Text
.
Q
a
gSI
-
.
M 2 1 1935
. Docket No. 50-344
Portland General Electric Company
121 S. W. Salmon Street
Portland, Oregon 97204
Attention:
Mr. Bart D. Withers
Vice President, Nuclear
Gentlemen:
Subject: NRC Inspection of Trojan Nuclear Plant
This refers to the special inspections conducted by Messrs. D. Willett,
J. Hayes and consultant J. Driscoll on January 28-30, and February 24-28,
1986, of activities authorized by NRC License No. NPF-1 and to the discussion
of our findings held with members of your staff at the conclusion of the
inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective
examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors and consultant.
Based on the results of this inspection, it appears that certain of your
activities was not conducted in compliance with NRC requirements. Enforcement
action by the NRC relating to the apparent violations of regulatory
requirements discussed in the attached report will be the subject of separate
correspondence. During this inspection, it was also found that one of your
activities appeared to deviate from your commitments in the FSAR. The
specific deficiency is described in the Notice of Deviation, enclosed herewith
as Appendix A.
Your response to the enclosed Notice of Eeviation is to be submitted to the
Nuclear Regulatory Commission as requested in the notices.
j
Due to the large number of discrepant conditions identified, the degraded
conditions and the manner in which the control room emergency ventilation
system has been operated and tested, we are concerned that the system would
i
not provide the necessary level of protection required during some plant
events and that the requirements co 10 CFR'50, Appendix A, General Design
'
Criteria 19, may not-have been fully effected. In addition, we are concerned
that your apparent, lack of appropriate management attention in assuring the
proper operation'and testing of the control room emergency ventilation system
resulted in a situation which allowed the disrepant conditions to exist for a
long period of time. 'In* addition to the response directed by the enclosed
notice, please address these issues in your reply.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure
j
will be placed in the NRC Public Document Room.
8604070291 860321
ADOCK 0 % 3j4
/BI
(
,j
j
-
,
..
._
_
.
'
s
.,
,
,
,
MAR 211966
"t
- Portland General Electric Company
-2-
Should you have~any questions concerning:this inspection we will be glad to
discuss them with you.
-
Sincerely,
D. F. Kirsch, Director
~
Division of Reactor Safety and Projects
Enclosures:
A.
Notice of Deviation, Appendix A
B.
Inspection Report
No. 50-344/86-06
cc w/ enclosures:
W. S. Orser, PGE
J. W. Durham, Esq.
W. Dixon, DOE
_
bec: RSB/ Document Control Desk (RIDS)
J. Martin
B. Faulkenberry
G. Cook
Resident Inspector
Project Inspector
i
.
fQ)
(Y
_
(grc M e'O
f(Y ff /g h,dds
n
08 Nf *' * " S
-
l
RV
'
C O P 'l *
DW111ett:dh
TYoung
RDo
AJohnson
ate
DKi pc
3/ll/86~
3/1//86 3/2; /86 3/ 7/f 86
3/2-/c/86
3/tf /86
i
e
e
_.
.