ML20141A074

From kanterella
Jump to navigation Jump to search
Informs That EC Wenzinger Is Branch Chief & TC Elsasser Is Section Chief for Facility Based on Realignment of Projects within Region I Ofc.Realignment Effective on 860331
ML20141A074
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 03/26/1986
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrison R
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
References
NUDOCS 8604040380
Download: ML20141A074 (2)


Text

5

.o

(,

26 MAR 1986 Docket No. 50-443 50-444 -

Public Service of New Hampshire ATTN: Mr. Robert J. Harrison President and Chief Executive Officer P.O. Box 330 Manchester, New Hampshire 03105 Gentlemen:

Subject:

Projects Realignment in Region I The purpose of this letter is to inform you that, due to a realignment of projects within the Region I office, the cognizant Branch Chief and Section Chief for your facility are Mr. Edward C. Wenzinger, Chief, Projects Branch No. 3 and Mr. Thomas C. Elsasser, Chief, Reactor Projects Section 3C.

Mr. Wenzinger can be reached on-215-337-5224 or 5219 and Mr. Elsasser can be reached on 215-337-5235. This realignment will become effective on March 31, 1986.

Sincerely, 1' Oricinal Signea By1 W(0(O Richard Cir1 &

W.n3 Star stecki, Director p Division of Reactor Projects cc: ,

John DeVincentis, Director, Engineering and Licensing .

William B. Derrickson, Senior Vice President Warren Hall, Operational Services Supervisor D. E. Moody, Station Manager Gerald F. Mcdonald, Construction QA Manager Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector State of New Hampshire 8604040300 ADOCK O 860 g43 9 6/ s4 PDR PDR A

0FFICIAL RECORD COPY 328 STAROSTECKI SEABROOK - 0001.0.0 03/03/86

T' Public Service of New Hampshire 2 bcc:

Region I Docket Room (with concurrences)

DRP Section Chief-J. Grant, DRP F D l 1 4ecki/grm

6 OFFICIAL RECORD COPY 328 STAROSTECKI SEABROOK - 0002.0.0-03/03/86