| 05000341/LER-1997-001, :on 970206,error in Mass Flow Conversion Algorithm in Heat Methodology for Calculating Core Thermal Power Discovered.Caused by Deficiency in Calculation Software.Calculation Will Be Revised |
- on 970206,error in Mass Flow Conversion Algorithm in Heat Methodology for Calculating Core Thermal Power Discovered.Caused by Deficiency in Calculation Software.Calculation Will Be Revised
| |
| 05000341/LER-1997-002, :on 970216,HPCI Sys Pump Discharge Valve Failed to Open.Caused by Failure of Pinion Gear Setscrew.Maint Procedure Controlling Work on Valve Mos Revised,Motor Shaft for Valve E4150-F006,spot Drilled & New Setscrew Installed |
- on 970216,HPCI Sys Pump Discharge Valve Failed to Open.Caused by Failure of Pinion Gear Setscrew.Maint Procedure Controlling Work on Valve Mos Revised,Motor Shaft for Valve E4150-F006,spot Drilled & New Setscrew Installed
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function |
| 05000341/LER-1997-003-01, Forwards LER 97-003-01,which Documents Condition Outside Design Basis Related to EECW Sys Containment Isolation Function.Diverse Power Mod of Eecs Sys Primary Containment Penetrations Have Been Completed | Forwards LER 97-003-01,which Documents Condition Outside Design Basis Related to EECW Sys Containment Isolation Function.Diverse Power Mod of Eecs Sys Primary Containment Penetrations Have Been Completed | |
| 05000341/LER-1997-003, :on 970303,EECW Sys Ci Function Was Outside Design Basis Due to Design Basis Deficiency.Eecw Sys Primary Containment Penetrations Have Been Modified to Provide Diverse Power |
- on 970303,EECW Sys Ci Function Was Outside Design Basis Due to Design Basis Deficiency.Eecw Sys Primary Containment Penetrations Have Been Modified to Provide Diverse Power
| 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition |
| 05000341/LER-1997-004, :on 970304,calibr of Primary Containment Oxygen Monitor Was Noted in de-inerted Environ.Caused by Unanticipated Interaction of Sys Components.Troubleshooting & data-gathering Has Been Performed |
- on 970304,calibr of Primary Containment Oxygen Monitor Was Noted in de-inerted Environ.Caused by Unanticipated Interaction of Sys Components.Troubleshooting & data-gathering Has Been Performed
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
| 05000341/LER-1997-004-01, Forwards LER 97-004-01 Re Calibration of Primary Containment Oxygen Monitor in de-inerted Environment Challenging Operability of Monitor in Inerted Environment | Forwards LER 97-004-01 Re Calibration of Primary Containment Oxygen Monitor in de-inerted Environment Challenging Operability of Monitor in Inerted Environment | 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition |
| 05000341/LER-1997-005, :on 970307,RBCCW to EECW Return & Supply Isolation Valve Interlocks,Installed in EECW Makeup Tank Isolation Valve Circuit Between Dedicated Shutdown Panel & Opening Coil.Caused by Inadequate Design.Revised Procedures |
- on 970307,RBCCW to EECW Return & Supply Isolation Valve Interlocks,Installed in EECW Makeup Tank Isolation Valve Circuit Between Dedicated Shutdown Panel & Opening Coil.Caused by Inadequate Design.Revised Procedures
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
| 05000341/LER-1997-006, :on 970320,response Time Testing Was Not in Conformance W/Ts.Caused by Inadequate Review of Ts.Affected ECCS Actuation Instrumentation Channels Response Time Testing Was Completed on 970326 & 27 |
- on 970320,response Time Testing Was Not in Conformance W/Ts.Caused by Inadequate Review of Ts.Affected ECCS Actuation Instrumentation Channels Response Time Testing Was Completed on 970326 & 27
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
| 05000341/LER-1997-006-01, Forwards LER 97-006-01,re Response Time Testing Not Being Conducted IAW Ts.Rev Provides Revised Dates of non- Compliance Found During Review Being Conducted for Extension of Surveillance Intervals for Current Cycle 6 | Forwards LER 97-006-01,re Response Time Testing Not Being Conducted IAW Ts.Rev Provides Revised Dates of non- Compliance Found During Review Being Conducted for Extension of Surveillance Intervals for Current Cycle 6 | |
| 05000341/LER-1997-007, :on 970325,condition Prohibited by TS Due to Failure of Reactor Building Hvac.East RBHVAC Exhaust & Supply Fans Were Started in Order to Reestablish Secondary Containment Integrity & Failed Solenoid Valve Replaced |
- on 970325,condition Prohibited by TS Due to Failure of Reactor Building Hvac.East RBHVAC Exhaust & Supply Fans Were Started in Order to Reestablish Secondary Containment Integrity & Failed Solenoid Valve Replaced
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
| 05000341/LER-1997-008, :on 970410,discovered Potential Common Mode Failure Mechanism for 480 Volt MCC Disconnect Switches Due to Not Being Fully Latched Due to Inadequate Maint.Cleaned & Lubricated Fused Disconnect Switches |
- on 970410,discovered Potential Common Mode Failure Mechanism for 480 Volt MCC Disconnect Switches Due to Not Being Fully Latched Due to Inadequate Maint.Cleaned & Lubricated Fused Disconnect Switches
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function |
| 05000341/LER-1997-009, :on 970417,literal Wording of TS Requirement Had Not Historically Been Considered Prior to Proceeding Into Operational Conditions 1,2 & 3.Caused by Lack of Clarity in Ts,Ts Bases & Procedures.Revised Procedures |
- on 970417,literal Wording of TS Requirement Had Not Historically Been Considered Prior to Proceeding Into Operational Conditions 1,2 & 3.Caused by Lack of Clarity in Ts,Ts Bases & Procedures.Revised Procedures
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
| 05000341/LER-1997-010, :on 970504,HPCI Auxiliary Oil Pump Failed to Start.Caused by Failure of seal-in Contact in AOP Start Circuitry.Failed Auxiliary Contact Used for seal-in Purposes Has Been Replaced |
- on 970504,HPCI Auxiliary Oil Pump Failed to Start.Caused by Failure of seal-in Contact in AOP Start Circuitry.Failed Auxiliary Contact Used for seal-in Purposes Has Been Replaced
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function |
| 05000341/LER-1997-011, :on 970507,condition Prohibited by Ts,Due to Turbine Stop Valve & Turbine Control Valve Missed Occurred. Caused by Failure to Recognize,During Development of Applicable Surveillance Procedures.Power Verified |
- on 970507,condition Prohibited by Ts,Due to Turbine Stop Valve & Turbine Control Valve Missed Occurred. Caused by Failure to Recognize,During Development of Applicable Surveillance Procedures.Power Verified
| 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications |
| 05000341/LER-1997-012, :on 970603,voluntary Rept Re Surveillance Testing of Recirculation Sys Overspeed Stops Was Performed. Caused by Conflict Re TS SR 4.4.1.1.2.MG Set Mechanical & Electric Stops Adjusted Downward within 4.4.1.1.2 Limits |
- on 970603,voluntary Rept Re Surveillance Testing of Recirculation Sys Overspeed Stops Was Performed. Caused by Conflict Re TS SR 4.4.1.1.2.MG Set Mechanical & Electric Stops Adjusted Downward within 4.4.1.1.2 Limits
| |
| 05000341/LER-1997-013, :on 970619,HPCI Sys Isolation Valve Closed While Performing Surveillance.Caused by Apparent Spurious Closure of Relay Contact.Jumper Installed |
- on 970619,HPCI Sys Isolation Valve Closed While Performing Surveillance.Caused by Apparent Spurious Closure of Relay Contact.Jumper Installed
| 10 CFR 50.73(a)(2)(v), Loss of Safety Function 10 CFR 50.73(a)(2)(iv), System Actuation |
| 05000341/LER-1997-014-01, Forwards LER 97-014-01 Which Addresses Issues Identified as Result of Investigation of Unsealed Penetrations in Auxiliary Bldg.Commitments Made in LER Listed | Forwards LER 97-014-01 Which Addresses Issues Identified as Result of Investigation of Unsealed Penetrations in Auxiliary Bldg.Commitments Made in LER Listed | |
| 05000341/LER-1997-016, :on 961016,ESF Actuation Occurred Due to Loss of Power to DC Bus.Caused by Inadequate Procedure.Test 2A-2 Battery Successfully Completed,Supervisors & Test Crew Counseled & Procedure Revised |
- on 961016,ESF Actuation Occurred Due to Loss of Power to DC Bus.Caused by Inadequate Procedure.Test 2A-2 Battery Successfully Completed,Supervisors & Test Crew Counseled & Procedure Revised
| 10 CFR 50.73(a)(2)(iv), System Actuation |
| 05000341/LER-1997-017, :on 961025,multiple SRVs as-found Settings Were Outside of one-percent Tolerance Allowance Confirmed to Be corrosion-induced Bonding of Pilot Valve Disc & Seat.Pilots Replaced During Extended Fifth Refueling Outage |
- on 961025,multiple SRVs as-found Settings Were Outside of one-percent Tolerance Allowance Confirmed to Be corrosion-induced Bonding of Pilot Valve Disc & Seat.Pilots Replaced During Extended Fifth Refueling Outage
| |