JOSEPH M. FAP1EY NUCLEAR PLANT UNIT 2 NARRATIVE SIM4ARY OF OPERATIONS January, 1986 During the month of January, there was one unit shutdown which occurred on 1-17-86.
A turbine trip was initiated manually following the loss of both steam generator feed pumps (SGFPs). This caused an automatic reactor trip.
The following major safety-related maintenance was performed in the month of January:
1.
Miscellaneous corre.:tive and preventive maintenance was performed on the diesel generators.
Y l
i 8602240434 860211 PDR ADOCK 05000364 R
PDR l
l 1
- - - ~.
l s.'
s.-
OPERATING DATA REPORT t
DOCKET NO. 50-364 DATE 2/4/86 COMPLETED BY J.D.Woodard TELEPHONE (2051 R99-5156 j
i OPERATING STATUS l
Notes
- 1. Unit Name: Joseph M. Farlev - Unit 2
- 2. Reporting Penod: Jan uary. 1986 1)-Cusulative data since 1
2652 7-30-81, date of commercia]
- 3. Licensed Thermal Power (MWt):
operation.
nan
- 4. Namepiste Rating (Gross MWe):
829
- 5. Dengn Electncal Rating (Net MWe):
872.2
- 6. Maximum C.,
':": Capacity (Gross MWe):
829.2
- 7. Maximism D.- - ' "- Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
Items #6 and #7 have been changed due to evaluation of operating experience.
)
- 9. Power Level To Whach Restncted. lf Any (Net MWe):
N/A N/A
- 10. Reasons For Restrictions,if Any:
t
~
This Month Yr.-to.Date Cuniulative
- 11. Hours la Reportmg Period 744 744 39.529 714.2 714.2 39,520.8
- 12. Number Of Hours Reactor Was Critical 0.0 0.0 138.0
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 706.5 706.5 34.098.9
- 15. Unit Reserve Shutdown Hours 0.0
.0.0 0.0 1,798,238 1,798,238 86,032,788
- 16. Gross Thermal Energy Generated (MWH)
- 17. Gross Electncal Energy Generated (MWH) 602,430 602,430 28,325,118
- 18. Net Elecencal Energy Generated (MWH) 572.530 572 s?0 26.861.770
- 19. Unit Semce Factor 95.0 95.0 R6.1 95.0 95.0 86.3
- 20. Unit Avadabdity Factor
- 21. Unit Capseny Factor (Using MDC Net) 92.8 92.8 83.9 92.8 92.8 82.0
- 22. Unit Capecity Factor (Using DER Net) 5.0 5.0 4.8
- 23. Unit Forced Octage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each t:
Refueling / maintenance outage, 4/4/86, approximately 5 weeks.
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved i
05-06-81 05-08-81 INITIAL CRITICALITY INITIAL ELECTRICITY 05-24-81 05-25-R1 1
COMMERCIAL OPERATION 08-01-81 07-30-81
\\
i j
l (9/77)
pocgg7 30, 50-364
~
UNIT 2
DATE February 4, 1986 COMPLETED BY J. D. Woodard l
y TELEPHONE (205) 899-5156 i
St0NTig Januarv. 1986
/
DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER !.EVEL (5tWe-Net)
(51We-Net) 840 1
37 m
2 838 IS 0
~
835 '- -
124 3
4 Als 20 soA 839 23 834 3
6 840 22 830 838 7
23 R"
834 g
839 24
(
9 839 23-834 10 817 26 Ru l
-838 27 834 3g 836 12 3
pqg l3 836 3
832 14 m
30 ntn is 838 33 835 16 839 INSTRUCTIONS On this form:r. list the aversge daily unit power levelin MWe Net for each d:y in the reporting month. Compute to
, the neare:t whole me;2 watt.
l l
i i
l
)
\\
. ~ - - - -
C D
O DOCKETNO. 5b-364 l
UNIT NAME J.M.Farley-Unit 2,
UNIT SiluTDOWNS AND POWER REDUCHONS DATE February 3. 1986 COMPLETEt3 sy J.D.Woodard i
REPORT MONng January. 1986 TELErilONE (205)899-5156 i
4 erg
.$ E s
Lkensec 5%
b*L Cause & Cossecaive No.
Date
{
gg
] goc Eveni
{l Acilius su mV u
o6 j g2 g Repini #
Pstvent Recutscuce b
a i
6 A turbine trip was initiated 001 860117 F
37.5 A
1 86-001-00 SJ 33 manually following the loss of both steam generator feed pumps (SGFPs). This caused an automatic reactor trip. A short circuit in the SGFP control panel resulted in the loss of the 1
redundant power supplies which serve both SGFPs. The speed of f
both SGFPs began decreasing. The 1
circuit was repaired and the unit r
returned to power operation.
i e
1 2
3 4
F: For ed Reason:
Method:
Exhibis G. insisections I-Manual
. for Preparathm of Data S: Sdieduled A-Equipment Failure (Explain) j B-Maintenance or Test 2 Manual Scram.
Entry Sheets for I.kensec l
C Refueling 3 Aulumatic Scram.
Event Rep wa (I ER) File INUREG-D-Regulaimy Restriction 4-Oslics (Explain) 01611 E-Opes.aios Training & license Exandnasion l
F Administrative 5
G Opciatiemal Lisus (Emplain)
Exliible I Same Sousee t
)
('J/77) 18 Othes (Explain) i
1 OPERATING DATA REPORT DOCKET NO.
50-364 DATE l-3-86 COMPLETED BY 3-n Unnrfard TELEPHONE UU5) 8w-5156 OPERATING STATUS
- 1. Unit Name: Joseoh M. Farley t'dumulativedatasince
- 2. Reporting Period: December, 1985 7-30-81, date of commercial
- 3. Licensed Thermal Power (MWt): 2,652 operation.
~
- 4. Nameplate Rating (Gross MWe):
860
- 5. Design Electrical Raung (Net MWe): 829
- 6. Maximum Dependable Caps:ity (Gross MWe): 850.2 807.2 l
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Nurnber 3 Through "I) Since last Report, Give Reasons:
N/A J
- 9. Power Level To Which Restricted. !f Any (Net MWe):
N/A
- 10. Reasons For Restrictions.If Any:
N/A 4
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744 8.760 38.785
- 12. Number Of flours Reactor Was Critical 744.0 6,888.1 38,806.6
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
- 14. Hours Generator On Line 744.0 6.814.3 33.392.4
- 15. Unit Reserve Shutdow Hours 0.0 0.0 0.0
- 16. Grors The-mal Ener;y Generated (MWH) 1.926.073 17.381.802 44.234.550 i
'17. Gross Electrical Energy Generated (MWH) 647.616 5.776.406 2'/.722.688
- 18. Net Electrical Energy Generated (MWH) 617,316 5,470,318 26,289,240
- 19. Unit Service Facter 100.0 77.8 86.1
- 20. Unit Availability Factor 100.0 77.8 86.1
- 21. Unit Capacity Factor (Using MDC Net) 102.8 77.4 83.7
- 22. Unit Capacity Factor (Using DER Net) 100.1 75.3 81.8
- 23. Unit Forced Outage Rate 0.0 2.2 4.8
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each):
)
Refuelino/ maintenance outane. 4/4/86. aooroximatelv 5 weeks.
l f
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved i
INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/R1 05/95/Al COMMERCIAL OPERATION 08/01/81 07/30/81 (9/77)
i i
JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE SIDMARY OF OPERATIONS January, 1986 During the month of January, there was one unit shutdown which occurred on 1-17-86.
A turbine trip was initiated manually following the loss of both steam generator feed pumps (SGFPs). This caused an automatic reactor trip.
The following major safety-related maintenance was performed in the month of January:
1.
Miscellaneous corrective and preventive maintenance was performed on the diesel generators.
4 1
l
- l l
l l
l l
. -. _. _ _ ~ _ - -. -,..,, -.
.-~
a 1
OPERATING DATA REPORT DOCKET NO. 50-364 DATE 2/4/86 COMPLETED BY J.D.Woodard TELEPHONE (2o si R99-5156 i
l OPERATING STATUS
~
- 1. Unit hme. Joseph M. Farlev - Unit 2 1)-Cumulative data since Jan uarv. 1986
- 2. Reporting Pened.
7-30-81, date of commereial 2652
- 3. Licensed Thennel Power (MWt):
operation.
nan
- 4. Namepiste Rating (Gross MWe):
829 l
- 5. Demsa Electnal Rating (Net MWe):
a72.2
- 6. Maximum C.,
' "2 Capaaty (Gross MWe):
829.2
- 7. Maximum C.,
' "- Capecay (Net MWe):
i
- 8. If Changes Occur in Capacity Ratings (Itema Number 3 Through 7) Since Last Report. Give Reasons:
Items #6 and #7 have been changed due to evaluation of operating experience.
- 9. Power Level To Wluch Restricted. If Any (Net MWe): N/A i
N/A l
- 10. Reasons For Restrictions. If Any:
i This Month Yr.-to-Dete Cuniulative 4
744 74A 39.529
- 11. Hours In Reportmg Period 714.2 714.2 39,520.8 l
- 12. fiumber Of Houn Reactor Was Critical 0.0 0.0
. 138.0 l
- 13. Reactor Reserve Shutdown Hours 706.5 706.5 34.098.9
- 14. Hours Generator On-Line 0.0
.0.0 0.0
- 15. Unit Reserve Shutdown Hours 1,798,238 1,798,238 86,032,788
- 16. Grom Thermal Energy Generated (MWH) 602,430 602,430 28,325,118
- 17. Gross Electncel Energy Generated (MWH) 572.530 572.530 26_861.770 l
- 18. Net Elecencel Energy Generated (MWH) 45 o 95.0 n6.1
- 19. Unit Semce Factor 95.0 95.0 86.3 l
- 20. Unit Avadabdity Facto, 92.8 92.8 83.9
- 21. Unit Capacwy Factor (Using MDC Net) 92.8 92.8 82.0 l
- 22. Unit Capacity Factor (Using DER Net) 5.0 5.0 4.8 l
- 23. Unit Forced Outage Rate l
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Dete and Duration of Each t:
Refueling / maintenance outage, 4/4/86, approximately 5 weeks.
N/A
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status t Prior to Commercial Operation):
Forecast Achieved 05-06-81 05-08-81 INITIAL CRITICALITY INITIAL ELECTRICITY 05-24-RI 05-25-A1 COMMERCIAL OPERATION 08-01-81 07-30-81 (9/77i
ggg7 3(),
50-364 UNIT 2
DATE February 4, 1986 1
COMPLETED BY J. D. Woodard TELEPHONE (205) 899-5156 l
310ffril Januarv. 1986
/
DAY AVERACE DAILY POWER LEVEL DAY' AVERACE DAILY POWER LEVEL plWe-Net)
(&lwe Net) 840 37 m
j g,
0 2
838 13 g35 --
- -- - ----- -- - --- 19 --
124 3
4 A"
30 906 839 23 83/4 1
f 3
830 l
6 840
, T.
838 7
23 R"
834 839
- 4 J
g 9
830 25' 834 10 9'7 26 Ru 834 3g
- 838 n
836 3
g q r, 12 832 l3 836 3
14 9"
30 Ato 838 33 835 gg 16 839 l
M UCUONS On this form:r. list the aversge daily unit powe-levelin MWe Net for each day in the repottmg month. Compute to
, the neare:t whole me;swatt.
(9p7) i o
b
-,----,,--c..~,
,w
-,,7.,_r._
-&-w,
---r--,
,_-m%,-,,__,---,_..m,_~m...
ye,-.w.ve..,,,m..,,,-r.,,,ve.$.
,..-.-,.,.-4-..
i
.s D
D O
l DOCKETNO. _50-364 UNIT Silu1 DOWNS AND POWER RElH3CI10NS IJNITNAME J.M.Farley-Unit 2 l
DATE February 3.
1986
~
I COMPLETED sY J.D.Woodard REPORT MONfil January. 1986 TELEPilONE (205)899-5156 l
l t
'5 45 g
g.
re Cause & Cussective b.
g4 l
II l
3 E$
~
l No.
pase K
3 3,,g,,,,
Even 9,7 0 *2 j
Ssx g
E N'P"" "
g" Pstycne Recmscace l
A turbine trip was initiated j
001 860117 F
37.5 A
1 86-001-00 SJ 83 manually following the loss of both steam generator feed pumps i
(SGFPs). This caused an automatic reactor trip. A short j
circuit in the SGFP control panel resulted in the loss of the redundant power supplies which i
serve both SGFPs. The speed of both SGFPs began decreasing. The circuit was repaired and the unit returned to power operation.
}
l l
r O
I 2
3 4
F: Forced Reason:
Method:
sidbis G. lasesections i
S: SchedulcJ A Equipmens Failure (Empla'.n)
I-Manual for Preparation of Dasa n Maintenance o(Test 2 Manual Sesam.
Emesy Sheels for Licensee C Refuelkig 3 Aulimaalic Scsaan.
Ewas Repews (LER) File (NUREG-I D Regislasiuy Resisicche 4 Oshes (Emplahi) 0161) i t
E-Opesaios Tsaininaa license Emandnation F Adninisitative 5
l G Opesasi wial Essos (Emplain)
Exhibit 1. Saine Sinisce 4
(9/77) ll Othes (E xplain)
-