OPERATING DATA REPORT DOCKET NO. 50-364 DATE l-3-86 COMPLETED BY
.1-n Unndard TELEPHONE Rob) 899-5156 i
OPERATING STATUS
- 1. Unit Name: Joseph M. Farley umulative data since December,1985
- 2. Reporting Period:
7-30-81, date of commercial
- 3. t ie-a=d Thermal Power (MWt): 2,652 operation.
1 860
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe): 829 i
- 6. Maximum Dependable Capacity (Gross MWe): 850,2 807.2 1
- 7. Maximum Dependable Capacity (Net.NiWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 'l) Since Last Report, Give Reasons:
N/A l
- 9. Power Level To Which Restricted,1f Any (Net MWe):
N/A i
- 10. Reasons For Restrictions.If Any:
N/A This Month Yr. to-Date Cumulative
- 11. Hours In Reporting Period 744 8.760 38.785
- 12. Nurnber Of Hours Reactor Was Critica!,
744.0 6,888.1 38,806.6
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0 I
- 14. Hours Generator On-Line 744.0 6.814.3 33.392.4
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0 j
- 16. Grors The mal Ener;y Gene.~ted (MWH) 1.926.073 17.3R1.802 84.234.550
'17. Gross Electrical Energy Generated (MhH) 647.616 5.776.406 27.722.688 i
- 18. Net Electrical Energy Generated (MWH) 617,316 5,470,318 26,289,240
- 19. Unit Service Factor 100.0 77.8 86.1
- 20. Unit Availability Factor 100.0 77.8 86.1 l
- 21. Unit Capacity Factor (Using MDC Net) 102.8 77.4 83.7
- 22. Unit Capacity Factor (Using DER Net) 100.1 75.3 81.8
- 23. Unit Forced Outage Rate 0.0 2.2 4.8
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each):
Refuelino/ maintenance outane. 4/4/86. aooroximatelv 5 weeks.
1
' 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved
]
INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECTRICITY 05/24/R1 05/?R/R]
COMMERCIAL OPER ATION 08/01/81 07/30/81 8602240435 960211 PDR ADOCK 05000364 (9/77)