Revised Page to Monthly Operating Rept for Dec 1985, Reflecting Correct Monthly Gross Thermal Energy Generated
ML20141B917
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 12/31/1985
From: Woodard J
ALABAMA POWER CO.
To:
Shared Package
ML20141A903 List:
References
NUDOCS 8602240435
Download: ML20141B917 (1)


Text

,

OPERATING DATA REPORT DOCKET NO. 50-364 DATE l-3-86 COMPLETED BY

.1-n Unndard TELEPHONE Rob) 899-5156 i

OPERATING STATUS

1. Unit Name: Joseph M. Farley umulative data since December,1985
2. Reporting Period:

7-30-81, date of commercial

3. t ie-a=d Thermal Power (MWt): 2,652 operation.

1 860

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe): 829 i
6. Maximum Dependable Capacity (Gross MWe): 850,2 807.2 1
7. Maximum Dependable Capacity (Net.NiWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 'l) Since Last Report, Give Reasons:

N/A l

9. Power Level To Which Restricted,1f Any (Net MWe):

N/A i

10. Reasons For Restrictions.If Any:

N/A This Month Yr. to-Date Cumulative

11. Hours In Reporting Period 744 8.760 38.785
12. Nurnber Of Hours Reactor Was Critica!,

744.0 6,888.1 38,806.6

13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0 I
14. Hours Generator On-Line 744.0 6.814.3 33.392.4
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 j
16. Grors The mal Ener;y Gene.~ted (MWH) 1.926.073 17.3R1.802 84.234.550

'17. Gross Electrical Energy Generated (MhH) 647.616 5.776.406 27.722.688 i

18. Net Electrical Energy Generated (MWH) 617,316 5,470,318 26,289,240
19. Unit Service Factor 100.0 77.8 86.1
20. Unit Availability Factor 100.0 77.8 86.1 l
21. Unit Capacity Factor (Using MDC Net) 102.8 77.4 83.7
22. Unit Capacity Factor (Using DER Net) 100.1 75.3 81.8
23. Unit Forced Outage Rate 0.0 2.2 4.8
24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each):

Refuelino/ maintenance outane. 4/4/86. aooroximatelv 5 weeks.

1

' 25. If Shut Down At End Of Report Period. Estimated Date of Startup:

N/A

26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved

]

INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/R1 05/?R/R]

COMMERCIAL OPER ATION 08/01/81 07/30/81 8602240435 960211 PDR ADOCK 05000364 (9/77)