Forwards Interim Safety Evaluation Re Tech Specs Requested Per Generic Ltr 83-36.Plant Tech Specs Already Meet Intent of Generic Ltr Re NUREG-0737,Items II.B.1,II.B.3,II.F.1.6 & III.D.3.4
ML20140G135
Person / Time
Site: Pilgrim
Issue date: 07/05/1985
From: Vassallo D
Office of Nuclear Reactor Regulation
To: Harrington W
BOSTON EDISON CO.
Shared Package
ML20140G141 List:
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.B.1, TASK-2.B.3, TASK-2.F.1, TASK-3.D.3.4, TASK-TM GL-83-36, NUDOCS 8507120489
Download: ML20140G135 (3)


Text

.

e .

Docket No. 50-293 1

Mr. William D. Harrington Senior Vice President, Nuclear Boston Edison Company 800 Boylston Street Boston, Massachusetts 02199

Dear Mr. Harrington:

SUBJECT:

GENERIC LETTER 83-36, NUREG-0737 TECHNICAL SPECIFICATIONS Re: Pilgrim Nuclear Power Station, Unit 1 The Commission's Generic Letter 83-36 (GL 83-36) dated November 1,1983, provided model Technical Specifications relative to implementation of certain TMI Action Plan (NUREG-0737) requirements. By letter dated August 9,1984, amended by letters dated September 21, and October 19, 1984, you submitted proposed changes in the Pilgrim Station Technical Specifications, NUREG-0737 Items II.F.1-1, 3, 4 and 5. These changes were authorized by Amendment No. 83 to Facility Operating License No. DPR-35 on November 7, 1984.

The remaining NUREG-0737 items addressed by GL 83-36 were the subject of your letters dated February 3,1984, April 11, and May 28, 1985. From review of those letters, we have concluded that Pilgrim's present Technical Specifications already meet the intent of the generic letter with respect to NUREG-0737 Items II.B.1, II.F.1.6 and III.D.3.4. The enclosed Interim Safety Evaluation supports this conclusion.

Your letter of May 28, 1985 also indicated that II.B.3 (Post-Accident Sampling) and II.F.1-2 (Sampling and Analysis of Plant Effluents) are adequately covered by License Condition 3.1 and the present Technical Specification Section 6.8.A. As indicated by the Interim Safety Evaluation, we do not find this to be the case and we request that you reconsider the model Technical Specification for these two items in GL 83-36.

4

^

8507120489 850705 PDR ADOCK 05000293 P PDR

a .

Mr. William D. Harrington Please respond to this request within 60 days of receipt of this letter.

The reporting and/or recordkeeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.

Sincerely.

Original signed by/

Domenic B. Vassallo, Chief Operating Reactors Branch #2 Division of Licensing

Enclosure:

As stated cc w/ent.losure:

See next page DISTRIBUTION

' Docket File NRC'PDR"~~

Local PDR ORB #2 Reading HThompson OELD SNorris PLeech ELJordan JPartlow BGrimes ACRS(10)

Gray File GHolahan CPatel DL:

SNo

  1. 2 DL:0RB#2 jnPle h Mb GHolahan DL:0RB#2 07/.5/85 07/ /85 hDVassallo 07/f/85 07/f/85

0 ..

Mr. William D. Harrington Boston Edison Company Pilgrim Nuclear Power Station

! CC:

Mr. Charles J. Mathis, Station Mgr. Thomas A. Murley J Boston Edison Company Regional Administrator RFD #1, Rocky Hill Road Region I Office Plymouth, Massachusetts 02360 U. S. Nuclear Reculatory Commission 631 Park Avenue Resident Inspector's Office King of Prussia, Pennsylvania 10406 U. S. Nuclear Regulatory Commission Post Office Box 867 Mr. A. Victor Morisi Plymouth, Massachusetts 02360 Boston Edison Company 25 Braintree Hill Park Mr. David F. Tarantino Rockdale Street Chairman, Board of Selectman Braintree, Massachusetts 02184 11 Lincoln Street Plymouth, Massachusetts 02360 Office of the Commissioner Massachusetts Department of Environmental Quality Engineering One Winter Street Boston, Massachusetts 0?108 Office of the Attorney General 1 Ashburton D' e 19th Floo-Boston, Mas Jsetts 07108 Mr. Robert M. Hallisey, Director Radiation Control Program Massachusetts Department of Public Health 150 Tremont Street Boston, Massachusetts 02111