Requests Names of Persons Planning to Attend 860410 Working Level Meeting W/Bwr Project Directorate 2 Project Managers by 860404.Meeting Location Changed to Holiday Inn,Bethesda, MD
ML20141B800
Person / Time
Site: Cooper Entergy icon.png
Issue date: 03/25/1986
From: Muller D
Office of Nuclear Reactor Regulation
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
References
NUDOCS 8604070114
Download: ML20141B800 (3)


Text

7

  • Docket No.: 50-298 DISTRIBUTION 4 DOCKET;FILEm a PDR/LPDR Mr. J. M. Pilant Gray File Technical Staff Manager PD#2 PM's Nuclear Power Group E86 SNorris WAR 2 5 Nebraska Public Power District Phillips Bldg. Receptionist P.O. Box 499 Columbus, Nebraska 68601

Dear Mr. Pilant:

In my letter of March 3,1986, I invited the participation of your licensing staff in a working level meeting on April 10, 1986. The purpose of this meeting is to discuss issues of mutual interest with the Project Managers in BWR Project Directorate #2 and representatives of other utilities. The meeting has been scheduled to begin at 8:30 a.m. in Dec o 110 vi wc Fi. iii .ps Eri!di.3, 732G hviivis Avenuc, 0;th =d;,."c.ji nd. By April 4, please provide to your NRC Project Manager the names of those who will attend the meeting.

As you can see by the enclosed agenda, we are attempting to cover a number of areas of interest; yet provide sufficient time for in-depth discussion and questions. I look forward to meeting with the representatives of your utility, and trust it will be a useful day.

Sincerely, Orfr%31s!gned by O r ici R. ffuNr Daniel R. Muller, Director BWR Project Directorate #2 Division of BWR Licensing

Enclosure:

Agenda .

cc: w/ enclosure .

See next page j_)< A 9

Av hao & '"" s

/

DBL _:PJD#

BL:PD#2 DBL2 PM SfM 7is VRooney: csp DRIVA ler 3/;4/86 3g/86 3/v'/86 8604070114 860325 PDR ADOCK 05000290 P PDH

I Mr. J. M. Pilant Nebraska Public Power District Cooper Nuclear Station cc:

Mr. G. D. Watson. . General Counsel Nebraska Public Power District P. O. Box 4999 Columbus, Nebraska 68601

!!r. Arthur C. Gehr, Attorney Snell & Wilmer 3100 Valley Center Phoenix, Arizona 85073 Cooper Nuclear Station ATTN: Mr. Paul Thomason, Division Manager of Nuclear Operations P. O. Box 98 Brownville, Nebraska 68321 Director Nebraska Department of Environmental Control P. O. Box 94877 State House Station Lincoln, Nebraska 68509 Mr. William Siebert, Commissioner .

Nemaha County Board of Comm.issioners Nemaha County Courthouse Auburn, Nebraska 68305 Resident Inspector U.S. Nuclear Regulatory Commission P. O. Box 218 Brownville, Nebraska 68321 Regional Administrator, Region IV 0.5. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011 H. Ellis Simmons, Director Division of Radiological Health Department of Health 301 Centennial Mall, South P. O. Box 95007 Lincoln, Nebraska 68509 i

[ l l

, 1 L ,

I o AGENDA April 10, 1986 Meeting With PD#2 Licensees Room P-118 - Phillips Building Bethesda, Maryland 8:30 INTRODUCTION

- Daniel R. Muller, Director, BWR PD#2

- Robert M. Bernero, Director, DBL TECHNICAL STATUS UPDATE Intergranular Stress Corrosion Cracking - Revision 2 to NUREG-0313 (W. Hazelton)

Permanent Installation of Hydrogen Addition Systems (R. Hermann)

AUT0tiATED TRACKING Tracking systems in use by NRC (G. Gears)

- Systems used by Utilities (Utility participants)

- Benefits of NRC/ Utility compatible system (G. Gears)

BREAK LEGAL CONSIDERATIONS Sholly process (J. Scinto)

- New exemption rule 10 CFR 50.12(a) [50 FR 50764] (F. Cameron)

- Interpretation of 10 CFR 50.59 (J. Scinto) 12:30 LUNCH 2:00 INTEGRATED SCHEDULES

- Introduction / Background (M.Thadani)

Utility experience (Iowa Electric)

BREAK TECHNICAL SPECIFICATIONS

- Introduction / Background (G. Rivenbark)

- Tech Spec Improvement Program (Georgia Power)

- Emergency Tech Spec Requests (G. Rivenbark)

CONCLUDING REMARVsS (D. R. Muller) 5:00 CLOSE W-