Confirms 860410 Meeting to Discuss Issues W/Project Managers in BWR Project Directorate 2.Meeting Location Changed to Holiday Inn,Bethesda,Md.Names of Attendees Should Be Provided to NRC by 860404.Agenda Encl
ML20141C909
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 03/25/1986
From: Muller D
Office of Nuclear Reactor Regulation
To: Brons J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
References
NUDOCS 8604070342
Download: ML20141C909 (3)


Text

, , , - , , , , , , , - - , , - - , . - - - - - - - ,

s Docket No.: 50-333 DISTRIBUTION EDOCKET FILE-

^

U.AR 3 51986 PDF Mr. John C. Brons Gr-Senior Vice President - Nuclear Generstion Fu Power Authority of the State of New York Sh 123 Main Street Phillips Bldg. Receptionist White Plains, New York 10601

Dear Mr. Brons:

In my letter of March 3,1986, I invited the participation of your licensing staff in a working level meeting on April 10, 1986. The purpose of this meeting is to discuss issues of mutual interest with the Project Managers in BWR Project Directorate #2 and representatives of other utilities. The meeting has been scheduled to begin at 8:30 a.m. 4" "c- D 1 " of the chi4ps Bui' dig , 70')0 N=fci' N /c-r ue , en t ' c 2 , "' r; ' ? "d. By April 4, please provide to your NRC Project Manager the names of those who will attend the meeting.

As you can see by the enclosed agenda, we are attempting to cover a number of areas of interest; yet provide sufficient time for in-depth discussion and questions. I look forward to meeting with the representatives of ycur utility, and trust it will be a useful day.

Sincerely, C. dnalsigned by Dnir.1 R. Mu!%t, ;

Daniel R. Muller, Director BWR Project Directorate #2 Division of BWR Licensing

Enclosure:

Agenda cc: w/ enclosure See next page gx g,

7 w

f X.A .

gjy -

t n csp -

3/,7$86 3g//86 3///86 /

B604070342 06 }33 PDR ADOCK O PDR P

Mr. John C. Brons James A. FitzPatrick Nuclear Power Authority of the State of New York Power Plant cc:

Mr. Charles M. Pratt Mr. Jay Dunkleberger Assistant General Counsel Division of Policy Analysis Power Authority of the State and Planning of New York New York State Energy Office 10 Columbus Circle Agency Building 2 New York, New York 10019 Empire State Plaza Albany, New York 12223 Resident Inspector's Office U. S. Nuclear Regulatory Commission Regional Administrator, Region I Post Office Box 136 U.S. Nuclear Regulatory Commission Lycoming, New York 13093 631 Park Avenue King of Prussia, Pennsylvania 19406 Mr. A. Klausman

, Mr. Radford J. Converse Vice President - Quality Assurance Resident Manager Power Authority of the State James A. FitzPatrick Nuclear of New York Power Plant 10 Columbus Circle Post Office Box 41 New York, New York 10019 Lycoming, New York 13093 Mr. J. A. Gray, Jr. Mr. George Wilverding, Chairman Director - Nuclear Licensing - BWR Safety Review Committee Power Authority of the State Power Authority of the State of New York of New York 123 Main Street 123 Main Street White Plains, New Ycrk 10601 White Plains, Nev. York 10601 Mr. Robert P. Jones, Supervisor Town of Scriba R. D. #4 Oswego, New York 13126 Mr. Leroy W. Sinclair Power Authority of the State of New York 10 Columbus Circle New York, New York 10019 Mr. M. C. Cosgrove Quality Assurance Superintendent Janes A. FitzPatrick Nuclear Power Plant Post Office Box 41 Lycoming, New York 13093

o AGENDA April 10, 1986 Meeting With PD#2 Licensees Room P-118 - Phillips Building Bethesda, Maryland 8:30 INTRODUCTION

- Daniel R. Muller, Director, BWR PDf2

- Robert M. Bernero, Director, DBL TECHNICAL STATUS UPDATE Intergranular Stress Corrosion Cracking - Revision 2 to NUREG-0313 (W. Hazelton)

Permanent Installation of Hydrogen Addition Systems (R. Hermann)

AUTOMATED TRACKING Tracking systems in use by NRC (G. Gears)

Systems tsed by Utilities (Utility participants)

Benefits of NRC/ Utility compatible system (G. Gears)

BREAK LEGAL CONSIDERATIONS

- Sholly process (J. Scinto)

- hew exemption rule 10 CFR 50.12(a) [50 FR 50764] (F. Cameron)

Interpretation of 10 CFR 50.59 (J. Scinto)

.12:30 LUNCH 2:00 INTEGRATED SCHEDULES

- Introduction / Background (M. Thadani)

Utility experience (Iowa Electric)

BREAK TECHNICAL SPECIFICATIONS Introduction / Background (G. Rivenbark)

- Tech Spec 12provement Program (Georgia Power)

Emergency Tech Spec Requests (G. Rivenbark)

CONCLUDING REMARKS (0, R. Muller) 5:00 CLOSE

-.