APR i 0 BB6

. Alabama Power Company ATTN: Mr. R. P. Mcdonald Senior Vice Presiden't P. O. Box 2641-

. Birmingham, AL 35291 Gentlemen:

SUBJECT:

DOCKET'NOS. 50-348 AND 50-364 As part of the NRC Confirmatory Measurements Program, liquid samples spiked with radionuclides will be.sent to the Farley facility for radiochemical analyses.

These samples are to be analyzed for tritium, iron-55, strontium-89, and strontium-90 in accordance with your approved procedures for analysis of liquid waste samples.

If routine analyses of this type are normally performed by a vendor, this vendor should be used to analyze the spiked samples.

The spiked samples, with instructions, will be sent under separate cover from the Department of Energy's Radiological and Environmental Sciences Laboratory, within approxi-mately 30 days.

We request that the analyses be completed as soon as practicable, but not later than 60 days f rom. receipt of the samples.

Results should be sent to:

U. S. Nuclear Regulatory Commission, Attn:

Mr. P. G. Stoddart. Our evaluation

-of your results will be discussed with your staff and transmitted in a letter.

Spiked samples will be sent to you on an annual basis as part of our routine inspection program.

If you have any questions regarding this program, please contact Mr. Stoddart by telephone at (404) 331-5621.

Sincerely, Vincent W. Panciera, Chief Reactor. Projects Branch 2 Division of Reactor Projects cc:/W.O.Whitt, Executive Vice President

/J.D.Woodard,GeneralManager-d.NuclearPlant G. Hairston, III, General Manager - Nuclear Support yJ.W.McGowan, Manager-SafetyAudit and Engineering Review VJ. K. Osterholtz, Supervisor-Safety Audit and Engineering Review

/W.R.Bayne,Chemistryand Environmental Supervisor bec: (See page 2) 8604220360 860410 PDR ADOCK 05000348 P

PDR Q

l y\\

1Eol

.S Alabama Power Company 2

bec: VNRC Resident Inspector E. Reeves, Project Manager, NRR v;JocumentControlDesk