ML20141C991

From kanterella
Jump to navigation Jump to search
Confirms 860410 Meeting to Discuss Issues W/Project Managers in BWR Project Directorate 2.Meeting Location Changed to Holiday Inn,Bethesda,Md.Names of Attendees Should Be Provided to NRC by 860404.Agenda Encl
ML20141C991
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 03/25/1986
From: Muller D
Office of Nuclear Reactor Regulation
To: Bauer E
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
References
NUDOCS 8604070366
Download: ML20141C991 (3)


Text

,

Docket No.: 50-277/278 DISTRIBUTION EN' PDR/LPDR Mr. Edward G. Bauer, Jr.

M 2 51986 Gray File Vice President & General Counsel PD#2 PM's Philadelphia Electric Company SNorris 2301 Market Street Phillips Bldg. Receptionist Philadelphia, Pennsylvania 19101

Dear !!r. Bauer:

In my lettee of March 3,1986, I invited the participation of your licensing staff in a working level meeting on April 10, 1986. The purpose of this meeting is to discuss issues of mutual interest with the Project Managers in BWR Project 01 rectorate #2 and representatives of other utilities. The meeting has been scheduled to begin at 8:30 a.m. ir r-c " 1:0 ci th; "'n Uns o

A ild;uu,7%C nusivh Ava.x, Ect'r d>

""y ' e a d.

By April 4, please provide to your NRC Project Manager the names of those who will attend the meeting.

As you can see by the enclosed agenda, we are attempting to cover a number of areas of interest; yet provide sufficient time for in-depth discussion and questions.

I look forward to meeting with the representatives of your utility, and trust it will be a useful day.

Sincerely, C#nal signed by Daai:,li?.fau!!ct Daniel R. Muller, Director BWR Project Directorate #2 Division of BWR Licensing

Enclosure:

Agenda

, 8,-

cc: w/ enclosure w

j

See next page

/

).k&

$ld W S/DC b,N*

DBL PD#2 DB :PD#2 DBL:PD#2 SN VRooney: csp DRMtAler 3/25/86 3/g/86 3/u /86 8604070366 860325 DR ADOCK 05 7

Mr. E. G. Bauer, Jr.

Peach Bottom Atomic Power Station, Philadelphia Electric Company Units 2 and 3 cc:

Mr. Eugene J. Bradley Mr. R. A. Heiss, Coordinator Assistant General Counsel Pennsylvania State Clearinghouse Philadelphia Electric Company Governor's Office of State Planning 2301 Market Street and Developnent Philadelphia, Pennsylvania 19101 P.O. Box 1323 Harrisburg, Pennsylvania 17120 Troy B. Conner, Jr., Esq.

1747 Pennsylvania Avenue, N.W.

Mr. Thomas M. Gerusky, Director Washington, D.C.

20006 Bureau of Radiation Protection Pennsylvania Department of Thomas A. Deming, Esq.

Environmental Resources Assistant Attorney General P.O. Bo'x' 2063 Department of Natural Resources Harrisburg, Pennsylvania 17120 Annapolis, Maryland 21401 Mr. Albert R. Steel, Chairman Philadelphia Electric Company Board of Supervisors ATTN:

Mr. R. Fleishmann Peach Bottom Township Peach Bottom Atomic R. D. #1 Power Station Delta, Pennsylvania 17314 Delta, Pennsylvania 17314 Mr. M. J. Cooney, Superintendent Generation Division - Nuclear Philadelphia Electric Company 2301 Market Street Philadelphia, Pennsylvania 19101 Mr. Anthony J. Pietrofitta, General Manager Power Production Engineering Atlantic Electric P. O. Box 1500 1199 Black Horse Pike Pleasantville, New Jersey 08232 Resident Inspector U.S. Nuclear Regulatory Commission Peach Bottom Atomic Power Station P.O. Box 399 Delta, Pennsylvania 17314 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406 m.__

AGENDA April 10, 1986 Meeting With PD#2 Licensees Room P-118 - Phillips Building Bethesda, Maryland 8:30 INTRODUCTION Daniel R. Muller, Director, BWR PD#2 Robert M. Bernero, Director, DBL TECHNICAL STATUS UPDATE Intergranular Stress Corrosion Cracking - Revision 2 to NUREG-0313 (W. Hazelton)

Permanent Installation of Hydrogen Addition Systems (R. Hermann)

AUTOMATED TRACKING Tracking systems in use by(NRC (G. Gears)

Systems used by Utilities Utility participants)

Benefits of NRC/ Utility compatible system (G. Gears)

BREAK LEGAL CONSIDERATIONS Sholly process (J. Scinto)

New exemption rule 10 CFR 50.12(a) [50 FR 50764] (F. Cameron)

Interpretation of 10 CFR 50.59 (J. Scinto) 12:30 LUNCH 2:00 INTEGRATED SCHEDULES Introduction / Background (M. Thadani)

Utility experience (Iowa Electric)

BREAK TECHNICAL SPECIFICATIONS Introduction / Background (G. Rivenbark)

Tech Spec Improvement Program (Georgia Power)

Emergency Tech Spec Requests (G. Rivenbark)

CONCLUDING REMARKS (D. R. Muller) 5:00 CLOSE m m