.3.6.2..
ReportPnnted 6f1987 6
Modified Status Report of the STS, Rev. 2, Changes Pending Travellers
~
Chapters or NUREGs Package NRC Contact Package # LCOs Affected Affected Comments Status GILL'ES, N. TSTF-058 3.5.2, B3.5.2 CEOG 6/12/96 pkg rec'd and lacorporate CE NPSD-995 recomrpendations into the assioned to M. Weston. ECCS specification. 10/25/96 Hold for RI-TS pilot SE.
7/16/96 pkg reassigned to N. 4/17/97 Awaiting Commission action on the Risk-Gilles. Informed Technical Specification
- pilot" approvals.
GILLES, N. TSTF-059 3.5.1, B3.5.1 CEOG 6/12/96 pkg rec'd and incorporate CE NPSD-994 recommendations into the assioned to M. Weston. SITS specifications. 10/25/96 Hold for RI-TS pilot SE.
7/16/96 pkg reassigned to N. 4/17/97 Awaiting Commission action on the Risk-Gilles. Informed Technical Specification " pilot" approvals.
HARBUCK,C. TSTF-064 1.1 All OGs 6/12/96 pkg rec'd and Clarification of applicability of Channel Calibration and assioned to C. Harbuck. Channel Functional Test. 1/31/97 The proposed change 1/31/97 reviewer is unnecessary because the meaning of the existin0 recommended rejection. wording is clear. 2/4/97 to C. Grimes for dispostion.
2/4/97 to C. Grimes for disposition.
WESTON, M. TSTF-065 2.0, 5.1, 5.2, All OGs 6/12/96 pkg rec'd and Use of generic titles for utility positions. 6/18/96 5.5, [5.7], assigned to R. Tjader. reviewer comment: reviewers must be consistent in the B2.1.1 6/13/96 reviewer recommend use of brackets (Section 2.0). Why aren't brackets used I approval. 6/20/96 to C. in the Bases 7 Grimes to review.
Report Printed: W11V97 .
7
_________________-J
Modified Status Report of the STS,'Rev. 2, Changes Pending Travfillers Chapters or NUREGs Package NRC Contact - Package # LCOs Affected Affected Status Comments ,
TJADER, R. TSTF-067 1.1, 3.1.5, CEOG 6/12/96 pk0 rec'd and Correction of Shutdown Margin definition. Package was 3.1.6, 3.1.7, assigned to C. Harbuck and R. referred to SRXB for review on or about 11/1/96. 2/4/97 3.1.8. 2.1.9, Tjader. 2/4/97 L Kopp. SRXB B. Tjader checked status of review and found that L B3.1.1, b3.1.5, reviewing package. 3/10/97 Kopp will complete his review this week. 3/10/97 SRXB B3.1.6, B 1.1.7, SRXB recommended 1) does not a0ree with change in definition of SDM, and B.3.1.8, F3.1.9 rejection;TSB reviewer 2) found that actions requiring SDM check and boration concurs. 3/27/97 to C. Grimes are included in other vendor's TS and does not know fordisposition. 4/22/97 R. why the problem is exclusive to CE. 3/10/97 TSB Tjader changed Reviewer suggests SDM is correct as it is. 4/22/97 As a recommendation to approve. result of a meeting between NRC reviewer SRXB and 4/29/97 to C. Grimes for CEOG, NRC will accept changes & recommend disposition. 5/2/97 retumed to approval. Reviewercomment:"CE Accident Analysis reviewer. results in CEA insertion limits, some of which are more conservative than apresenbod SDM calc. Analysis does
~
not lend itself to stra*0htforward SOM calculations, such as in W (which assumes a fixed red insertion in their SDM cales.)--CE specific-if cannot restore insertion limits in 2 hrs =>S/D. 5/2/97 C. Grimes retumed to j reviewer to supplement comments with a note-to-file !
descntung SRXB's involvement in meetinos with CEOG i to clarify differences between CE and Westinghouse methodologies.
WESTON, M. TSTF-068 3.9.3, 3.9.4, PWRs 8/12/96 pkg rec'd and Containment personnel airiock doors open during fuel B3.9.3, B3.9.4 assigned to M. Weston. movemerd. This change is within the scope of changes that are proposed in TSTF-51 for Fuel Handling Accedents. Accordingly, this change should t.e resolved as part of the associated FHA Task Action Plan.
ReportPrintet W1997 8
t i
Modified Status Report of the STS, Rev. 2, Changes !
Pending Travellers i Chapters or NUREGs Package NRC Contact Package # LCOs Affected Affected " Status Comments GIARDINA, R. TSTF-068, R.1 ' 3.9.3,3.9.4 B BWOG, 1/23/97 Revision 1 received TSTF Revised insert 2: reworded to read "The 3.9.3, B 3.9.4 WOG, and provided to R. Girdina for containment..provided that [a minimum of] one door CEOG review.1/23/97 is...Should a fuel handlin0 containment, a minimum of Recommendation pending one personnel. " where words in brackets were struck. i resol stion of TSTF-051. ,
SCHULTEN C. TSTF-069 3.3.1 CEOG 7/17/96 pkg rec'd and Remove SR 3.3.1.6 from Function 14 and 15 in Table assigned to C. Schulten. 3.3.1-1 (Digital).
10/31/96 reviewer recommends approval and ,
transmittal to HICB for concurrence. 11/15/96 referred to HlCB; assigned to B. Marcus. ,
SCHULTEN, C. TSTF-072 3.3.1, B3.3.1 CEOG 7/17/96 pkg rec'd and Split Function 12 in Table 3.3.1-1 Ir:to two Funchons. !
assigned to C. Schutten.
10/31/96 reviewer recommends approval and referral to HlCB for ,
concurTence.
SCHULTEN, C. TSTF-073 3.3.1 CEOG 7/17/96 pkg rec'd and Indicate that RC Flow- Low, Step Allowable value assigned to C. Schulten. is<=[7,231] psid.
10/31/96 reviewer ,
recommends approval and !
referralto HICB for -
concurrence.
ReportPnnted 6ffQN7 9 t l i I
i Modified Status Report of the STS, Rev. 2, Changes !
Pending Travellers i
Chapters or NUREGs Package NRC Contact Package 8 LCOs Affected Affected Status Comments SCHULTEN, C. TSTF-075 3.3.3 CEOG 7/17/96 pkg rec'd and Delete SR 3.1.5.4 from LCO 3.3.3, Achon B2. !
assi0ned to C. Schulten. ,
10/31/96 reviewer '
recommends approval and j referral to HlCB for concurrence.
SCHULTEN, C. TSTF-076 3.3.1, 3.3.2, CEOG 7/17/96 pk0 rec'd and Remove note requiring review by sae onsite review l 3.3.5, 3.3.7, assigned to C. Schulten. committee. 10/31/96 Correct the LCO Notes by l B3.3.1, B3.3.2, 10/31/96 reviewer replacing "in accordance with Specification 5.5.1.2.e" :
B3.3.5,B3.3.7 recommends modification. with "by the onsite review commdtee." !
11/14/96 to C. Grimes for i disposition. 3/17/97 Reviewer !
reconssdered recommendation !
and instead forwarded to a l Tech Branch for review. i 3/26/97 K. Mortensen, HICB, :
was assigned to the tech review. ;
SCHULTEN, C. TSTF-081 3.3.1, B3.3.1 CEOG 7/17/96 pkg rec'd and Add note to SR 3.3.1.8 and SR 3.3.1.9 excluding assigned to C. Schulten. neutron detectors. !
10/31/96 reviewer recommends approval and referral to HICB for concurrence.
ReportPtinted 6f19/97 10
i Modified Status Report of the STS, Rev. 2, Changes Pending Travellers Chapters or NUREGs Package NRC Contact Package # LCOs ANected Affected Status Comments ;
i WESTON, M. TSTF-087, R.1 3.4.5,3.4.9, B WOG 1/23/97 Rev.1 received from Revise "RTBs open" & "CRDM de-energized" Actions to 3.4.5, B 3.4.9 TSTF and forwarded to " incapable of rod withdrawal". 3/5/97 The Owner's I reviewer. 3/5/97 Reviewer Group did not provide requested supplement to bases recommended rejection of the statement describing why chan0e is necessary, revision package. 3/17/97 to C. Grimes for disposition.
3/28/97 Hold-no further action to be taken, pending receipt of revision package from TSTF.
HARBUCK, C. TSTF-088 1.1 All OGs 7/17/96 pkg rec'd and Number of required reactor vessel head bolts.1/30/97 assigned to C. Harbuck. The current version of STS Table 1.1-1 is apphcatde to 1/30/97 reviewer most plants. Plants having the proposed provision can i~
recommended rejection. keep it upon conversion to the STS. Plants wanting the 2/4/97 to C. Grimes for provision in the future should Det NRC approval.
disposition. Reducing the number of bolts required to be tensioned should be reviewed by the NRC because of the importance of the RCS pressure boundary to safety.
WESTON, M. TSTF-092 R.1 3.9.3, 8 3.9.3, BWOG, 4/7/97 Rec *d packa0e. Revised Containment Purge and Exhaust SR to exempt ;f
^
3.9.4, B 3.9.4 WOG, 4/10/97 Forwarded to reviewer. valves that are locked, sealed or secured. ,
'i Report Printed: W19NT 11 I
Modified Status Report of the STS, Rev. 2, Changes
) Pending Travellers Chapters or NUREGs Package NRC Contac* Package # LCOs Affected Affected Status Conents 4
WESTON, M. TSTF-105 3.4.1, B3.4.1 WOG, 7/17/96 pkg rec'd and Remove the details of performing an RCS flow CEOG assigned to M. Weston. measurement. 9/20/96 TSB Comment: This is a long-9/20/96 TSB reviewer standing issue for Westinghouse. The issue is being recommends rejection; revsewed in-house NRC. All related TSTFs should be forwards to SRXB for review. held; refened to SRXB for review. 9/26/96 SRXB 9/26/96 SRXB recommends Comment The TS for RCS flow rate for DNB Limds rejection.10/5/96 to C. (SR 3.4.1.4 & Bases) was reviewed. The change
, Grimes for disposition. usually refers to an allemate means of measuring RCS flow using cold le0 elbow tap flow measurement, a method not designed for as a primary flow device. This is a generic problem not addressed as such.
TJADER, R. TSTF-110, R.1 3.1.4, 3.1.5, BWOG, 1/23/97 Revision 1 received TSTF Revised to delete "With an OPERABLE bank 3.1.6, 3.1.7, WOG and provided to R. Tjader for inserhon limit monitor," and " ensure OPERABILITY of 3.2.1, 3.2.3, review. the bank insertson limit monitor and to" from SR 3.1.7.2 3.2.3A, 3.2.38, in WOG Bases section 3.1.7. All other changes remaan 3.2.4, B 3.1.4, from first submittal.
! B 3.1.5, B
, 3.1.6, B 3.1.7, B 3.2.1, B 3.2.3, B 3.2.3A, -
B 3.2.30, B 3.2.4 SCHULTEN, C. TSTF-111 R.1 1.1, B 3.3.1, B WOG 4/7/97 Rec'd pkg. 4/10/97 Changed " measured" to "venfied" in Definitions for ESF
- 3.3.2 Forwarded to reviewer. RESPONSE TIME and RTS RESPONSE TIME, and
, revised Bases for SRs 3.3.1.16 and 3.3.2.10 to eliminate pressure sensor response time testing.
Report Printed-6ff 9/97 f2
Modified Status Report of the STS, Rev. 2, Changes Pending Travellers Chapters or NUREGs Package
~
NRC Contact Packagef LCOs Affected Affected Status Comments WESTON, M. TSTF-113 3.4.11, B3.4.11 BWOG, 8/19/96 pkg rec'd and Replace LCO 3.4.11 Actions to "Be in MODE 4" with WOG, assigned to M. Weston. -
" Initiate action to restore PORV and block valve (s) to CEOG 10/29/96 Reviewer rejeded OPERABLE status - 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />". 10/29/96 There is no and submdted to C. Grimes justification for stating " releases dunn0 a SGTR event for disposdion. are not expected below 500 degrees Fahrenheit T-avg."
The LTOP system limits should contain adequate room for maneuverability between the temp at MODE 3 and the enabiling temp. The staff does not believe the improved STS could cause op problems and could also lead to loss of miti0ation capability during SGTR event at less than 500 degrees Fahrenheit.11/5/96 to C.
Grimes for review.
WESTON, M. TSTF-116, R.1 3.4.13,3.4.15, BWOG, 4/7/97 Rec'd pk0 4/10/97 Revised RCS inventory Balance SR: Steady State B 3.4.13, B WOG, Forwarded to reviewer. Clarification.
3.4.15 CEOG TJADER, R. TSTF-119 5.4 BWOG, 1/27/97 pkg received and Revised Administrative Control 5.4.1 to delete the WOG, provided to R.Tjader for following: "d. Fire Protechon Pro 0 ram implemerdation" CEOG, review. 2/28/97 R.Tjader because it duplicates requirements already provided in BWR/4, recommended Approval. Item a. 2/28/97 Remove redundancy covered by 5.4.1a B W R/6 3/6/97 forwarded pkg to C. (RG 1.33).
Grimes for disposition.
l i
Report Ptinted: 6ff 9/97 13
i i
Modified Status Report of the STS, Rev. 2, Channes Pending Tracellers Chapters or NUREGs Package NRC Contact Package # LCOs Affected Affected Status Commenk m
TJADER, R. TSTF-120 5.5 BWOG, 1/27/97 phe received and Revise Administrative Control 5.5.13. Diersel Fuel 01. i WOG, pmvided to R. Tjader for Testing Program, reference to " ASTM D-2276, Method CEOG, review. 2/28/97 R.Tjader A-2 or A-3" to simply reference " ASTM D-2276, Method BWR/4, recomanended approval. A." for consistency with the reference to Method A in the !
B W R/6 3/6/97 forwarded pkg to C. SR 3.8.3.3 Bases. 2/28/97 More efficiency state l Grimes for disposition. reference-as stated in TS Bases for SR 3.8.3.3. 5/9/97 l Reassigned to E. Tomlinson NUREG language is necessary to allow flexitulity -see l for review. 5/9/97 reviewer versions of ASTM D02276. j recommends rejedion. . j 5/12/97 K. Parczewski, EMCB, i agrees with .ecommendation. !
5/12/97 to C. Grimes for i disposition. l t
HARBUCK,C. TSTF-124 1.0 BWOG 1/27/97 pkg received and Revise the definition of Channel Calibration to delete provided to C. Hasbuck for the sentence "The CHANNEL CAUBRATION shall also !
review. include testing of safety related Reador Protection :
System (RPS), E6v; n.mi Safety Feature Actuation System 9ESFAS), and Emergency Feedwater initiation !
and Control (EFIC) bypass fundions for each channel !
affected by the bypass operation." Revise the definition o' CHANNEL FUNCTIONAL TEST to delete the last w tence "The ESFAS CHANNEL FUNCTIONAL TEST j shall also indude tesSng of ESFAS safety related t bypass functions for each channel affeded by bypass operation."
i i
i ReportPtr'et 6f1lk97 14 j t
l
Modified Status Report of the STS, Rev. 2, Changes Pending Travellers ;
t Chapters or NUREGs Package [
NRC Contact Package # LCOs Affected Affected Status Comments j
~
r TJADER. R. TSTF-127 3.1.5, B 3.1.5 CEOG 1/27/97 pkg received and The Frequencies for SR 3.1.5.3 and SR 3.1 K 4 are provided 'o R. Tjader for being decreased from 31 to 92 days. 3/3/W7 Justifcation i review. 3/3/97 R. Tjader is not adequate;is based on rod movement SR referred to HICB. 3/26/97 K. frequency, not equipment milability.
Mortensen, HICB, was y assigned to the tech review. ;
4/17/97 TSTF intends to l
submit revision package. :
l l
l I
l i
i l
l t
l I
t I
Report Printed: W19/97 15 i
Modified Status Report of the STS, Rev. 2, Changes Pending Travellers Chapters or NUREGs Package NRC Contact Package # LCOs Affected Affected Status . Comments WESTON, M. TSTF-128 3.5.5, B 3.5.5 CEOG 1/27/97 pkg received and Delete "dodecahydrate" and "gnanular" from the provided to M. Weston for description of TSP and replace with hydrated form with review. 3/5/97 With Tech specifed moisture content. 3/5/97 the reviewer, along Branch concurrence, reviewer with EMCB, finds the TSTF should moddy their
- recommends modification. Justification to include the term "hydmted" because R is 3/17/97 to C. Grimes for important to clearly specify that a hydrated form of TSP disposition. 4/10/97 C. is used. 4/10/97 C. Grimes retumed pkg to reviewer to Grimes retumed pkg to determine whether proposed changes are acceptable reviewer. 6/11/97 Revewer without modification, since the NRC-requested attached justifichtion & modification is to the TSTFs justification staterr.ent, but comment to be included with does not address whether the changes are technically review package. 6/18/97 to acceptable. 6/11/97 Modified to include the term M. Reinhart for disposMion. " hydrated" because it is important to clearly specify that a hydrated form of TSP is used. From past experience, in many cases, hcensees did not specify which form of TSP they were using and then made the mistake in determining the required amount by esther using ahydrous instead of hydrated TSP or vice versa. The justification should be changed to:"The chemical industry defines hydrated TSP as having 45-75%
moisture content. The theoretical moisture content of TSP dodecahydrate is 55% and the theoretical moisture content of TSB decahydrate is 51%. The is for using the TSP in a hydrated form is to ensure that it will not absorts large amounts of water. The word " granular"is removed because after the TSP has been in the containmerd baskets and absorbed some moisture from the containment atmosphere, it is no longer granular, but is still capable of performing its safety function."
Report Printed: 6ff997 16
t l
Modified Status Report of the STS, Rev. 2, Changes '
Pending Travellers Chapters or NUREGs Package NRC Contact Package # LCOs Affected Affected Status Cm ,
SCHULTEN, C. TSTF-135 3.3.1, B 3.3.1, WOG 1/27/97 pkg received and Several improvements made to the RPS and ESFAS 3.3.2, B 3.32, provided to C Schulten for Instrumentation Speofications to enhance consistency 3.3.9, B 3.3.9 review. 3/17,17 referred to with standard ITS pressntation. i HlCB for review. 4/9/97 HICB responded with initial assessmerd; full review will take six weeks to complete.
TJADER, R. TSTF-141 3.1.2,8 3.1.2, BWOG, 1/27/97 package received. Delete the Mode 2 Applicability for Reactivity Balance. .
3.1.3, B 3.1.3 WOG, 2/10/97 provided to R. Tjader 3/3/07 SRXB needs to evaluate appliemhimy cnange.
CEOG, for review. 4/11/97 referred to 5/28/97 SRXB completed evaluailon and recommended -
BWR/4, SRXB via Note. 5/28/97 approval. 5/29/97 Reviewer found safety concem is in BWRM SRXB recornmended MODE 1. In order to evaluate core problem, it would be approval. 5/29/97 Reviewer desirable to remain in MODE 2--cannot do reactivity recommended approval. balance below MODE 2.
5/29/97 to C. Grimes for ,
disposition.
TJADER, R. TSTF-142 3.1.2 B 3.1.2, BWOG, 1/27/97 package rvelved. Increase the Completion Time When the Core 3.1.3, B 3.1.3 WOG, 2/10/97 provided to R. Tjader Reactivity Balance is Not Within Limit 3/3/97 SRXB ;!'
CEOG for review. 4/11/97 referred to needs to evaluate Required Action (A) CT change of 72 SRXB via Note. 5/28/97 hours to 7 days. 5/28/97 SRXB completed evaluation SRXB recommended and recommended approval. 5/29/97 Reviewer found approval. 5/29/97 Reviewer evaluating a Reactivity Anomaly could easily require recommended approval. more than 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />, particularly if vendoris required.
5/2S!97 to C. Grimes for disposition.
Report Printed: 6f1(W7 17
k 1
i Modified Status Report of the STS, Rev. 2, Changes Pending Travellers Ot.apters or NUREGs . Package NRC Contact Package # t.COs Affected Affected Status Comments GIARDINA, R. TSTF-145, R.1 3.6.3, B 3.6.3, BWOG, 4/1/97 Rec'd package. Revised to add a Required Action to verify that the !
3.6.1.3,B WOG, 4/10/97 Forwarded to affeded penetration flow path is isolated when two ;
3.6.1.3 CEOG, reviewer. 4/15/97 reviewer Containment isolation Valves are inoperable. 4/15/97 B W R/4, recommended modification. staff comments to Rev. O were not incorporated; no ;
B W R/6 4/16/97 to C. Grimes for justification provided for omission 5/2/97 NRC Rev 0 t disposdion. 5/2/97 retumed to comments do not appear to have been available !
reviewer for revision of accordmg to TSTF revision history; therefore, NRC Rev ,
comments. 6/4/97 revvwer 1 commerds should be revised to explain how the Bases !
updated comments. 6/8/97 to inserts should be revised to make Rev.1 acceptable. !
M. Reinhart for disposition.
i WESTON, M. TSTF-151 B 3.4.11 WOG 1/27/97 package received. TSTF proposes to clarify PORV Operability. PORV ,
2/11/97 provided to M. Operability is darified in the Bases. Miscellaneous l Weston for review. 3/6/97 usage clarifications are made to the Bases. An [
With recommendation from inaccurate statement in the Adion 3.4.11.E Bases is !
SRXB, reviewer recommends deleted. 3/5/97 SRXB recommends a modification to :
modification. 3/17/97 to C. the package that maintains MODE 5; changes made in i Grimes fordispositicn. Actions D.1, D.2, E.1, E.2, E.3, E.4 G.1, and G.2 are !
4/11/97 C. Grimes retumed to not acceptable since they conflict with the "Appliability" !
reviewer for a darification of in LCO 3.4.12...the LTOP is needed during MODES 3, }
the modification and SRXB's 4,5 and 6 with reador vessel head on. Do not delete t, asis for objection. 6/10/97 MODE 5; these sections now include MODES 4 and 5 ;
Reviewer darified maskup by and the change would delete MODE 5. '
un-deleting " MODES 4 and 5" in the proposed change.
6/18/97 to M. Reinhart for !
disposihon. I t
SCHULTEN, C. TSTF-161 3.3.6,3.3.7, B WOG 4/7/97 Rec'd pkO. 4/10/97 Add Applicability column to the Table to darify 3.3.6, B 3.3.7 Forwarded to reviewer. requirements for the ESFAS functions, and revise the !
Apphcability statement to refer to the Table. t
?
Report Pnnted: 6ff9/97 f6 l
l Modified Status Report of the STS, Rev. 2, Changes Pending Travellers Chapters or NUREGs Package !
NRC Contact Package # LCOs Affected Affected Status Comments WESTON, M. TSTF-182 B 3.4.9 WOG 4/7/97 Rec'd pkg. 4/10/97 Makes clear the Bases for the maximum pressurizer f Forwavded to reviewer. water levellimit. [
t TOMLINSON, E TSTF-163 3.8.1 BWOG, 4/7/97 Rec'd pkg. 4/10/97 [10]-second DG stast tests are modified to provide
. WOG, Forwarded to reviewer. minimum volt /Hz limits for [10] second acceptance & l CEOG, 4/16/97 Reviewer then detail the voll/Hz range as " steady state" ;
BWR/4, recommended rejection. acceptance criteria. 4/16/97 No corresponding Bases BWRM 5/12/97 to C. Grimes for change & industry /NRC apreement regarding trending is ;
disposition. not included. j TJADER, R. TSTF-167 5.7 BWOG, 4/7/97 Rec'd pkg. 4/10/97 Change " unauthorized" to " inadvertent" in Section 5.7.2, WOG, Forwarded to reviewer. High Radiation Area. 4/14/97 Strict controls over entry CEOG, '4/14/97 Reviewer into High Rod Area are required; inappropriate entry i BWR/4, recommended rejection. involves more than inadvertent accident (must have B W R!6 5/2/97 C. Grimes retumed to work permit, dosemetry, keys, permession). 4/14/97 to
]
reviewer to confirm change C. Grimes for disposition. 5/2/97 Determine whether !
with PERB. PERB agrees that there is a distinction between
" inadvertent" and " unauthorized" entry, relative to the [
referenced staff position in Section 1.5 of RG 8.38-also determine what is the nature of the " violations based on d misinterpretation" described in the TSTF justificahon. .j SCHULTEN, C. TSTF-168 3.3.1, B 3.3.1 WOG 4/7/97 Rec'd pkO. 4/10/97 Delete the reference to the UVTA and STA in Section Forwarded to reviewer. 3.3.1, Condition R. Note 2. g i
SCHULTEN,C. TSTF-169 3.3.1, B 3.3.1 WOG 4/7/97 Rec'd pkg. 4/10/97 Delete 3.3.1, Condition N.
~
Forwarded to reviewer.
SCHULTEN, C. TSTF-170 3.3.3(A), CEOG 4/7/97 Rec'd pkg. 4/10/97 ChanDe Sections 3.3.3(A) and 3.3.4(D) Required Adion 3.3.4(D), B Forwarded to reviewer. C.1 to allow only affected RTCBs to be opened.
3.3.3(A), 8 l 3.3.4(D)
Report Pnnted: 6f19/97 19 ,
L i
i 7
Modified Status Report of the STS, Rev. 2, Changes Pending Travellers i Chapters or NUREGs Package !
NRC Contact Package 8 -LCOs Affected Affected Status Comments r i
SCHULTEN, C. TSTF-171 3.3.1(A), B CEOG 4/7/97 Rec'd pkg. 4/10/97 Adds frequency for excore channel calibration i 3.3.1(A) Forwarded to reviewer. surveillance so that surveillance must be performed prior to puntion above 90% RTP after each fuel loadin0 l SCHULTEN, C. TSTF-172 3.1.4(A) CEOG 4/7/97 Rec'd pkO. 4/10/97 Revise SR 3.1.4.1 to verify MTC is within the upper ,
Forwarded to reviewer. timits, which may not be in the COLR. l t
GIARDINA, R. TSTF-173 B 3.7.17, B BWOG, 4/7/97 Rec'd pkg. 4/10/97 Delete incorrect Bases statement regardin0 3-131 3.7.18, B 3.7.19 WOG, Forwarded to reviewer. equilitxium. 4/17/97 proposed changes are incomplete; CEOG 4/17/97 reviewer the sentence preceding the deleted sentence should t recommended modification. also be deleted, since they both are linked and the 4/30/97 to C. Grimes for statements are not needed to support the specification.
disposition. 5/2/07 retumed to !
reviewer for recons 6deration of recommendation. 6/3/97 reviewer recommended approval. 6/6/97 to M.
Reinhart for disposition. ,
WESTON, M. TSTF-177 B 3.4.5 CEOG 4/7/97 Rec'd pkg. 4/10/97 Revise LCO 3.4.5 Bases to clarify RCP requiremerds. .
Forwarded to reviewer. ,
SCHULTEN, C. TSTF-173 3.3.1(A), CEOG 4/7/97 Rec'd pkg. 4/10/97 Remove ' trip or bypass removal" from RPS and ESFAS 3.3.4(A) Forwarded to reviewer. Action Note.' .
SCHULTEN, C. TSTF-179 3.3.1(A) CEOG 4/7/97 Rec'd pkg. 4/10/97 Replace the phrase " maximum allowed THERMAL Forwarded to reviewer. POWER level" with "RTP".
SCHULTEN, C. TSTF-180 3.3.2(A), B CEOG 4/7/97 Rec'd pkg. 4/10/97 Add " bypass removal" features to the RPS 3.3.2(A) Forwarded to reviewer. Instrumentation Shutdown LCO. ,
Report Printed: 6(1997 20
i i
Modified Status Report of the STS, Rev. 2, Changes Pending Travellers Chapters or . NUREGs Package i NRC Contact Package # LCOs Affected Affected Status Comments !
SCHULTEN, C. TSTF-181 3.3.3(A), CEOG da/97 Rec'd pkg. #10/97 Move Notes fmm Conditions to Required Actions j 3.3.4(D), B Forwanfed to reviewer.
3.3.(A), B !
3.3.4(D) j 3
SCHULTEN, C. TSTF-182 3.3.3(A), CEOG 4R/97 Rec'd pko. #10/97 Add Manual Trip to Condition for two channels of RPS l 3.3A(D), B Forwarded to reviewer. Logic and Trip initiation inoperable.
3.3.(A), B 3.3.4(D) ,
SCHULTEN, C. TSTF-183 3.3.3(A), CEOG 4R/97 Rec'd pkg. #10/97 Eliminate incorrect reference to Functions fmm RPS !
3.3.4(D),B Forwarded to reviewer. Logic and Trip initiation LCO. !
3.3.(A), B 3.3.4(D)
SCHULTEN,C. TSTF-184 3.3.7(A), B CEOG 46/97 Rec'd pk0 4/10/97 Change Required Action Reference from 3.6.3 to 3.9.3. !
3.3.7(A) Forwarded to reviewer. [
SCHULTEN, C. TSTF-185 3.3.7(A) CEOG 4/7/97 Rec'd pko. #10/97 ~ Change AND to OR in CPIS Condition B.
Forwarded to reviewer. ,
i SCHULTEN, C. TSTF-186 3.3.7(A), CEOG 46/97 Rec'd pkg. 4!10/97 Correct SRs which verify setpoints. [
3.3.8(A) Forwarded to reviewer.
SCHULTEN, C. TSTF-187 3.3.5(A), CEOG 4U/97 Rec'd pkg. 4/10/97 Add Condition for two inoperable Aduation Channels. l 3.3.9(A), Forwarded to reviewer.
3.3.6(D), B j 3.3.5(A), B ,
3.3.9(A), B !
3.3.6(D) !
Report Printed: 6f1997 21 ,
Modified Status Report of the STS, Rev. 2, Changes Pending Travellers Chapters or NUREGs Package !
NRC Contact Packagef LCOs Affected Affected Status Comments ;
l SCHULTEN, C. TSTF-188 3 3.11(A) CEOG 4/7/97 Rec'd pkg. #10/97 Delete Reference (c), which was inappropriately applied Forwarded to reviewer. to Function 13, from CST level in Table 3.3.11-1.
i SCHULTEN, C. TSTF-189 8 3.3.1(A) CEOG 4U/97 Rec'd pkg. 4/10/97 Remove discussion of the allowable value and it's l' Forwarded to reviewer. uncertainty from the Containment Pressure - High Bases. j SCHULTEN, C. TSTF-190 B 3.3.1(A), B CEOG 4/7/97 Rec'd pk0 . 4/10/97 Remove reference to inadvertently bypassing a 3.3.2(A),B Forwarded to reviewer. redundant channel. .
3.3.4(A)
SCHULTEN, C. TSTF-191 B3.3.1(A) CEOG 4/7/97 Rec'd pkg. 4/10/97 Eliminate reference to Manual Trip in Bases. I Forwarded to reviewer. ;
e SCHULTEN, C. TSTF-192 B3.3.3(A) CEOG 4/7/97 Rec'd pkg. 4/10/97 Change the phrase," . applicable to the two affected Forwarded to reviewer. RTCBs" to "... applicable to the two affected channels of j RTCBs". 4 s
WESTON, M. TSTF-195 8 3.4.6 CEOG 4/7/97 Rec'd pkg. 4/10/97 Revise 3.4.6 Action A.1 to be consistent with the i Forwarded to reviewer. Specificabon. ;
}
i l
i Report Printed: 6ft9NT 22
Modified Status Report of the STS, Rev. 2, Changes Pending Travellers Chapters or NUREGs Package I
NRC Contact Package 8 LCOs Affected Affected Status Comments t GIARDINA, R. TSTF-196 3.3.3, 3.3.8(D), BWOG, 4/7/97 Rec'd pkg. 4/10/97 Revised to allnw the use of equivalent isolation methods 3.3.11(A) & (D), WOG, Forwarded to reviewer. 4/17 for containmerd penetrations. R. Giardina (3.6) is 3.3.17,3.6.3, CEOG, Giardina rev,,r.,re ,ded primary contact; C. Schulten (3.3) and M. Weston (3.9) 3.3.3.1, 3.6.1.3, BWR/4, rejection; awaiting remaining are secondary because they have fewer sedions to
. 3.6.4.2, 3.6.5.3, BWR/6 reviewer comments. review. !
B 3.3.3, B 3.3.8(D), B ,
3.3.11(A) & (D),
B 3.3.17, B l 3.6.1(A) & (D), t B 3.6.1, B 3.6.3, B 3.9.3, B 3.9.4, B 3.3.3.1,B ;
3.6.1.1,8 3 3.6.1.3,B !
3.6.4.2,B {
3.6.5.3 WESTON, M. TSTF-197 3.9.3, 3.9.4, BWOG, 4/7/97 Rec'd pk9. 4/10/97 Replace "outside atmosphere" with *environmeni" in i 3.9.5, 3.9.6, B WOG, Forwarded to reviewer. Containment Penetrations specirmations and Bases.
3.9.3, B 3.9.4, CEOG .
B 3.9.5, B 3.9.6 l
TOMLINSON, E TSTF-198 BWOG, WOG, 3.8.6,B 4/28/97 received from TSTF. 4/28/97 Specifmation 3.8.6 is revised to allow unlimited CEOG, BWR/4, 3.8.6 4/30/97 assigned to reviewer. use of battery charging (float) current to determine the 1 i
B W R/6 5/5/97 Request for review sent state of battery charge (in lieu of specific gravity). f i to EELB. s
- i t
Report Ptirded: 6ft9NT 23
. - . - . . ~ . . - . - . - . - _ . . . - . - . _ . . . - .
t Modified Status Report of the STS, Rev. 2, Changes Pending Travellers Chapters or NUREGs Package NRC Contact Package # LCOs Affected Affected Status Comments ,
i TOMUNSON, E TSTF-199 BWOG, WOG, 3.8.4, 3.8.5, 4/28/97 received from TSTF. 4/28/97 Deletes SR 3.8.4.2, SR 3.8.4.3, SR 3.8.4.4, and .
CEOG, BWR/4, B 3.8.4 B 4/30/97 assigned to reviewer. SR 3.8.4.5 that are maintenance type SRs which do not !
B W R/6 3.8.5 5/5/97 Request forreview sent represent requirements for Operability.
to EELB.
t TOMUNSON, E TSTF-200 BWOG, WOG, 3.8.4 B 4/28/97 received from TSTF. 4/28/97 Revise SR 3.8.4.7 to omit the "once per 60 CEOG, BWR/4, 3.8.4 4/30/97 assigned to reviewer. months" limitation in order to allow use of bettery B W R/6 5/5/97 Request for review sent modified performance discharge test in lieu of service to EELB. test per IEEE-450. ,
t TOMUNSON, E TSTF-201 BWOG, WOG, 3.8.6,B 4/28/97 received from TSTF. 4/28/97 SR 3.8.6.2 is revised to omit the Frequencies of CEOG, BWR/4, 3.8.6 4/30/97 assi9ned to reviewer. "Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after a battery discharge <[110]
BWR/6 5/5/97 Request for review sent V* and "Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after a battery overcharge i to EELB. >[150] V." ,
TOMUNSON, E TSTF-202 BWOG, WOG, 3.8.4, 3.8.6, 4/28/97 received from TSTF. 4/28/97 Revise Frequency of SR 3.8.4.1 and 3.8.6.1 i CEOG, BWR/4, B 3.8.4 4/30/97 assigned to reviewer. from 7 days to 31 days. Note that no changes were l B W R/6 5/5/97 Request for review sent required to the Bases of SR 3.8.6.1.
to EELB. I; TOMUNSON, E TSTF-203 BWOG, WOG, B 3.8.6 4/28/97 received from TSTF. 4/28/97 Add Bases where none exist for STS 3.8.6 l[
CEOG, BWR/4, 4/30/97 assigned to reviewer.
5/5/97 Request for review sent ACTIONS Note. li BWR/6 ;[
to EELB. ; j.
t i
Report PHnted- 6ft9/97 24
l
~.
l -
l i
l i
Modified Status Report of the STS, Rev. 2, Changes l Travellers Modified As of 4/18197 l
l Chapters or NUREGs Package i NRC Contact Package # LCOs Affected Affected Status Cawnents TJADER, R. TSTF-176 8 3.1.4(A) CEOG 4/7/97 Rec'd pko. 4/10/97 Revise SR 3.1.4.1 and SR 3.1.4.2 Rm to include SR Forwarded to reviewer. Note. 4/14/97 Recommend modification to include ,
i 4/14/97 Rewewer editorial corrections to compliment TSTF-pmposed recommended modification. changes. 5/2/97 Addition of SR 3.1.4.1 is appropdate ;
4/15/97 Forwarded pke to C. with the corresporxlin0 editorial changes.
Grimes fordisposition. 5/2/97 !
C. Grimes modified changes. !
i l
o l
t f-J ReportPrinted. W1iW7 1 [
f
Modified Status Report of the STS, Rev. 2, Changes Travellers Approved As of 4/18/97 Chapters or NUREGs Package NRC Contact Package # LCOs Affected Affected Status Comments 1 TJADER, R. TSTF-014 R.4 3.1.10, B 3.1.10 WOG 4/7/97 Rec'd pkg. 4/10/97 Add an LCO ltem and SR to Mode 2 Physics Tests Forwarded to reviewer. Exceptions to verify that Thermal Power <= 5% RTP.
4/14/97 Reviewer 4/14/97 Adds clear upper Hmit to applicately of LCO-recommended appmval. though R is editorial (redundant to applicatety). 5/2/97 4/15/97 to C. Grimes for Marginally useful clarification of applicately.
disposition. 5/2/97 C. Grimes approved. 5/27/97 D.
Johnson created working draft
! and provided to reviewer.
! WESTON, M. TSTF-070, R.1 3.7.15, B BWOG, 4/7/97 Rec'd package. Revised to change Required Action A.2.2 from 3.7.15,3.7.16, WOG, 4/10/97 Forwarded to
- Verify... fuel storage pool verificatica has been B 3.7.16, CEOG reviewer. 4/15/97 reviewer performed. "to" Initiate action to perform. " 4/15/97 3.7.17, B 3.7.17 recommended approval. OG revised in accordance with NRC recommendations; 4/16/97 to C. Grimes for chan0es acceptable. 5/2/97 Simplified action statement disposition. 5/2/97 C. Grimes revised as requested.
approved changes. 6/10/97 D. Johnson created Working Draft and forwarded to reviewer for proofreading.
i TJADER, R. TSTF-098, R.1 3.2.18. B 3.2.18 WOG 1/23/97 Revision 1 received TSTF Revised to insert "the appropriate"in place of *a" and provided to R. Tjader for before
- Tactor"in Bases section SR 3.2.1.2. 4/2f/97 review. 4/28/97 reviewer Fq(z) limMs specified in COLR, and need not be recommended approval. specified in Bases. 5/2/97 SRXB agreed to relocation of t 4/29/97 to C. Grimes for limits to COLR.
disposition. 5/2/97 C. Grimes approved changes. 6/10/97 D. Johnson created Working Draft and forwarded to reviewer for proofreading.
a-ReportPrinted- W19t97 1 i
t i
e Modified Status Report of the STS, Rev. 2, Changes Travellers Approved As of 4/18/97 Chapters or NUREGs Package -
NRC Contact Package # LCOs Affected Affected Status Comspents i
TJADER, R. TSTF-108 R.1 3.1.10,3.4.19, WOG 1/23/97 Revision 1 received TSTF Revised to retain SR 3.1.10.1 for sedion 3.1.10 B 3.1.10 B and provided to R. Tjader for and SR 3.4.19.2 for section 3.4.19, and delete "Within ,
3.4.19 review. 4/29/97 reviewer 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />" fmm FREQUENCY in both sections. Also I recommended approval. deletes last sentence of SR 3.1.10.1 and SR 3.4.19.2 in ,
4/29/97 to C. Grimes for the respedive Bases sections. 4/29/97 Recommend '
disposition. 5/2/97 C. Grimes approval of TSTF-106, Rev 1, changing the frequency ;
approved changes. of SRs 3.1.10.1 and 3.4.19 by deleting the requirement to perform an Ni COT 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> prior to the performance of Physics Tests. The NI COT will be performed prior to entering the mode of applicability after i evolutions / maintenance have been performed that have i affeded the Nis, as normally is done coming out of an outage. As long as SR is performed prior to physics test,12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> requirement een be deleted due to scheduling problems. 5/2/97 Changes requested by TSB and SRXB incorporated.
TJADER, R. TSTF-112 R.1 3.2.3A, B 3.2.3A WOG 1/23/97 Revision 1 received TSTF Revised to only delete NOTE. 4/29/97 The note and provided to R. Tjader for to Condition D has been removed, deleting an review. 4/29/97 Reviewer unnecessary action to continue to reduce power once recommended approval. the LCO Conditions or Required Actions have been 4/29/97 to C. Grimes for met. No safety margin is gained by unnecessarily disposition. 5/2/97 C. Grimes requiring a redudion in power to below 15% RTP.
approved chan0es.
ReportPrinted- W1987 2
Modified Status Report of the STS, Rev. 2, Changes Travellers Approved As of 4/18197 Chapters or NUREGs Package NRC Contact Package # LCOs Affected Affected Status Comments TJADER, R. TSTF-136 3.0, 3.1.1, WOG, 1/27/97 pkg received. 2/10/97 TSTF proposes combining LCO 3.1.1 and 3.1.2. R.
3.1.2, 3.1.3, CEOG pkg divided and provided to Tjader is assioned primary contact; Gilles, SchuRen, 3.1.4, 3.1.5, respective contacts for and Weston are secondary because they have furew i 3.1.6, 3.1.7, review. 3/5 Tjader sectkms to review. 3/5/97 Tjader recommends rejecting 3.1.8. 3.1.9, recommends rejection of his comtining two SDM TSs for plants that have COLRs l 3.1.10,3.1.11, respective sections (3.1 & (plants that do not have a COLR will have two SDM TS: ,
3.2, 3.3, 3.2). 3/6/97 Weston if combining the two SDM TSs, then should also include B3.1.1, B3.1.2, recommends rejection of her Reviewer's Note that informs plants without COLRs that :
B 3.1.3, B respective sections (3.4 & they will need two SDM TSs; and R is not cost-beneficial 3.1.4, B 3.1.5, 3.9). 3/11/97 Schulten to incorporate this change. 3/6/97 Weston recommends B 3.1.6, B recommends rejection of his rejection based on Tjaders review (changes to 3.4 are !
3.1.7, B 3.1.8, respective section (3.3). only number changes resuRing from changes to 3.1 and B 3.1.9, B 3/27/97 Gilles recommends 3.2). 3/11/97 SchuMen recommends rejection because ,
3.1.10, B rejection of her respective changes are based on TSTF-67 which was rejected.
3.1.11, 8 section (3.0). 3/27/97 to C. 3/27/97 Gilles recommends rejection based on Tjader's i 3.2.1 8. B 3.2.2, Grimes for disposition. comments. 4/11/97 C. Grimas retumed the package to B 3.2.4, B 4/11/97 Pkg retumed to RTjader with recommendation to discuss the need for 3.3.1, B 3.4.1, RTjader for furtherinfo the changes with CEOG during an upceiri;..u meeting.
B 3.4.2, B 3.9.1 gathering from CEOG. 4/22/97 Recommend approval of TSTF-136 combining ;
4/22/97 R. Tjader two SDM TS, which is a resut of moving SDM limits to recommended approval. COLR (two TS become identical). Since most plants 4/30/97 to C. Grimes for utilize a COLR, and all of those having converted and disposition. 5/2/97 C. Grimes intending to convert to date have COLR's, it is desirable approved changes. and cost effective to adopt TSTF-136. This will be !
liiwipuimed as all other references to a COLR, without a reviwer's note. 5/2/97 Simplification relies on general !
references to COLR.
4 ReportPnnted. 6f19N7 3 i
I
- .__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ - _ _ _ - _ - _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -__________-_____l
1 Modified Status Report of the STS, Rev. 2, Changes Travellers Approved As of 4/18/97 Chapters or NUREGs Package NRC Contact Package # LCOs Affected Affected Status Comments l >
GIARDINA, R. TSTF-139, R.1 B 3.7.7, B BWOG, 4/7/97 Rec'd pkg & forwarded Revised to denote that the Fuel Storage Pool Water l 1 3.7.8 B 3.7.14 WOG, to reviewer. 4/15/97 reviewer Level satisfies Cdteria 2 and 3. 4/15/97 OG revised to l B 3.7.15 B CEOG, recommended approval. Include all OGs. 5/2/97 Clarlfles applicability of criteria.
3.7.16 BWR/4, 4/18/97 to C. Grimes for B W R/6 disposition. 5/2/97 C. Grimes approved changes.
GlARDINA, R. TSTF-140 3.7.6, B 3.7.6 BWOG, 4/7/97 Rec'd pkg. 4/10/97 Corred Condensate Storage Tank LCO and Criteria.
WOG, Forwarded to reviewer. 4/15/97 Chan0e makes CST consistent with other Tank CEOG 4/15/97 reviewer Specs; criteria change makes bases consistent with spilt recommended approval. report. 5/2/97 Simplifies CST LCO, but volume will 4/16/97 to C. Grimes for have to be ' relocated".
disposition. 5/2/97 C. Grimes
~
approved changes.
TJADER, R. TSTF-164 3.2.3A, B 3.2.3A WOG 4/7/97 Rec'd pkg. 4/10/97 Colled 3 LCO Notes and one Applicability Note into one Forwarded to reviewer. " Notes" list in the LCO. 4/14/97 Notes are all applicable 4/14/97 Reviewer to LCO (one is currently out of place under recommended approval. apphcability)-more presentable (user friendly) to have 4/15/97 to C. Grimes for notes grouped together. 5/2/97 S6mplification will disposition. 5/2/97 C. Grimes enhance readability.
approved changes.
t ReportPnnted. 6ff9/97 4
Modified Status Rcport of the STS, Rev. 2, Changes Travellers Approved As of N18/97 Chapters or NUREGs Package NRC Contact Package # LCOs Affected Affected Status Comments ,
- GILLES, N. TSTF-165 B 3.0 BWOG, 4/7/97 Rec'd pkg. 4/10/97 Revise the LCO 3.0.5 Bases to refer to Testing and not ;
WOG, Forwarded to reviewer. SRs. 4/11/97 The change in the Bases of LCO 3.0.5 CEOG, 4/11/97 reviewer recommends from use of the term "SRs" to use of the term " testing" !
BWR/4, approval. 4/16/97 to C. accomplishes two goals. First, it makes the Bases ,
B W R/6 Grimesfordisposition. 5/2/97 terminology consistent with the LCO terminolo0Y. ;
C. Grimes approved changes. Second, it provides more clarity with re0ard to the intent of LCO 3.0.5 in that the provisions apply to any testing required to demonstrate operability (e.g., post-maintenance testing), not just testing required by SRs. ;
5/2/97 Impmves consistant use of termmology.
l GILLES, N. TSTF-166 3.0 BWOG, 4/7/97 Rec'd pkg. 4/10/97 Corrects inconsistency between LCO 3.0/6 and the WOG, Forwarded to reviewer. SFDP regarding Performance of an evaluation. 4/15,17 i CEOG, 4/16/97 reviewer Change provides needed clarification to LCO 3.0.6 to BWR/4, recommended approval. explicitly state that an evaluation shall be performed in B W R/6 4/16/97 to C. Grimes for accordance with the SFDP and removes the ambiguous disposition. 5/2/97 C. Grimes language that " additional evaluations and limitations !
approved changes. may be required." 5/2/97 Avoids unintended ambiguity i of the purpose of SFDP.
l GIARDINA, R. TSTF-174 8 3.7.6 BWOG, 4/7/97 Rec'd pkg. 4/10/97 Add discussion to 3.7.6 Bases for Actions A.1 and A.2.
WOG, Forwarded to reviewer. 4/15/97 Changes make bases consisterd with ACTIONS !
CEOG 4/16/97 reviewer A.1 and A.2; provides explanation of 12 hour1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> verifk:ation I recommended approval and completion time. 5/2/97 Useful correction of the AFW forwarded to C. Grimes for backup water st'urce action.
disposition. 5/2/97 C. Grimes approved changes.
i l
[
r Report Pnnted 6ffh97 5 ,
1 Modified Status Report of the STS, Rev. 2, Changes Travellers Approved As of 4/18/97 Chapters or NUREGs Package
, NRC Contact Package # LCOs Affected Affected Status Comments i
GIARDINA, R. TSTF-175 B 3.7.8 CEOG 4/7/97 Rec'd pkg. 4/10/97 Delete incorrect Bases discussion fmm 3.7.8, Action B.
Forwarded to reviewer. 4/15/97 Change make CE STS consistent with W &
4/16/97 reviewer B&W STS. 5/2/97 Corrects 1432 to be consisterd with !
, recommended approval and the action statement.
forwarded to C. Grimes. !
5/2/97 C. Grimes approved lt chanDes.
l TJADER, R. TSTF-193 3.1.5(A), B CEOG 4/7/97 Rec'd pkg. 4/10/97 Revise CE Analog CEA Position Indication Verification.
3.1.5(A) Forwarded to reviewer. 4/17/97 SR on Position Indication does not correlate !
4/17/97 reviewer directly with LCO and required actions: no LCO for ;
recommended approval. Position Indication-no SR. 5/2/97 Simplify SR 4/30/97 to C. Grimes for construction.
disposition. 5/2/97 C. Grimes ,
approved changes. j TJADER, R. TSTF-194 3.1.8(A), CEOG 4/7/97 Rec'd pkg. 4/10/97 Add shutdown CEAs to the SDM Special Test ;
3.1.9(D). B Forwarded to reviewer. 5/1/97 Exception. 5/1/97 Rod movemerd outside insertion 3.1.8(A), B reviewer recommended limits is required for rod worth tests. 5/6/97 Corrects l 3.1.9(D) approval. 5/5/97 to C. Grimes scope of LCO 3.1.8. l for disposition. 5/B/97 C. !
Grimes approved changes.
t t
i i
6 I
t ReportPrinted- 6f19/97 6 l
t I
._____ ____ __________-_____-_ - _______ _ __________-_--______-__ _ _--_f
t
-a> t l
i Modified Status Report of the STS, Rev. 2, Changes Travellers Withdrawn As of 4/18/97 l
Chapters or NUREGs Package NRC Contact Package # LCOs Affected Anected Status Comments ;
WESTON, M. TSTF-093, R.1 3.4.9, B 3.4.9 WOG, 1/23/97 Revision 1 received TSTF Revised to slightly change Reviewers Note as :
CEOG and provkied to M. Weston for follows: "The frequency.. [ dependent] depending on l l review. 3/5/97 Reviewer whether dedicated [ Safety Related] safety-related l recommended rejecting heaters. For dedicated safety-related hesters, which do t
- package. 3/17/97 to C. not normally operate, ... applied. For non. dedicated i Grimes for disposdion. 3/28/97 safety-related heaters, which [are] normally [in]
Hold-no further action to be operat[ionje, . applied." whets those words in brackets taken, pending receipt of were struck. 3/5/97 Reviewer found that the TSTF revision package from TSTF. made editorial changes, but did not address the I
5/13/97 C. Grimes recommendation that Note be placed in SR.
dispositioned this packa0e.
WESTON, M. TSTF-113. R.1 3.4.11, B 3.4.11 BWOG, 1/23/97 Revision 1 received TSTF Appealed to revise Insert B54 slightly to correct .
WOG, and provided to M. Weston for typos; make " valve (s)" singular for BWOG; valve (s) are l CEOG review. 3/5/97 reviewer plural for CEOG. Revised inwert BS5a to change recommends rejection. " continued" to " continue". Insert BS5b changed as
- 3/17/97 to C. Grimes for follows: " additional... restore the inoperable [olock] i disposition. 3/28/97 Hold-no valve (s)... status. This will... OPERABLE PORVs and [
further action to be taken, block valves 5000F." 3/5/97 reviewer finds that the l pending receipt of revision Ownes's Group made editorial changes, but did not I package from TSTF. 5/13/97 address the technscal issue raised; recommend rejedion l C. Grimes dispostioned this based on technical ment, not editorial comments. l package. l TOMLINSON, E TSTF-115 3.8.4, 3.8.5, All OGs 9/3/96 pk0 rec'd and assi0ned Change request to give the option of determir.ing a i 3.8.6, 5.5, B to E. Tomlinson/B. Tjader. bettery's state of charge by measuring specific gravity ;
3.8.4, B 3.8.5, 9/12/96 memo to EELB or float curmnt. The change also relocates several f B 3.8.6 requesting review. 4/28/97 Surveellances and Surveillance details to a " Battery f withdrawn by TSTF. Inspection Program,* which is added to Section 5.0. [
Several other changes, consistent with IEEE-450-1995, are also proposed. 4/28/97 TSTF withdrew and !
replaced with TSTF-198, -199, -200, -201, and -203. !
ReportFWnted- 6/19N7 1 l
[
L h
d 1 C f
I i i t l
l Modified Status Report of the STS, Rev. 2, Changes Travellers Withdrawn As of 4/18197 Chapters or NUREGs Package t
NRC Contact Package # LCOs Affected Affected Status Comments ;
i WESTON, M. TSTF-155 3.5.1, B 3.5.1 BWOG, 1/27/97 package received. TSTF proposes change to 3.5.1 Core Flood Tanks -
WOG, 2/12/97 provided to M. deletion of Condition D and modification of Conddion l CEOG Weston for review. 2/28/97 C. 2/28/97 SRXB notes the chan0es are not acceptable !
SRXB recommends rejection. because when two or more accumulators are ,
32/97 Reviewer recommends inoperable, the plard is in a conddion outsede its design '
rejection. 3/17/97 to C. basis; therefore, LCO 3.0.3 must be entered l Grimes for disposition. immediately...the proposed changes will move the j 3/28/97 Hold-no further action requirement of immediate reactor shutdown from the
- to be taken, pending receipt of TS, which is not acceptable to the staff. j reymon package from TSTF. a 5/13/97 C. Grimes l dispositioned this packa08 !
I TJADER, R. TSTF-156 3.1.9, B 3.1.9 BWOG 1/27/97 package received. Modify LCO 3.1.9.c to remove the words " source range ,
2/12/97 provided to R. Tjader and intermediate ran08" forreview. 3/28/97 Hold-no further action to be taken, ,
pending receipt of revision j package from TSTF. 5/13/97 C. Grimes dispositioned this [
packa00- i GIARDINA, R. TSTF-157 3.7.5, B 3.7.5 BWOG, 1/27/97 package received. EFW SR 3.7.5.5 unnecessarily duplicates SR 3.7.5.1 CEOG 2/12/97 provided to R. and the controls for' locked valves" and is deleted. ;
Giardina for review. 3/28/97 [
Hold-no further action to be 1 taken, pendin0 receipt of l revision package from TSTF. !
5/13/97 C. Grimes -
I disposdiotted this package.
Report Printed: 6fffiNT 2
- T 0 i
Modified Status Report of the STS, Rev. 2, Changes Travellers Withdrawn As of 4/18/97 l
Chapters or NUREGa Package i NRC Contact Package # LCOs Affected Affected Status Comments ;
t TJADER, R. TSTF-158 3.1.5, B 3.1.5 BWOG 1/2747 package received. Delete Required Adion A.1 and associated Completion !
2/12/97 provided to R. Tjader 11me from Specification 3.1.5 Actions.
for review. 3/28/97 Hold-no i further action to be taken, pending receipt of revision ,
package from TSTF. 5/13/97 .
C. Grimes dispostioned this packtge.
TJADER, R. TSTF-159 3.1.6, B 3.1.6 BWOG 1/27/97 package received. Modify Applicability of LCO 3.1.6 to specify MODES 1 2/12/97 provided to R. Tjader and 2. Remove additional specified conddion wording i for review. 3/28/97 Hold-no of "when the APSRs are not fully withdrawn." !
further action to be taken, i pending receipt of revisson )
- package from TSTF. 5!13/97 i C. Grimes dispositioned this package. .
t i TJADER, R. TSTF-160 3.1.4, 3.1.8, BWOG 1/27/97 package received. LCO 3.2.5, " Power Peaking Factors" Applicability 3.2.1,3.2.2, 2/12/97 provided to R.Tjader change to MODE 1 with THERMAL POWER > 20% i 3.2.5, B 3.1.4, for review. 3/28/97 Hold-no RTP.
B 3.1.8, B further action to be taken, !
3.2.1, B 3.2.2, pending receipt of revision B 3.2.5 package from TSTF. 5/13/97 ;
C. Grimes dispostioned this l, Packa08. l t
I I
t i _
i l Report Printed: WfQNT 3
l 1
Editorial Changes to the improved STS, Rev 2
, NUREGs i NRC Contact Package # Affected Package Status Comment Disposition l
l SCHULTEN, C. EDIT-001 WOG 10/2/95 C. Schulten noted need for edRodel Change fmm operable to inoperable. Appmved chan0s. 10/18/95 C. Grimes approved edModal change. 10/31/95 TSTF appmved edMorial
. change. 2/5/96 change prnm=1 and C.
Schulten proofed e:hanges. 216/96 changes certified, contnrol books and database updated.
2/a/96 BBS updated.
GIARDINA R. EDIT-002 WOG 10/2/95 R. Giardina noted format change. Format change. Approved .
10/18/95 C. Grimes approved edRodal change.
10/31/95 TSTF approved editodel change. '
2/1/96 change processed and R. Giardina proofed change. 2/5/96 Change certified, control oooks and database updateo. 2/9/96 BBS updated.
TJADER, R. EDIT-003 WOG 10/2/95 R. Tjader noted ing,HM actonym. Correct acmnym. Appmved 10/18/95 C. Grimes approved eddorfat change.
10/31/95 TSTF approved editorial change.
2/5/96 change pmcessed and R. Tjader proofed change. Change certified, and control books and .
database updated. 2/9/96 BBS updated. 2/22/96 letter to NEl prepared.
ReportPnnted. 6ft997
- Page1
. __.m.._______ . . _ . . . . _ . _ . _ . . _ . _ -_._ _ _._. - .._ _ < - . . . _ _ . _ . . . _ _ _ - . _ . _ _ . .
.i i
Editorial Changes to the improved STS, Rev 2 j NUREGs NRC Contact *ackage8 Affected Package Status Comment Disposition ;
i GIARDINA, R. EDIT-004 BWR/4 10/2/95 R. Lobel, Tech Br noted incorrrect Correct references. Approved >
references and referred to R. Giardina. 10/18/95 C. Grimes approved editorial chan0es. 10/31/95 ,
TSTF appmved editorial changes. 2/1/96 ;
changes pmcessed and R. Gsavdma proofed l changes. 2/21/96 changes certdied, cordrol l books and database updated. 2/21/96 BBS l updated. i
?
GIARDINA, R. EDIT-005 BWR16 10/2/95 R. Lobel noted incorrect references and Correct reference. Appmved ;
referred to R. Giardina. 10/18/95 C. Grimes j approved editorial change. 10/31/95 TSTF -
approved editorial change. 2/1/96 change . l processed R. Giardina proofed changes. [
2/21/96 changes certified, control books, !
database, and BBS updated.
TJADER, R. EDIT-006 CEOG 2/5/96 R. Tjader noted editorial change, Editorial change to correct CEOc B3.7.17 Appmved i confirmed change to be made. 3/26/96 to C. Actions 1 A.1, A.2, and A.3 neer A to be !
Grimes to review. 4/11/97 C. Grimes approved renumbered in accordance wit' CEOG changes. 3.7.17, Actions A.1, A.2.1, an , A.2.2. .
i R: port Printed: 6(19/97 Page 2 i
__.__-_.m___.-___.-.-_ _ __ __._____m_. _ _ _ _ _ _
- = . - . . . - _ - . -
Editorial Changes to the improved STS, Rev 2 NUREGs NRC Contact Packagef Arrected Package Status Comment Disposition HARBUCK,C. EDIT-007 WOG 2/5/96 C. Hartmck noted editorial change, Editorial change to convert WOG 3.3.1 Approved confwmed change to be made. 6/25/96 to C. page 3.3-21, where: "P is the nominal RCS Grimes to review. 4/11/97 C. Grimes approvad operating pressure, less than or equal to changes. [2235] psiO" should have read "... greaten than or equal to [2235] psi 0."
SCHUt. TEN, C. EDIT-006 BWR/S 2/5/96 C. Schulten noted editorial change and Editorial change to conect required Approved confirmed change. 6/19/96 to C. Grimes to channels per trip system, item e., Main review. #11/97 D. Johnson appmved changes. Steam Tunnel Temperature-High.
correded from [8] to [2]. #11/97 During a meeting between C. Grimes and D.
Johnson, C. Grimes gave D. Johnson authority to disposnion editorial travelers.
Changes to optional numbers were approved.
SCHULTEN, C. EDIT-009 WOG 06/17/96 Rec'd NEl TSTF changes and assigned Editorial changes do not meet the Rejected to C. Schulten. 10/31/96 Reviewer modifed and threshold for the generic change process, submitted to C. Grimes for disposition. 4/11/97 but may be handled as minor editorial i C. Grimes rejected chan0es. 4/17/97 Rejechon changes. 10/31/96 Proposed changes to pke was retumed to TSTF. LCO 3.5.2 Apphcatnhty Notes do nd constitute editorial changes and terefore are rejected. All other EDIT-009 changes are accepted. 4/11/97 Proposed change !
package is complex and does not contain simple edits.
Report Printed: 6f1987 Page 3
Editorial Changes to the improved STS, Rev 2 NUREGs NRC Contact Packages Affected Package Status Comment Disposition SCHULTEN, C. EDIT-010 WOG 6/17/96 Editorial changes received fmm NEI and Editorial changes do not meet the Rejected assigned to reviewer. 10/31/96 Reviewer threshold for the genedc change process, recommended modification and sutxrutted to C. but may be handled as minor editodel Grimes for disposition. #11/97 C. Grimes changes.10/31/96 Proposed changes to rejeded proposed changes. #17/97 Rejection LCO 3.5.2 Applicatukty Notes do not pkg was returned to TSTF. constitute editodal changes and therefore are rejected. All other EDIT-010 changes are accepted. #11/97 Not simple edits.
TJADER, R. EDIT-011 CEOG 6/17/96 Rec'd NEl TSTF changes and assigned Editorial changes do not meet the Appmved to R. Tjader. 6/17 changes approved by reviewer threshold for the genedc change pecess, and pkg to C. Grimes for review. #11/97 C. but may be handled as minor editodal Gdmes approved changes. changes.
DUNNING, T. EDIT-012 BWOG 7/18/96 Rec'd NEl TSTF changes and assigned Editorial changes do not meet the Arproved to T. Dunning 7/18/96 Reviewer recommended threshold for the genedc chan0e pmcess, modification. 4/11/97 C. Grimes approved but may be handled as mmor editorial changes. changes. 7/18/96 Page 3.0-3 Defines acronym SFDP; is not used, so should not be defined. Page 3.0-14 does not capitalize"s"in MODES and should.
- 11/97 include "(SFDP)" on pape 3.0-3 because the title is a direct quote and this is included in the title.
i Report Printed: 6f1W97 Ptnge 4
Editorial Changes to the improved STS, Rev 2 NUREGs i NRC Contact Package 8 Affected Package Status Comment Disposition i
TJADER, R. EDIT-013 CEOG 8/19/96 Rec'd NEl TSTF dianges and assioned Editadal chanDes do not meet the Appmved to R. Tjader. 8/21 Reviewer approved changes. threshold for the genedc change process, 8/22 to C. Grimes for revsew. 4/11/97 C. Grimes but may be handled as minor editorial approved changes. changes.
SCHULTEN, C. EDIT-014 BWR16 2/4/97 C. Schulten approved the editodal 2/4/97 SR 3.9.2.2 contains a typographical Approved change. 2/4/97 to C. Grimes fordesposshon. error as follows: "Therefore, SR 3.9.2.1 "
4/11/97 D. Johnson approved. should be Therefore, SR 3.9.2.2 "
4/11/97 During a meeting between C.
Gdtnes and D. Johnson, C. Grimes gave D. Johnson authodty to desposition editodal travelers.
REARDON, M. EDIT-015 BWOG 2/4/97 N. Gilles recommends approval. 2/4/97 to 2/4/97 to correct capitalizing of Mode and Approved C. Grimes for disposition. 4/11/97 D. Johnson Modes in BWOG 3.0. 4/11/97 Dudng a approved. meeting between C. Gdmes and D.
Johnson, C. Grimes gave D. Johnson authority to disposition editorial travelers.
i i
I Report Prirsted: 6f1997 Page3 i,
_ _ _ _ _ _ _ _ _ _ _ _ ____ _ _ _ _______ _ __ __ _ _________ _ _ _ _ _________________ _______ _ _ _ _ __ ___ _ _ _ _ _ _ _ _ _ _ _ _ _ _________________I
_ _ _ _ _ _ _ _ _ . ~ . _ . _ _ _ . . _ . . _ _ . . . _ _ - _ - - _ . - - . _ _ _ . . . . _ _ _ . _ _ _ _ _ _ _ . . . . _ . .
l i
i Editorial Changes to the improved STS, Rev 2 i
NUREGs NRC Contact Package # Affected Package Status Comment Disposition i
HARBUCK,C. EDIT-016 WOG 12/12/95 date of original input ty NEl. 2/4/97 WOG Sections 1.1, 3.3.1, 3.3.2, 3.3.6, Rejected !
retumed to C. Hart >uck for review. 2/6/97 3.3.7,3.3.8 B 3.3.1, B 3.3.2 B 3.3.5, B Reviewer recommended modification. 2/13/97 to 3.3.6, B 3.3.7, & B 3.3.8 are to be changed i C. Grimes for disposition. 4/11/97 C. Grimes to clarify the scope of a TRIP ACTUATING rejected. 4/17/97 Rejection pkg was retumed to DEVICE OPERATIONAL TEST (TADOT) ~ j TSTF. by revising the defindhon to establish a
- distinction between a TADOT and a !
CHANNEL CALIBRATION and/or CHANNEL OPERATIONAL TEST. 2/6/97 [
Reviewer comments condensed here, full j comments are filed with traveller package: ,
Instead of replacing the two TADOT l surveillance requirements that requwe l setpoint verification with a Channel l Calibration and a COT, suggest keeping the TADOT (but with the revised definition) [
in both cases. The setpoint verification l requirement is adequately addressed by !
the existing 18-month Channel Calibrahon !
requirement in one case, and by adding ;
the 3-month COT requirement in the other j case. 4/11/97 C. Grimes rejected because ;
changes involve much more than simple !
editorial changes. If TSTF wishes to ;
pursue removal of setpomts from the l TADOT, these changes should be included, with appropriate justifK:stion, in f the set of pmposed changes resulting from ;
the resolution of the CFT definition. !
r Report Phinted: 6ff9/97 Page 6 1
{
f
t t
Editorial Changes to the improved STS, Rev 2 '
l NUREGs :
NRC Contact Package # Affected Package Status Comment Dispaanut !
WESTON (3.4 EDIT-017 WOG 4/7/97 Rec'd pkg. 4/10/97 Forwarded to WOG 3.4.16: Insert " specific activity" after Pending
&3.9),
reviewer. 4/15/97 RGiardma recommended "I-131"in CONDITIONS for ACTIONS A GIARDINA appmval; awaiting recommendahon fmm and C, and after"I-131"in REQUIRED ;
(3.6) Weston. 6/10/97 M. Weston recommended ACTION A.1 and A.2; move rejechon. 6/18PJ7 to M. Reinhart fordisposition. COMPLETION TIME to align with REQUIRED ACTIONS A.1 and A.2; and [
delete "of the reador coolard not within i limit." and replace with mathmatical i equation.
- WOG 3.9.1: Insert "the"in between "specified in" and "COLR." in SR 3.9.1.1. :
WOG B 3.6.3: replace " airlock"with !
" isolation valve" in the 4th paragraph of BASES ACTIONS. 4/15/97 (Giardina) :
Makes WOG consistent with B&W !
wording; other OG have slightly differerd !
wording for same Note-proposed wording !
is corred. 6/10/97 (Weston) Changes are i not editorial (fennst changes are l acceptable). No reasons given for adding l
" specific activity" to condition or adding l equation instead of"within limits." Generic.
i f
l t
}
i i
ReportPrintet 6f1997 Page 7 {
t
[
T
" ~
M.R.s b. * -
^
, t ! ,
l . .
l l .
Editorial Changes to the improved STS, Rev 2 NUREGs NRC Contact Package 8 Affected Package Status commerm Disposition
' t tiSTON EDIT-018 CEGG 4/7/97 Rec'd pkO. 4/10/97 Forwarded to CEOG 3.9.C: replace "untatchmg of Pending (3.9), reviewer. 4/14/97 R. Tjader recommended ' control rod" drive shafts," with "unistchire GIARDINA approval. 4/15/! ' R. Giardina recommended of "CEA" drive shafts," in (3.6&3.7), modification; awaiting recommendation f.am APPLICABIL7. Y. 6/10/97 M.Weston TJADER (5.5) MWeston. 6/10/97 M. Weston recommended recommends approval.
approval. 6/18/97 to M. Reinhart for disposition.
CEOG B 3.6.6A-in BACKGROUND,2nd paragraph under Containment Spray System, replace "The Containment spray System provides a spray... pressure and tunperature and to " reduce" the concentrr%n of. " with "The ContainmerW spray Tm - provides a spray . pressure and temp M and to " minimize" the concentra m sf. " and delete " typically" from the last paragraph of LCO. 4/15/97 R. Giardina - The OG proposes to replace the phrase "..10 reduce the concentrch of fission products. "with "..10 minimize the concentration of fission products. "
This is characterized as a.1 editorial co Tection, and it would also apply to NUREG-1430 (B&W) B 3.6.6 and NUREG 1431 (W) B 3.6.6.A, not just to the CE STS as Stated in the package. Insuffx: lent justification is pmvided in the change package to determine if this is an editorial change or a technical change. However, based on the first paragraph in B 3.6.6.A.
BACKGROUND,which discusses reduction of fission release with regard to system desi0n and GDC 41, the staff Report Pnnted: Winn7 Page 8
i Editorial Changes to the improved STS, Rev 2 t
NUREOs NRC Contact Package # Affected Package Status Comment Disposition
{
_ w views the change as technical. To i mimmize would mean that, for all !
situations, a specific limit would be obtained. However, the Containment Spray System in the specification is beina used to remove lodine and fission products i from the containment atmosphere followmg a LOCA. Thus, the system was !
designed to meet GDC 41 " Containment Atmosphere Cleanup" which states that
" systems to control fission products. which ,
may be released intot he reactor containment shall be provided to reduce...the concentration and quality of the fission products released to the environraent..." The amount of reduction based on the GDC would vary dependmg i on the conditions lwht the DBA being the limiti~= condition. Thus, based on GDC 41, "redace the concentration of fission ;
products
- is the cosmet terminology that should be used, for als general statement Therefore, the change to B ;
3.6.6.A BACKGROUND is rejected. The delehon of " typically"imm the last paragraph in the LCO section is acceptable. The LCO section describes what constitutes an OPERABLE system, i' and therefore should be specific. Theus,
- typically" need not be included. However, this c^ange also applies to NUREGs-1430 (B&W) B 3.6.6 LCO,-1431 (W) B 3.6.6.
t ReportPrinted- 6f16.97 Page 9
Ed!nrial Changes to the improved STS, Rev 2 NUREGs NRC Contact Package 5 Affected Package Status Comment C40-r, LCO and B 3.6.6.B LCO, and -1432 (CE) B 3.6.6. LCO. ,
CEOG B 3.7.1: Insert "be" after *20% of the valves"in the 2nd paragraph of SURVEILLANCE REQUIREMENTS SR 3.7.1.1. 4/15/97 R. Giardina - The editorial correction would make NUREGs-1431 (W) and -1432 (CE) consistent. .
However, chan0ing the "and"in the sentence to "With" would make NUREGs-1430 (B&W) and-1432 (CE) consistent Either version-NUREG-1430 ("With") or NUREG-1431 ("be")-is acceptable, but it should be consistent between all OGs. !
Make the wording consistent for all PWR i OGs STS.
CEOG B 3.9.6: replace " control rod" with "CEA"in the first sentence of APPLICABILITY. 6/10/97 M. Weston recommends appmval.
CEOG 5.5: delete "s" from " Functions" in the title for section 5.5.15. 4/t <S7 R.
Tjader: These changes are valid editorial changes.
ReportPrinted 6ft9&T Page 10
Editorial Changes to the Improved STS, Rev 2 NUREGs NRC Contact Packagef Affected Package Status Comment Disposition TJADER R. EDIT-019 3.1.3, B 3.1.3 T 'Noning submitted propued changes and pkG References to SR 3.3.2.1.8 in Required Approved v-- .7ssigned to R. Tjader. 2AW96 R. Tjader Adions A.1 and C.1 were chan0ed to SR nr .orne xied approval. 4/11/97 C. Grimes 3.3.2.1.9 to refied consistency of BWR4 approved. plants. ,
i i
!i s i i
V' **. 9# M
= - , rintt 41HT Page 11 W-__- - - . . _ _ . . . _ _ , - . - -- - - - - - - -