JOSEPH M. FAP1EY NUCLEAR PLANT UNIT 2 NARRATIVE SIM4ARY OF OPERATIONS January, 1986 During the month of January, there was one unit shutdown which occurred on 1-17-86.

A turbine trip was initiated manually following the loss of both steam generator feed pumps (SGFPs). This caused an automatic reactor trip.

The following major safety-related maintenance was performed in the month of January:

1.

Miscellaneous corre.:tive and preventive maintenance was performed on the diesel generators.

Y l

i 8602240434 860211 PDR ADOCK 05000364 R

PDR l

l 1

- - - ~.

l s.'

s.-

OPERATING DATA REPORT t

DOCKET NO. 50-364 DATE 2/4/86 COMPLETED BY J.D.Woodard TELEPHONE (2051 R99-5156 j

i OPERATING STATUS l

Notes

1. Unit Name: Joseph M. Farlev - Unit 2
2. Reporting Penod: Jan uary. 1986 1)-Cusulative data since 1

2652 7-30-81, date of commercia]

3. Licensed Thermal Power (MWt):

operation.

nan

4. Namepiste Rating (Gross MWe):

829

5. Dengn Electncal Rating (Net MWe):

872.2

6. Maximum C.,

':": Capacity (Gross MWe):

829.2

7. Maximism D.- - ' "- Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:

Items #6 and #7 have been changed due to evaluation of operating experience.

)

9. Power Level To Whach Restncted. lf Any (Net MWe):

N/A N/A

10. Reasons For Restrictions,if Any:

t

~

This Month Yr.-to.Date Cuniulative

11. Hours la Reportmg Period 744 744 39.529 714.2 714.2 39,520.8
12. Number Of Hours Reactor Was Critical 0.0 0.0 138.0
13. Reactor Reserve Shutdown Hours
14. Hours Generator On.Line 706.5 706.5 34.098.9
15. Unit Reserve Shutdown Hours 0.0

.0.0 0.0 1,798,238 1,798,238 86,032,788

16. Gross Thermal Energy Generated (MWH)
17. Gross Electncal Energy Generated (MWH) 602,430 602,430 28,325,118
18. Net Elecencal Energy Generated (MWH) 572.530 572 s?0 26.861.770
19. Unit Semce Factor 95.0 95.0 R6.1 95.0 95.0 86.3
20. Unit Avadabdity Factor
21. Unit Capseny Factor (Using MDC Net) 92.8 92.8 83.9 92.8 92.8 82.0
22. Unit Capecity Factor (Using DER Net) 5.0 5.0 4.8
23. Unit Forced Octage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each t:

Refueling / maintenance outage, 4/4/86, approximately 5 weeks.

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved i

05-06-81 05-08-81 INITIAL CRITICALITY INITIAL ELECTRICITY 05-24-81 05-25-R1 1

COMMERCIAL OPERATION 08-01-81 07-30-81

\\

i j

l (9/77)

pocgg7 30, 50-364

~

UNIT 2

DATE February 4, 1986 COMPLETED BY J. D. Woodard l

y TELEPHONE (205) 899-5156 i

St0NTig Januarv. 1986

/

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER !.EVEL (5tWe-Net)

(51We-Net) 840 1

37 m

2 838 IS 0

~

835 '- -

124 3

4 Als 20 soA 839 23 834 3

6 840 22 830 838 7

23 R"

834 g

839 24

(

9 839 23-834 10 817 26 Ru l

-838 27 834 3g 836 12 3

pqg l3 836 3

832 14 m

30 ntn is 838 33 835 16 839 INSTRUCTIONS On this form:r. list the aversge daily unit power levelin MWe Net for each d:y in the reporting month. Compute to

, the neare:t whole me;2 watt.

l l

i i

l

)

\\

. ~ - - - -

C D

O DOCKETNO. 5b-364 l

UNIT NAME J.M.Farley-Unit 2,

UNIT SiluTDOWNS AND POWER REDUCHONS DATE February 3. 1986 COMPLETEt3 sy J.D.Woodard i

REPORT MONng January. 1986 TELErilONE (205)899-5156 i

4 erg

.$ E s

Lkensec 5%

b*L Cause & Cossecaive No.

Date

{

gg

] goc Eveni

{l Acilius su mV u

o6 j g2 g Repini #

Pstvent Recutscuce b

a i

6 A turbine trip was initiated 001 860117 F

37.5 A

1 86-001-00 SJ 33 manually following the loss of both steam generator feed pumps (SGFPs). This caused an automatic reactor trip. A short circuit in the SGFP control panel resulted in the loss of the 1

redundant power supplies which serve both SGFPs. The speed of f

both SGFPs began decreasing. The 1

circuit was repaired and the unit r

returned to power operation.

i e

1 2

3 4

F: For ed Reason:

Method:

Exhibis G. insisections I-Manual

. for Preparathm of Data S: Sdieduled A-Equipment Failure (Explain) j B-Maintenance or Test 2 Manual Scram.

Entry Sheets for I.kensec l

C Refueling 3 Aulumatic Scram.

Event Rep wa (I ER) File INUREG-D-Regulaimy Restriction 4-Oslics (Explain) 01611 E-Opes.aios Training & license Exandnasion l

F Administrative 5

G Opciatiemal Lisus (Emplain)

Exliible I Same Sousee t

)

('J/77) 18 Othes (Explain) i

1 OPERATING DATA REPORT DOCKET NO.

50-364 DATE l-3-86 COMPLETED BY 3-n Unnrfard TELEPHONE UU5) 8w-5156 OPERATING STATUS

1. Unit Name: Joseoh M. Farley t'dumulativedatasince
2. Reporting Period: December, 1985 7-30-81, date of commercial
3. Licensed Thermal Power (MWt): 2,652 operation.

~

4. Nameplate Rating (Gross MWe):

860

5. Design Electrical Raung (Net MWe): 829
6. Maximum Dependable Caps:ity (Gross MWe): 850.2 807.2 l
7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Items Nurnber 3 Through "I) Since last Report, Give Reasons:

N/A J

9. Power Level To Which Restricted. !f Any (Net MWe):

N/A

10. Reasons For Restrictions.If Any:

N/A 4

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 744 8.760 38.785
12. Number Of flours Reactor Was Critical 744.0 6,888.1 38,806.6
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On Line 744.0 6.814.3 33.392.4
15. Unit Reserve Shutdow Hours 0.0 0.0 0.0
16. Grors The-mal Ener;y Generated (MWH) 1.926.073 17.381.802 44.234.550 i

'17. Gross Electrical Energy Generated (MWH) 647.616 5.776.406 2'/.722.688

18. Net Electrical Energy Generated (MWH) 617,316 5,470,318 26,289,240
19. Unit Service Facter 100.0 77.8 86.1
20. Unit Availability Factor 100.0 77.8 86.1
21. Unit Capacity Factor (Using MDC Net) 102.8 77.4 83.7
22. Unit Capacity Factor (Using DER Net) 100.1 75.3 81.8
23. Unit Forced Outage Rate 0.0 2.2 4.8
24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each):

)

Refuelino/ maintenance outane. 4/4/86. aooroximatelv 5 weeks.

l f

25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved i

INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/R1 05/95/Al COMMERCIAL OPERATION 08/01/81 07/30/81 (9/77)

i i

JOSEPH M. FARLEY NUCLEAR PLANT UNIT 2 NARRATIVE SIDMARY OF OPERATIONS January, 1986 During the month of January, there was one unit shutdown which occurred on 1-17-86.

A turbine trip was initiated manually following the loss of both steam generator feed pumps (SGFPs). This caused an automatic reactor trip.

The following major safety-related maintenance was performed in the month of January:

1.

Miscellaneous corrective and preventive maintenance was performed on the diesel generators.

4 1

l

l l

l l

l l

. -. _. _ _ ~ _ - -. -,..,, -.

.-~

a 1

OPERATING DATA REPORT DOCKET NO. 50-364 DATE 2/4/86 COMPLETED BY J.D.Woodard TELEPHONE (2o si R99-5156 i

l OPERATING STATUS

~

1. Unit hme. Joseph M. Farlev - Unit 2 1)-Cumulative data since Jan uarv. 1986
2. Reporting Pened.

7-30-81, date of commereial 2652

3. Licensed Thennel Power (MWt):

operation.

nan

4. Namepiste Rating (Gross MWe):

829 l

5. Demsa Electnal Rating (Net MWe):

a72.2

6. Maximum C.,

' "2 Capaaty (Gross MWe):

829.2

7. Maximum C.,

' "- Capecay (Net MWe):

i

8. If Changes Occur in Capacity Ratings (Itema Number 3 Through 7) Since Last Report. Give Reasons:

Items #6 and #7 have been changed due to evaluation of operating experience.

9. Power Level To Wluch Restricted. If Any (Net MWe): N/A i

N/A l

10. Reasons For Restrictions. If Any:

i This Month Yr.-to-Dete Cuniulative 4

744 74A 39.529

11. Hours In Reportmg Period 714.2 714.2 39,520.8 l
12. fiumber Of Houn Reactor Was Critical 0.0 0.0

. 138.0 l

13. Reactor Reserve Shutdown Hours 706.5 706.5 34.098.9
14. Hours Generator On-Line 0.0

.0.0 0.0

15. Unit Reserve Shutdown Hours 1,798,238 1,798,238 86,032,788
16. Grom Thermal Energy Generated (MWH) 602,430 602,430 28,325,118
17. Gross Electncel Energy Generated (MWH) 572.530 572.530 26_861.770 l
18. Net Elecencel Energy Generated (MWH) 45 o 95.0 n6.1
19. Unit Semce Factor 95.0 95.0 86.3 l
20. Unit Avadabdity Facto, 92.8 92.8 83.9
21. Unit Capacwy Factor (Using MDC Net) 92.8 92.8 82.0 l
22. Unit Capacity Factor (Using DER Net) 5.0 5.0 4.8 l
23. Unit Forced Outage Rate l
24. Shutdowns Scheduled Over Next 6 Months (Type. Dete and Duration of Each t:

Refueling / maintenance outage, 4/4/86, approximately 5 weeks.

N/A

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status t Prior to Commercial Operation):

Forecast Achieved 05-06-81 05-08-81 INITIAL CRITICALITY INITIAL ELECTRICITY 05-24-RI 05-25-A1 COMMERCIAL OPERATION 08-01-81 07-30-81 (9/77i

ggg7 3(),

50-364 UNIT 2

DATE February 4, 1986 1

COMPLETED BY J. D. Woodard TELEPHONE (205) 899-5156 l

310ffril Januarv. 1986

/

DAY AVERACE DAILY POWER LEVEL DAY' AVERACE DAILY POWER LEVEL plWe-Net)

(&lwe Net) 840 37 m

j g,

0 2

838 13 g35 --

- -- - ----- -- - --- 19 --

124 3

4 A"

30 906 839 23 83/4 1

f 3

830 l

6 840

, T.

838 7

23 R"

834 839

4 J

g 9

830 25' 834 10 9'7 26 Ru 834 3g

- 838 n

836 3

g q r, 12 832 l3 836 3

14 9"

30 Ato 838 33 835 gg 16 839 l

M UCUONS On this form:r. list the aversge daily unit powe-levelin MWe Net for each day in the repottmg month. Compute to

, the neare:t whole me;swatt.

(9p7) i o

b

-,----,,--c..~,

,w

-,,7.,_r._

-&-w,

---r--,

,_-m%,-,,__,---,_..m,_~m...

ye,-.w.ve..,,,m..,,,-r.,,,ve.$.

,..-.-,.,.-4-..

i

.s D

D O

l DOCKETNO. _50-364 UNIT Silu1 DOWNS AND POWER RElH3CI10NS IJNITNAME J.M.Farley-Unit 2 l

DATE February 3.

1986

~

I COMPLETED sY J.D.Woodard REPORT MONfil January. 1986 TELEPilONE (205)899-5156 l

l t

'5 45 g

g.

re Cause & Cussective b.

g4 l

II l

3 E$

~

l No.

pase K

3 3,,g,,,,

Even 9,7 0 *2 j

Ssx g

E N'P"" "

g" Pstycne Recmscace l

A turbine trip was initiated j

001 860117 F

37.5 A

1 86-001-00 SJ 83 manually following the loss of both steam generator feed pumps i

(SGFPs). This caused an automatic reactor trip. A short j

circuit in the SGFP control panel resulted in the loss of the redundant power supplies which i

serve both SGFPs. The speed of both SGFPs began decreasing. The circuit was repaired and the unit returned to power operation.

}

l l

r O

I 2

3 4

F: Forced Reason:

Method:

sidbis G. lasesections i

S: SchedulcJ A Equipmens Failure (Empla'.n)

I-Manual for Preparation of Dasa n Maintenance o(Test 2 Manual Sesam.

Emesy Sheels for Licensee C Refuelkig 3 Aulimaalic Scsaan.

Ewas Repews (LER) File (NUREG-I D Regislasiuy Resisicche 4 Oshes (Emplahi) 0161) i t

E-Opesaios Tsaininaa license Emandnation F Adninisitative 5

l G Opesasi wial Essos (Emplain)

Exhibit 1. Saine Sinisce 4

(9/77) ll Othes (E xplain)

-