ML20141B065

From kanterella
Jump to navigation Jump to search
Requests Names of Individuals Attending 860410 Working Level Meeting in Bethesda,Md to Discuss Issues of Mutual Interest W/Project Managers & Representatives of Other Utils by 860404.Location Change Noted
ML20141B065
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 03/25/1986
From: Muller D
Office of Nuclear Reactor Regulation
To: Capstick R
VERMONT YANKEE NUCLEAR POWER CORP.
References
NUDOCS 8604040618
Download: ML20141B065 (3)


Text

t Docket No.: 50-271 DISTRIBUT LN 6;E+

PDR/LPDR Mr. R. W. Capstick Gray File Licensing Engineer PD#2 PM's Vermont Yankee Nuclear Power W 2 51986 SNorris Corporation Phillips Bldg. Receptionist 1671 Worcester Road Framingham, Massachusetts 01701

Dear Mr. Capstick:

In my letter of March 3,1986, I invited the participation of your licensing staff in a working level meeting on April 10, 1986. The purpose of this meeting is to discuss issues of nutuai interest with the Project Managers in BWR Project Directorate #2 and representatives of other utilities. The meeting has been scheduled to begin at 8:30 a.m.

  • o^& o -1F

^# tM """l ip h4id!S, 7a ?n

'l^ -#^ ' '-

By April 4, please provide m,

-.mmm, to your NRC Project Manager the names of those who will attend the meeting.

As you can see by the enclosed agenda, we are attempting to cover a number of areas of interest; yet provide sufficient time for in-depth discussion and questions.

I look forward to meeting with the representatives of your utility, and trust it will be a useful day.

Sincerely, CMnat sir.23 by Oniel R. Muk r Daniel R. Muller, Director BWR Project Directorate #2 Division of SWR Licensing

Enclosure:

y, Agenda g

e.

cc: w/ enclosure f

See next page Pos M h.

11oA }!J.

Y

)

DBL J:

DBL:PD#2[c5p[VDBL: PAS PD8 SNdffis VRooney.

DRRuiTer 3/A5/86 3/ (/86 3/6/86 4

8604040618 960325 PDR ADOCK 05000271 P

PDR

~

c Mr. R. W. Capstick Vernont Yankee Nuclear Power Corporation Vermont Yankee Nuclear Power Station CC:

Pr. W. F. Conway W. P. Murphy, Vice President f.

President & Chief Executive Officer Manager of Operations Verment Yankee Nuclear Power Corp.

Vermont Yankee Nuclear Pcwer Corp.

R. D. 5, Box 169 R. D. 5, Box 169 Ferry Road Ferry Road Brattlebero, Vermont 05301 Brattleboro, Vernont 05301 s

Mr. Donald Hunter, Vice President Mr. Gerald Tarrant Connissioner Vermont Yankee Nuclear Power Corp.

Verment Department of Public Service 1671 Worcester Road 120 State Street Framingham, Massachusetts 01701 Montpelier, Vermont 05602 Few England Coalition en i

Nuclear Pollution-Hill ar.d Dale Farn Public Service Board R. D. 2, Box 223 State of Vermont Putr.ey, Vermont 05346 120 State Street Montpelier, Vermont 05602 Mr. Walter Zaluzny Chairman, Beard of Selectran Vermont Yankee Deconmissionirg Post Office Box 116 Alliance Vernon, Verront 05345 Box 53 Montpelier, Verront 05602-0053 J. P. Pelletier, Plant Manager Vermont Yankee fluclear Power Corp.

Post Office Box 157 Resident Inspector Vernon, Vermont 05354 U. S. Nuclear Regulatory Corrission Post Office Pox 176 Rayrond N. McCandless Vernon, Verrent 05354 l

Vermont Division of Occupations 1 j

A Padiological Health Vernont Public Interest Administration Building Research Group, Inc.

10 Paldriin Street 43 State Street Montpelier, Vercont 05602 Mentpelier Vermont 05E07 Honorable John J. Easton Thomas A. Murley Attorney General Regional Adninistrator

-State of Verront Region I Office 109 State Street U. S. l'uclear Regulatory Comrission Montpelier, Vermont 05602 631 Park Avenue King of Prussia, Pennsylvania 1o406 John A. P.itscher, Esquire Ropes & Gray 225 Franklin Street l

Boston, Massachusetts 02110

o

)

AGENDA April 10, 1986 Meeting With PD#2 Licensees Room P-118 - Phillips Building Bethesda, Maryland 8:30 INTRODUCTION Daniel R. Muller, Director..BWR PD#2 Robert M. Bernero, Director, DBL TECHNICAL STATUS UPDATE Intergranular Stress Corrosion Cracking - Revision 2 to NUREG-0313 (W. Hazelton)

Permanent Installation of Hydrogen Addition Systems (R.Hermann)

AUTOMATED TRACKING Tracking systems in use by(NRC (G. Gears)

Systems used by Utilities Utility participants)

Benefits of NRC/ Utility corrpatible system (G. Gears)

BREAK LEGAL CONSIDERATIONS Sholly process (J. Scinto) hew exemption rule 10 CFR 50.12(a) [50 FR 50764] (F. Cameron)

Interpretation of 10 CFR 50.59 (J. Scinto) 12:30 LUNCH 2:00 INTEGRATED SCHEDULES Introduction / Background (M.Thadani)

Utility experience (Iowa Electric)

BREAK TECHNICAL SPECIFICATIONS Introduction / Background (G. Rivenbark)

Tech Spec Improvement Program (Georgia Power)

EnergencyTechSpecRequests(G.Rivenbark)

~

CONCLUDINGREMARKS(D.R. Muller) 5:00 CLOSE

-