ML20140J168

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-498/86-02 & 50-499/86-02 on 860106-0214 & Notice of Violation
ML20140J168
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 03/28/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20140J172 List:
References
NUDOCS 8604040272
Download: ML20140J168 (3)


See also: IR 05000498/1986002

Text

_

,

a

MAR 2 81986

In Reply Refer to

Dockets: 50-498/86-02

50-499/86-02

Houston Lighting & P'ower Company

ATTN:

J. H. Goldberg

Group Vice President, Nuclear

P. O. Box 1700

Houston, Texas 77001

Gentlemen:

This refers to the inspection conducted by Messrs. C. E. Johnson and

D. L Garrison of this office during the period January 6 - February 14, 1986, of

activities authorized by NRC Construction Permits CPPR-128 and 129 for the South

Texas Project, Units 1 and 2, and to the discussion of our findings with members

of your staff at the conclusion of the inspection.

Areas examined during the inspection included site tours, licensee action on

previous inspection findings, IE Information Notices, structural concrete

activities, structural steel activities, QA (nonconformance reporting), and

safety-related piping. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews with

personnel, and , observations by the inspectors. These findings are documented

in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

.

violation of NRC requirements. Consequently, you are required to respond to

this violation in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Your response should be based on the specifics contained in the Notice of

Violation enclosed with this letter.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, PL 96-511.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

,

e6j 40go g [

8

g g,

O

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosures:

(see next page)

L

,

RI

P B/

C

.L B

hnson/tw

rrison

L

able

JEGagliardo

<

4 ') //f/86 '

S //6 /86

1/lf/86

$ /ib /86

s

'

-;

,

. g --

>

Houston Lighting &' Power Company

-2-

.v

Enclosures:

1.

Appendix A - Notice of Violation

2.

Appendix B - NRC Inspection Report

50-498/86-02

50-499/86-02

cc w/ enclosures:

Houston Lighting & Power Company

-ATTN:

M. Wisenberg, Manager,

. Nuclear Licensing

P. O. Box 1700

Houston,. Texas

77001

i

Brian Berwick, Esquire

Asst. Attorney General

Environmental Protection Div.

P. 0. . Box 12548, Capitol Station

Austin, Texas 78711

. Lanny Alan Sinkin-

Citizens Concerned About

Nuclear Power, Inc.

-Christic Institute

'1324 North Capitol Street

Washington, D.C.

20002

Charles Bechhoefer, Esquire

.

Chairman, Atomic Safety-A Licensing

.'

Board

U.S. Nuclear Regulatory Commission

Washington, DC

20555

Dr. James C. Lamb, III

313 Woodhaven Road

Chapel Hill, North Carolina

27514

Frederick J. Shon

Administrative Law Judge

' Atomic Safety and Licensing Board

U.S. Nuclear Regulatory Commission

Washington, DC_ 20555

"

Ray Goldstein, Esquire

Gray, Allison and Bocker

100 Vaughn Building

807 Brazos

Austin, Texas

78701

Texas Radiation Control Program Director

o

c

-

.

o

. * .

,

,

Houston Lighting & Power Company

-3-

bec to DMB (IE01)

bec distrib. by RIV:

  • RPB -

DRSP

  • Resident Inspector-OPS

R. D. Martin, RA

  • Resident Inspector-CONST.
  • Section Chief (RPB/C)
  • R&SPB
  • MIS SYSTEM
  • RIV File
  • D. Weiss, LFM8 (AR-2015)
  • RSTS Operator

R. Pirfo, ELD

  • R. G. Taylor, RPB/C
  • RSB
  • w/766

.,