ML20141C938

From kanterella
Jump to navigation Jump to search
Confirms 860410 Meeting to Discuss Issues W/Project Managers in BWR Project Directorate 2.Location of Meeting Changed to Holiday Inn,Bethesda,Md.Names of Attendees Should Be Provided to NRC by 860404.Agenda Encl
ML20141C938
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 03/25/1986
From: Muller D
Office of Nuclear Reactor Regulation
To: Beckham J
GEORGIA POWER CO.
References
NUDOCS 8604070350
Download: ML20141C938 (3)


Text

-

s e

Docket No.: 50-366 /321 DISTRIBUTION M i-FILE ***

P.AR 2 5 ISSS

'PDR/LPDR Mr. J. T. Beckham, Jr.

Gray File Vice President - Nuclear Generation PD#2 PM's Georgia Power Company SNorris P.O. Box 4545 Phillips Bldg. Receptionist Atlanta, Georgia 30302

Dear Mr. Beckham:

In my letter of March 3,1986, I invited the participation of your licensing statt in a working level meeting on April 10, 1986.

The purpose of this meeting is to discuss issues of mutual interest with the Project Managers in BWR Project Directorate #2 and representatives of other utilities. The meeting has been scheduled to begin at 8:30 a.m. i= o ~ o !!"

^#

' M "" ' i p h" ding. NO 'tfen Anow, kth::d, "ry!'rd.

By April 4, please provide to your NRC Project Manager the names ~ of those who will attend the meeting.

As you can see by the enclosed agenda, we are attempting to cover a number of areas of interest; yet provide sufficient tire for in-depth discussion and questions.

I look forward to meeting with the representatives of your utility, and trust it will be a useful day.

Sincerely, OMn31 signed by r~ !<tn t~ur r Daniel R. Muller, Director BWR Project Directorate #2 Division of BWR Licensing

Enclosure:

Agenda cc: w/ enclosure b.'

See next page

./U J. E rl

[} 2d MV p/ )>J.

DBL:PD#2 DBL:PD#2 DBL:Pyf SN M VRooney: csp DF$biIer 3A5/86 3/g/86 3/2f/86

%[0 OC PD P

L.

r--

/

Mr. J. T. Beckham, Jr.

Edwin 1. Hatch Nuclear Plant, Georgia Power Company Units Nos. I and 2 l

Cc:

Bruce W. Churchill, Esquire Shaw, Pittman, Potts & Trowbridge 1800 M Street, N.W.

Washington, D.C.

20036 Mr. L. T. Gucwa Engineering Department Georgia Power Cc.pany P. O. Box 4545 Atlanta, Georgia 30302 Mr. M. C. Nix, Jr., General Manager l

Edwin 1. Hatch Nuclear Plant l

Georgia Power Company P. O. Box 442 Baxley, Georgia 31513 l

Mr. Louis B. Long Southern Company Services, Inc.

P. O. Box 2625 Birmingham, Alabama 35202 Resident inspector U.S. Nuclear Regulatory Comission Route 1, P. O. Box 279 Baxley, Georgia 31513 Regional Administrator, Region II U.S. Nuclear Regulatory Comission, l

101 Marietta Street, Suite 3100 Atlanta, Georiga 30303 Mr. Charles H. Badger Office of Planning and Budget Room 610 270 Washington Street, S.W.

Atlanta, Georgia 30334 Mr. J. Leonard Ledbetter, Comissioner Department of Natural Resources 270 Washington Street, N.W.

Atlanta, Georgia 30334 Chairman Appling County Comissioners County Courthouse Baxley, Georgia 31513 I

r AGENDA April 10, 1986 Meeting With PD#2 Licensees Room P-118 - Phillips Building Bethesda, Maryland i

8:30 INTRODUCTION Daniel R. Muller, Director, BWR PD#2 Robert M. Bernero, Director, DBL TECHNICAL STATUS UPDATE Intergranular Stress Corrosion Cracking - Revision 2 to NUREG-0313 (W. Hazelton)

Pemanent Installation of Hydrogen Addition Systems (R. Hermann) j AUTOMATED TRACKING Tracking systems in use by NRC (G. Gears)

Systems used by Utilities (Utility participants)

Benefits of NRC/ Utility compatible system (G. Gears)

BREAK LEGAL CONSIDERATIONS Sholly process (J. Scinto)

New exemption rule 10 CFR 50.12(a) [50 FR 50764] (F. Cameron)

Interpretation of 10 CFR 50.59 (J. Scinto) 12:30 LUNCH 2:00 INTEGRATED SCHEDULES Introduction / Background (M. Thadani)

)

Utility experience (Iowa Electric)

BREAK TECHNICAL SPECIFICATIONS Introduction / Background (G. Rivenbark)

Tech Spec Improvement Program (Georgia Power)

Emergency Tech Spec Requests (G. Rivenbark)

CONCLUDING REMARKS (D. R. Muller) 5:00 CLOSE

..