ML20140G503
ML20140G503 | |
Person / Time | |
---|---|
Site: | Grand Gulf |
Issue date: | 08/31/1984 |
From: | Kammerer C NRC OFFICE OF CONGRESSIONAL AFFAIRS (OCA) |
To: | Cochran, Dowdy, Markey, Ottinger R, Simpson, Stennis, Udall HOUSE OF REP., HOUSE OF REP., ENERGY & COMMERCE, SENATE |
Shared Package | |
ML20140C950 | List: |
References | |
FOIA-85-186 NUDOCS 8507130235 | |
Download: ML20140G503 (2) | |
Similar Documents at Grand Gulf | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217F8911999-10-13013 October 1999
[Table view]Forwards Copy of FEMA Region IV Final Rept for 990623-24, Grand Gulf Nuclear Station Exercise.Rept Indicates No Deficiencies or Areas Requiring Corrective Action Identified During Exercise ML20216J8891999-10-0404 October 1999 Forwards Details of Existing Procedural Guidance & Planned Administrative Controls.Util Respectfully Requests NRC Review & Approval of Changes by 991020.Date Will Permit to Implement Changes & Realize Full Benefit During Refueling ML20217B0361999-10-0404 October 1999 Refers to Investigation Conducted by NRC OI Re Activities at Grand Gulf Nuclear Station.Investigation Conducted to deter- Mine Whether Security Supervisor Deliberately Falsified Unescorted Access Authorizations.Allegation Unsubstantiated ML20212J8151999-09-29029 September 1999 Forwards Insp Rept 50-416/99-12 on 990725-0904.One Violation Noted & Being Treated as Noncited Violation.Licensee Conduct of Activities at Grand Gulf Facility Characterized by Safety Conscious Operations,Sound Engineering & Maint Practices ML20216J6811999-09-28028 September 1999 Ack Receipt of ,Transmitting Rev 31 to Physical Security Plan for GGNS Under Provisions of 10CFR50.54(p). NRC Approval Not Required,Based on Determination That Changes Do Not Decrease Effectiveness & Limited Review ML20212J7361999-09-28028 September 1999 Forwards Insp Rept 50-416/99-11 on 990830-0903.No Violations Noted.Purpose of Insp to Review Solid Radioactive Waste Management & Radioactive Matl Transportation Programs ML20212J5321999-09-27027 September 1999 Forwards Insp Rept 50-416/99-14 on 990830-0903.No Violations Noted.Inspectors Determined That Radioactive Waste Effluent Releases Properly Controlled,Monitored & Quantified ML20216J8141999-09-26026 September 1999 Forwards Proprietary Renewal Applications for Licensed Operators for Wk Gordon & SA Elliott at Grand Gulf Nuclear Station.Proprietary Info Withheld ML20216J7101999-09-26026 September 1999 Forwards NRC Form 536,in Response to NRC Administrative Ltr 99-03, Preparation & Scheduling of Operator License Examinations ML20212F5521999-09-23023 September 1999 Forwards SER Accepting Util Analytical Approach for Ampacity Derating Determinations at Grand Gulf Nuclear Station,Unit 1 & That No Outstanding Ampacity Derating Issues as Identified in GL 92-08 Noted ML20212D9211999-09-16016 September 1999 Informs That NRC Staff Completed Midcycle PPR of GGNS on 990818 & Identified No Areas in Which Licensee Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through March 2000 Encl ML20212A9331999-09-13013 September 1999 Forwards Partially Withheld Insp Rept 50-416/99-15 on 990816-20 (Ref 10CFR73.21).One Violation of NRC Requirements Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20211P7631999-09-10010 September 1999 Discusses Staff Issuance of SECY-99-204, Kaowool & FP-60 Fire Barriers at Plant.Proposed Meeting to Discuss Subj Issues Will Take Place in Oct or Nov 1999 ML20211Q3471999-09-0909 September 1999 Forwards Federal Emergency Mgt Agency Final Rept for 990623 Plant Emergency Preparedness Exercise.No Deficiencies Noted & One Area Requiring Corrective Action Identified ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211Q3091999-09-0909 September 1999 Forwards Safety Evaluation Accepting BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Dtd July 1996 ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20211Q4861999-09-0808 September 1999 Informs That Util Has Discovered Dose Calculation Utilized non-conservative Geometry Factor for Parameter.Calculation Error Being Evaluated in Accordance with Corrective Action Program ML20211Q0091999-09-0808 September 1999 Forwards Request for Addl Info Re Individual Plant Exam of External Events for Grand Gulf Nuclear Station,Unit 1. Response Requested by 000615 ML20211P4121999-09-0707 September 1999 Requests NRC Staff Review & Approval of Integrated Nuclear Security Plan (Insp) & Integrated Security Training & Qualification Plan (Ist&Q), for Use by All Entergy Operations,Inc.Encl Withheld,Per 10CFR2.790(d) ML20211P4171999-09-0707 September 1999 Ack Receipt of ,Which Transmitted Addendum to Rev 30 to Physical Security Plan for Ggns,Per 10CFR50.54(p).NRC Approval Is Not Required,Since Util Determined That Changes Do Not Decrease Effectiveness of Plan ML20211K5641999-08-31031 August 1999 Forwards Rev 39 to Grand Gulf Nuclear Station Emergency Plan Non-Safety Related, IAW 10CFR50,App E,Section V. Changes Do Not Decrease Effectiveness of Plan & Continues to Meets Stds of 10CFR50.47(b) & Requirements of App E ML20211K6061999-08-31031 August 1999 Informs That Plant Has No Candidates to Take 991006 Generic Fundamentals Exam ML20211J2321999-08-26026 August 1999 Advises That Info Contained in to Support NRC Review of GE Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Will Be Withheld from Public Disclosure ML20211J3761999-08-25025 August 1999 Corrected Ltr Informing That Info Provided (on Computer Disk & in Ltr to Ineel ) Marked as Proprietary Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended.Corrected 990827 ML20211F4881999-08-25025 August 1999 Advises That Info Submitted by 990716 Application & Affidavit Containing Diskette & to Ineel Mareked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20211F7751999-08-24024 August 1999 Forwards Insp Rept 50-416/99-10 on 990809-13.No Violations Noted.Insp Covered Licensed Operator Requalification Program & Observations of Requalification Activities ML20211C4381999-08-20020 August 1999 Forwards Rev 31 to Physical Security Plan for Protection of Grand Gulf Nuclear Station,Iaw 10CFR50.54(p).Util Has Determined That Rev Does Not Decrease Effectiveness of Plan. Encl Withheld,Per 10CFR73.21 ML20211C5101999-08-19019 August 1999 Forwards Certified Copies of Liability Insurance Policy Endorsements Issued in First Half of 1999 for Each Entergy Operations,Inc Nuclear Unit,Per 10CFR140.15 ML20211B3761999-08-16016 August 1999 Submits Voluntary Response to NRC AL 99-02, Operating Reactor Licensing Actions Estimates, for Fys 2000 & 2001, ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20211A9481999-08-12012 August 1999 Informs of Completion of Analysis of Heat Transfer in Cooler During Fan Coast Down & Concludes That Potential Exists for Steam Foundation,Under Conditions Where Dcw Sys Flow Is Lost Prior to Full Isolation Valve Closure ML20210P8411999-08-0909 August 1999 Forwards Insp Rept 50-416/99-09 on 990613-0724.No Violations Noted.Activities at Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML20210N6401999-08-0303 August 1999 Informs That Eighteeen Identified Penetrations Will Be Restored to Conformance with Licensing Requirements Prior to Restart from RFO10,scheduled for Fall 1999,per GL 96-06. Example of Piping Analysis Being Performed,Encl ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20211K7491999-07-30030 July 1999 Forwards Ltr Rept Documenting Work Completed Under JCN-W6095,analyses Performed at Ineel to Calculate Minimum Time to Fuel Pin Failure in Boiling Water Reactors (BWR) ML20210K1951999-07-30030 July 1999 Forwards Insp Rept 50-416/99-03 on 990405-08 & 0510-11.No Violations Identified ML20210K6661999-07-29029 July 1999 Forwards Fitness for Duty Program Performance six-month Rept for Period Covering Jan-June 1999,per 10CFR26.71 ML20210F3591999-07-26026 July 1999 Forwards Proprietary Version & Redacted Version of Wyle Test Rept M-J5.08-Q1-45161-0-8.0-1-0,re Pressure Locking & Thermal Binding Test Program.Proprietary Version Withheld ML20210E3251999-07-23023 July 1999 Forwards Insp Rept 50-416/99-07 on 990622-25.No Violations Noted.Emergency Plan & Procedures During Biennial Emergency Preparedness Exercise Was Conducted ML20210D2401999-07-21021 July 1999 Informs of Resignation of Operator WE Griffith,License OP-20806-1,from Entergy Operations,Inc ML20209J0311999-07-16016 July 1999 Forwards Proprietary Info Supporting Review of Generic Alternate Source Term Request.Proprietary Info Withheld Per 10CFR2.790 ML20209G4791999-07-15015 July 1999 Forwards Proposed Emergency Plan Change as Addendum to Changes Previously Submitted Via GNRO-98/00028 & GNRO-99/00007,for NRC Review & Approval ML20210B1031999-07-15015 July 1999 Forwards Insp Rept 50-416/99-08 on 990502-0612.Determined That Three Severity Level IV Violations Occurred & Being Treated as Noncited Violations ML20210H3211999-07-14014 July 1999 Forwards Proprietary Info Supporting Review of 970506 Submittal of BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic Bwr. Proprietary Info Withheld Per 10CFR2.790 ML20209D7511999-07-0909 July 1999 Responds to RAI on GL 92-01,rev 1,suppl 1, Rv Structural Integrity. as Result of NRC Review of Util Responses,Info Revised in Rvid & Rvid Version 2 Will Be Released ML20209D7671999-07-0101 July 1999 Submits Response to Violations Noted in Insp Rept 50-416/99-02 on 990222-26 & 0308-12.Corrective Actions: Contractor Performance Has Been re-evaluated in Regards to UFSAR Reviews ML20196K4901999-07-0101 July 1999 Discusses Relief Requests PRR-E12-01,PRR-E21-01,PRR-E22-01, PRR-P75-01,PRR-P81-01,VRR-B21-01,VRR-B21-02,VRR-E38-01 & VRR-E51-01 Submitted by EOI on 971126 & 990218.SE Accepting Alternatives Proposed by Util Encl ML20209B6081999-06-30030 June 1999 Submits Response to NRC GL 98-01,Suppl 1, Y2K Readiness of Computer Sys at Nuclear Power Plants. Disclosure Encl 1999-09-09 Category:NRC TO U.S. CONGRESS MONTHYEARML20137P5121986-01-24024 January 1986
[Table view]Provides Info Concerning Financial Qualifications of Utils Re Safety of Plants.Nrc Regulation of Commercial Nuclear Power Based on Responsibility of Licensees for Safe Operation.Addl Views of Asselstine Encl ML20141K3511986-01-15015 January 1986 Responds to Re Jg Martinez 851115 Questions Concerning 851107 Failure of Diesel Engine & Speed Control. Staff Recommended That Enhanced Maint & Surveillance Program Needed to Assure Reliability of Delaval Diesel Engines ML20148H3441985-10-25025 October 1985 Forwards Unexpurgated Rept from Ofc of Inspector & Auditor Re Investigation of Regulatory Performance of Region II Ofc Concerning Facilities.W/O Encl ML20211G2531985-10-0101 October 1985 Informs That 841019 Rept of Ofc of Inspector & Auditor, Including Transmittal Memo & Encl to ,May Be Released Based on NRC & Justice Dept Conclusion of Investigation ML20140H6461985-06-0404 June 1985 Forwards Press Release 85-80 Re NRC Proposed Civil Penalty in Amount of $500,000 Aginst Util for Alleged Matl False Statements Made to NRC Concerning Operator Qualifications & Training ML20140H8731985-03-22022 March 1985 Forwards Proposed Enforcement Action Against Util for Violations Involving Matl False Statements Re Tech Specs ML20140H8601985-03-22022 March 1985 Forwards Press Release 85-48 Re NRC Proposed Fine Against Util Concerning Five Alleged Matl False Statements in Development of Tech Specs Governing Facility Operation ML20140H9721984-09-25025 September 1984 Responds to Request for All Errors Committed by Util in Application for License.Partial List of False Matl Statements Should Be Available ML20148G3841984-09-20020 September 1984 Forwards Transcript of Commission 840601 Meeting Re Plant That Plaine Promised Sieberling.W/O Encl ML20098B0571984-09-13013 September 1984 Forwards Responses to 840726 Request to Suppl Record of 840724 Hearing ML20140G5031984-08-31031 August 1984 Forwards Announcement That on 840831,NRR Amended License NPF-29 to Authorize Full Power Operation IA-85-186, Forwards Announcement That on 840831,NRR Amended License NPF-29 to Authorize Full Power Operation1984-08-31031 August 1984 Forwards Announcement That on 840831,NRR Amended License NPF-29 to Authorize Full Power Operation ML20133D6281984-08-24024 August 1984 Forwards Transcript of NRC 840731 Closed Meeting Re Facility.Matters Referred to DOJ for Evaluation of Prosecutive Merit.Documents Should Be Held in Confidence. W/O Encls ML20133D6071984-07-23023 July 1984 Forwards Ofc of Investigation Rept Re Possible Falsification of Mechanical Maint Training Records at Facility.Matter Referred to DOJ for Evaluation.Rept Should Be Held in Confidence.W/O Encl ML20140G4921984-06-29029 June 1984 Responds to Advising That NRC Draft Answers to 840313 Questions Re Facility Will Be Released.Draft Constitutes Opinions on How Commission Should Respond & Is Predecisional.Responses Should Be Withheld from Public ML20126D3631984-06-29029 June 1984 Responds to Indicating Plan to Release NRC Draft Answers to Questions Re Plant.Releasing Draft Response to Public Would Be Confusing Since Commission Developing Complete Response Which Will Be Provided by mid-Jul ML20140C9441984-06-20020 June 1984 Forwards Supplemental Info to Author Re License Conditions & Surveillance Procedures,Operator Qualifications & Drywell Cooling Sys ML20133D5931984-06-15015 June 1984 Forwards SECY-84-209,per 840611 Request.Paper Not Yet Acted on by Commission.Document Should Be Restricted to Subcommittee.W/O Encl ML20133D5771984-06-0808 June 1984 Forwards Ofc of Investigation Rept Re Possible Falsification of Operator Qualifications,Per 840313 Request. Matter Referred to DOJ for Evaluation of Prosecutorial Merit.W/O Encl ML20126D3221984-05-29029 May 1984 Urges Congress to Maintain Close Oversight of NRC Activities to Keep Sys of Safety Regulations from Unraveling.Situation at Plant Aggravated by NRC Decision to Authorize Plant to Operate for Wks While Diesel Generators Dismantled ML20140G4761984-05-25025 May 1984 Forwards NRC Documents Subj to Congressman Markey 840313 Request.Documents Not Reviewed for Release to Public.W/O Encl ML20133B4431984-04-0606 April 1984 Responds to Re Deficiencies & Errors in License Application.Confirmation of Action Ltr Issued in Oct 1982 to Resolve Deficiencies in Surveillance Procedures & Tech Specs Prior to Proceeding W/Low Power Testing ML20140G4631983-12-21021 December 1983 Forwards Announcement of Proposed $12,000 Civil Penalty Against Util for Failure to Follow Proper Procedures During Maint & Temporary Mod on Emergency Diesel Generator Damaged by Small Fire on 830904 ML20140G4561983-08-25025 August 1983 Forwards Announcement That Proposed Civil Penalty Against Util Reduced to $20,000 ML20140G4511983-06-14014 June 1983 Forwards Announcement of Proposed $40,000 Civil Penalty Against Util for Alleged Noncompliance W/Security Requirements ML19310A7621980-06-0303 June 1980 Forwards DOJ Containing Atty General Advice That No Antitrust Hearing Is Necessary for Proposed Amend to CP ML19261E7891979-07-12012 July 1979 Responds to Re Delay in Issuance of Ol.Tmi Accident Consumes Managerial & Technical Resources.Priority of Review Is Assigned by Estimated Date of Completion of Const ML19207C4911979-07-12012 July 1979 Responds to Re Delay in Issuance of Ol.Tmi Accident Consumes Managerial & Technical Resources. Priority of Review Is Assigned by Estimated Date of Completion of Const ML19247A3801979-06-29029 June 1979 Responds to Re Delays in Processing & Issuance of OL for Facilities.As Result of TMI Accident,Nrc Resources Have Been Diverted from Previous Work.Ol Reviews Suspended, Since Subj Facilities Do Not Qualify for Priority Treatment ML19242A1021979-06-29029 June 1979 Responds to Re Delays in Processing & Issuance of OL for Facilities.As Result of TMI Accident,Nrc Resources Have Been Diverted from Previous Work.Ol Reviews Suspended, Since Subj Facilities Do Not Qualify for Priority Treatment ML19242A0441979-06-29029 June 1979 Responds to Re Delays in Processing & Issuance of OL for Facilities.As Result of TMI Accident,Nrc Resources Have Been Diverted from Previous Work.Ol Reviews Suspended, Since Subj Facilities Do Not Qualify for Priority Treatment 1986-01-24 Category:OUTGOING CORRESPONDENCE MONTHYEARML20217F8911999-10-13013 October 1999
[Table view]Forwards Copy of FEMA Region IV Final Rept for 990623-24, Grand Gulf Nuclear Station Exercise.Rept Indicates No Deficiencies or Areas Requiring Corrective Action Identified During Exercise ML20217B0361999-10-0404 October 1999 Refers to Investigation Conducted by NRC OI Re Activities at Grand Gulf Nuclear Station.Investigation Conducted to deter- Mine Whether Security Supervisor Deliberately Falsified Unescorted Access Authorizations.Allegation Unsubstantiated ML20212J8151999-09-29029 September 1999 Forwards Insp Rept 50-416/99-12 on 990725-0904.One Violation Noted & Being Treated as Noncited Violation.Licensee Conduct of Activities at Grand Gulf Facility Characterized by Safety Conscious Operations,Sound Engineering & Maint Practices ML20212J7361999-09-28028 September 1999 Forwards Insp Rept 50-416/99-11 on 990830-0903.No Violations Noted.Purpose of Insp to Review Solid Radioactive Waste Management & Radioactive Matl Transportation Programs ML20216J6811999-09-28028 September 1999 Ack Receipt of ,Transmitting Rev 31 to Physical Security Plan for GGNS Under Provisions of 10CFR50.54(p). NRC Approval Not Required,Based on Determination That Changes Do Not Decrease Effectiveness & Limited Review ML20212J5321999-09-27027 September 1999 Forwards Insp Rept 50-416/99-14 on 990830-0903.No Violations Noted.Inspectors Determined That Radioactive Waste Effluent Releases Properly Controlled,Monitored & Quantified ML20212F5521999-09-23023 September 1999 Forwards SER Accepting Util Analytical Approach for Ampacity Derating Determinations at Grand Gulf Nuclear Station,Unit 1 & That No Outstanding Ampacity Derating Issues as Identified in GL 92-08 Noted ML20212D9211999-09-16016 September 1999 Informs That NRC Staff Completed Midcycle PPR of GGNS on 990818 & Identified No Areas in Which Licensee Performance Warranted Insp Beyond Core Insp Program.Details of Insp Plan Through March 2000 Encl ML20212A9331999-09-13013 September 1999 Forwards Partially Withheld Insp Rept 50-416/99-15 on 990816-20 (Ref 10CFR73.21).One Violation of NRC Requirements Occurred & Being Treated as Ncv,Consistent with App C of Enforcement Policy ML20211P7631999-09-10010 September 1999 Discusses Staff Issuance of SECY-99-204, Kaowool & FP-60 Fire Barriers at Plant.Proposed Meeting to Discuss Subj Issues Will Take Place in Oct or Nov 1999 ML20211Q3471999-09-0909 September 1999 Forwards Federal Emergency Mgt Agency Final Rept for 990623 Plant Emergency Preparedness Exercise.No Deficiencies Noted & One Area Requiring Corrective Action Identified ML20212A8341999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211Q3091999-09-0909 September 1999 Forwards Safety Evaluation Accepting BWROG Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Dtd July 1996 ML20212A6951999-09-0909 September 1999 Requests That Licensees Affected by Kaowool Fire Barriers Take Issue on Voluntary Initiative & Propose Approach for Resolving Subj Issues.Staff Plans to Meet with Licensees to Discuss Listed Topics ML20211Q0091999-09-0808 September 1999 Forwards Request for Addl Info Re Individual Plant Exam of External Events for Grand Gulf Nuclear Station,Unit 1. Response Requested by 000615 ML20211N4301999-09-0808 September 1999 Discusses Proposed Meeting to Discuss Kaowool Fire Barriers. Staff Requesting That Affected Licensees Take Issue on Voluntary Initative & Propose Approach for Resolving Issues ML20211P4171999-09-0707 September 1999 Ack Receipt of ,Which Transmitted Addendum to Rev 30 to Physical Security Plan for Ggns,Per 10CFR50.54(p).NRC Approval Is Not Required,Since Util Determined That Changes Do Not Decrease Effectiveness of Plan ML20211J2321999-08-26026 August 1999 Advises That Info Contained in to Support NRC Review of GE Rept, Prediction of Onset of Fission Gas Release from Fuel in Generic BWR, Will Be Withheld from Public Disclosure ML20211F4881999-08-25025 August 1999 Advises That Info Submitted by 990716 Application & Affidavit Containing Diskette & to Ineel Mareked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 ML20211J3761999-08-25025 August 1999 Corrected Ltr Informing That Info Provided (on Computer Disk & in Ltr to Ineel ) Marked as Proprietary Will Be Withheld from Public Disclosure Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended.Corrected 990827 ML20211F7751999-08-24024 August 1999 Forwards Insp Rept 50-416/99-10 on 990809-13.No Violations Noted.Insp Covered Licensed Operator Requalification Program & Observations of Requalification Activities ML20211A9501999-08-12012 August 1999 Discusses 990720-21 Workshop Conducted in Region IV Ofc,Re Exchange of Info in Area of Use of Risk Insights in Regulatory Activities.List of Attendees,Summary of Topic & Issues,Agenda & Copies of Handouts Encl ML20210P8411999-08-0909 August 1999 Forwards Insp Rept 50-416/99-09 on 990613-0724.No Violations Noted.Activities at Facility Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML20210L1461999-08-0303 August 1999 Informs That NRC Plans to Administer Gfes of Written Operator Licensing Exam on 991006.Requests Submittal of Ltr Identifying Individuals Taking Exam,Personnel Allowed Access to Exams & Mailing Address for Exams ML20210K1951999-07-30030 July 1999 Forwards Insp Rept 50-416/99-03 on 990405-08 & 0510-11.No Violations Identified ML20210E3251999-07-23023 July 1999 Forwards Insp Rept 50-416/99-07 on 990622-25.No Violations Noted.Emergency Plan & Procedures During Biennial Emergency Preparedness Exercise Was Conducted ML20210B1031999-07-15015 July 1999 Forwards Insp Rept 50-416/99-08 on 990502-0612.Determined That Three Severity Level IV Violations Occurred & Being Treated as Noncited Violations ML20209D7511999-07-0909 July 1999 Responds to RAI on GL 92-01,rev 1,suppl 1, Rv Structural Integrity. as Result of NRC Review of Util Responses,Info Revised in Rvid & Rvid Version 2 Will Be Released ML20196K4901999-07-0101 July 1999 Discusses Relief Requests PRR-E12-01,PRR-E21-01,PRR-E22-01, PRR-P75-01,PRR-P81-01,VRR-B21-01,VRR-B21-02,VRR-E38-01 & VRR-E51-01 Submitted by EOI on 971126 & 990218.SE Accepting Alternatives Proposed by Util Encl ML20196J5811999-06-30030 June 1999 Advises That Version of Info Submitted in 990504 Application & Affidavit Re Engineering Rept ME-98-001-00,marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954 as Amended ML20196J5711999-06-30030 June 1999 Advises That Versions of Submitted Info in 990506 Application & Affidavit, Re Proposed Amend to Revise Ts,Marked Proprietary Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA ML20195G2971999-06-0909 June 1999 Ack Receipt of Re Emergency Plan Procedure 10-S-01-1,rev 104.No Violations Identified & Changes Subject to Insp to Confirm Effectiveness ML20195G3511999-06-0909 June 1999 Ack Receipt of 980831 & 1022 Ltrs,Which Transmitted Changes to Grand Gulf Emergency Plan,Rev 36 & 37,under Provisions of 10CFR50,App E,Section V ML20195G3811999-06-0909 June 1999 Ack Receipt of ,Which Transmitted Emergency Plan Procedure 10-S-01-1,Rev 103,under Provisions of 10CFR50, App E,Section V ML20207D3351999-05-27027 May 1999 Forwards Insp Rept 50-416/99-05 on 990321-0501.Three Violations of NRC Requirements Occurred & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20207A6961999-05-21021 May 1999 Forwards Insp Rept 50-416/99-06 on 990419-23.No Violations Noted.Determined That Fire Protection Program Was Implemented IAW Requirements of License & GL 86-10.One Unresolved Item Noted Re fire-induced Failures on Equipment ML20206U3851999-05-18018 May 1999 Forwards Insp Rept 50-416/99-02 on 990222-26 & 0308-12.Two Violations of NRC Requirements Identified & Being Treated as non-cited Violations,Consistent with App C of Enforcement Policy ML20207A7561999-05-17017 May 1999 Ack Receipt of Which Transmitted Exercise Scenario for Emergency Plan Exercise Scheduled for 990623. Some Parts of Exercise Scenario Package Not Submitted & Being Developed ML20206N3921999-05-11011 May 1999 Informs of Reorganization in NRR Ofc,Effective 990328. Organization Chart Encl ML20206K1261999-05-0707 May 1999 Informs That on 990407 NRC Administered Gfes of Written Operator Licensing Exam.Facility Did Not Participate in Exam.Copy of Master Exam with Answer Key Encl.Without Encl ML20206E0571999-04-29029 April 1999 Discusses EOI 960418 Request for License Amend for GGNS That Would Permit Addl Method of Fuel Movement & Loading in Core When Control Rods Removed.Determined That Insufficient Info Provided to Permit Completion of Review ML20206B0951999-04-23023 April 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-416/99-01 & NOV .Reply Found to Be Responsive to Concerns Raised in Nov.Implementation of C/As Will Be Reviewed in Future Insps ML20206B3601999-04-23023 April 1999 Forwards Insp Rept 50-416/99-04 on 990131-0320.Three Violations of NRC Requirements Identified & Being Treated as non-cited Violations Consistent with App C of Enforcement Policy ML20206E7661999-04-19019 April 1999 Submits Summary of 990415 Meeting Conducted in Port Gibson, Mi Re Results of Plant Performance Review Completed on 990211 & Transmitted on 990319.List of Attendees Encl ML20205N7251999-04-13013 April 1999 Forwards Summary of 990408 Meeting with EOI in Jackson, Mississippi Re EOI Annual Performance Assessment of Facilities & Other Issues of Mutual Interest.List of Meeting Attendees & Licensee Presentation Slides Encl ML20205M9421999-04-13013 April 1999 Forwards Emergency Response Data System Implementation Documents.Data Point Library Updates for Kewaunee (271), San Onofre (272) & Clinton (273) Encl.Also Encl Plant Attribute Library Update for Grand Gulf (274).Without Encls IR 05000416/19980131999-04-0606 April 1999 Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in Insp Rept 50-416/98-13 .Discussions on 990330 Resulted in Addl C/A Commitments to Address Violation Re Onsite Investigation ML20205J1051999-03-29029 March 1999 Forwards Objectives for Plant,Unit 1 1999 FEMA Emergency Plan Exercise Scheduled for 990623 ML20205E8701999-03-19019 March 1999 Advises of Completion of Plant Performance Review on 990211 to Develop Integrated Understanding of Safety Performance. Overall Performance Acceptable.Isolated Examples of Failure to Follow Procedures Noted ML20207L3621999-03-0303 March 1999 Advises That Effective 990217,NRC Project Mgt Responsibilities for Grand Gulf Nuclear Station Transferred to Sp Sekerak 1999-09-09 |
Text
r
' 9 an;9'o, gj UNITED STATES g
g NUCLEAR REGULATORY COMMISSION t
a wAsamorow, o. c.nosss 4
\\,
/
of,,
August 31, 1984
.o \\
p 1
/
i The Honorable Richard L. Ottinger, Chairman Subcomittee on Energy Conservation and Power Comittee on Energy and Commerce United States House of Representatives Washington, DC 20515
Dear Mr. Chairman:
Enclosed for your information is an announcement that the Nuclear Regulatory Comission's Office of Nuclear Reactor Regulation on August 31 amended the operating license held by Mississippi Power
& Light Company and other owners to authorize full power operation of Unit 1 of the Grand Gulf Nuclear Station.
It is planned to mail this information to the news media today, August 31, 1984.
Sincerely, Carlton Kamerer, Director Office of Congressional Affairs
Enclosure:
As stated cc:
Rep. Carlos Moorhead IDENTICAL LETTER SENT T0:
Sen. Simpson/cc: Sen. Hart l
Rep. Udall/cc:
Rep. Lujan Rep. Markey/cc: Rep. Marlenee,[.26' Sen. Cochran Sen. Stennis Rep. Dowdy lIYyr 4] - V,j[
8507130235 850426
<r /
CUNNING 85-186 PDR Rep. Bevill/cc:
Rep. Myers
^~>..KE({,1,ac
~ = >
- "c>.... !.31184 8
/"" %
~
UNITED STATES f.'
d I,,;
NUCLEAR REGULATORY COMMISSION
'sk).j/
Office of Putdic Affairs W35-n, D.C. 20555 No.84-106 FOR IMMEDIATE RELEASE Tel. 301/492-7715 (Frfday, August 31,1984)
NRC AUTHORIZES FULL POWER OPERATION OF GRAND GULF NUCLEAR PLANT IN MISSISSIPPI The Nuclear Regulatory Commission Office of Nuclear Reaccor Regulation on August 31 amended the operating license held by Mississippi Power &
Light Company and other owners to authorize full pcwer operation of Unit 1 of the Grand Gulf Nuclear Station located in Claibornt! County, Mississippi. The other owners are Middle South Energy, Inc. and South Mississippi Electric Power Association.
Grand Gulf Unit 1 uses a boiling water reactor and at full power will have a net electrical output of about 1250 megawatts. The plant is located on the east bank of the Mississippi River, about six miles northwest of Port Gibson and 25 miles south of Vicksburg.
On June 16, 1982, the NRC Staff issued a license which permitted fuel loading and low power testing up to five percent of full power. Since that time the licensee has been addressing a number of issues preparatory to obtaining a full power license.
Included were modifications to the plant because of design deficiencies identified during testing; extensive review and corrective action relating to the technical specifications for operating the plant; assuring appropriate qualification of a sufficient number of reactor operators, and the reliability of the emergency diesel generators.
Full power operation requires the approval of the Commission itself which was granted on July 31 following a favorable recommendation by the NRC Staff.
l l
l l
l l