ML20140F920
| ML20140F920 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 03/24/1986 |
| From: | Gagliardo J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Goldberg J HOUSTON LIGHTING & POWER CO. |
| Shared Package | |
| ML20140F924 | List: |
| References | |
| NUDOCS 8604010223 | |
| Download: ML20140F920 (3) | |
See also: IR 05000498/1986001
Text
,.
-
.
,
In Reply Refer To:
MAR NM
Dockets: 50-498/86-01
E0-499/86-01
Houston Lighting & Power Company
ATTN:
J. H. Goldberg, Group Vice
President
P. O. Box 1700
Houston, Texas 77001
Gentlemen:
This refers to the inspection conducted by Messrs. L. D. Gilbert and J. I. Tapia
of this office during the period January 6 - February P.8, 1986, of activities
authorized by NRC Construction Permits CPPR-128 and 129 for South Texas Project
Units 1 and 2, and to the discussion of our findings with Mr. J. E. Geiger, and
other members of your staff at the conclusion of the inspectbn.
Areas examined during the inspection included design and construction deficiencies
and welding of safety-related reactor components and piping systems. Within these
areas, the inspection consisted of selective examination of procedures' and
representative records, interviews with personnel, and observations by the
inspectors. These findings are documented in the enclosed inspection report.
During this inspection, it was found that certain of your activit'ies were in
violation of NRC requirements. Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Your response should be based on the specifics contained in the Notice of
Violation enclosed with this letter.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this inspection, we will be Meased to
discuss them with you.
Sincerely,
/Hal)
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
(see next page)
RIV:RSB/ES
ES g-
RP
LDGilbert/tw
JITahTa
REIr and
LCo
able LDRHunter JEC agliard
/7/ 1
E,l ' N
f
g \\
ff 3 w/86
yfpl86
3 g /86
$l2b/86
3 /)3/86
3ll2,/86
/
/
/
8604010223 e60324
ADOCK 05000498
G
.
_ - - - - . .
_
. _ .
a
..
_.
_
.
.
.
Houston Lighting & Power Company
-2-
Enclosures:
1.
Appendix A - Notice of Violation -
2.
Appendix B - NRC Inspection Report
50-498/86-01
50-499/86-01
cc w/ enclosures:
Houston Lighting & Power Company
ATTN:
M. Wisenberg, Manager,
Nuclear Licensing
P. O. Box 1700
Houston, Texas
77001
Brian Berwick, Esquire
Asst. Attorney General
Environmental Protection Div.
P. O. Box 12548, Capitol Station
.Lanny Alan Sinkin
Citizens Concerned About
Nuclear Power, Inc.
-Christic Institute
1324 North Capitol Street
Washington, D.C.
20002
Charles Bechhoefer, Esquire
Chairman, Atomic Safety & Licensing
Board
U.S. Nuclear Regulatory Commission
Washington, DC 120555
Dr. James C. Lamb, III
313 Woodhaven Road
Chapel Hill, North Carolina
27514
Frederick J. Shon
Administrative Law Judge
Atomic Safety and Licensing Board
U.S. Nuclear Regulatory Commission
20555
Ray Goldstein, Esquire
Gray, Allison and Becker
100 Vaughn Building
807 Brazos
78701
Texas Radiation Control Program Director
,
_
.
.
__ _
-_ _ , _ . _
..
.
Houston Lighting & Power Company
-3-
bec to DMB (IE01)
bec distrib. by RIV:
- RPB-
'DRSP
- Resident Inspector-0PS
R. D. Martin, P,A
- Resident Inspector-CONST.
- Section Chief (RPB/C)
- R&SPB
- MIS SYSTEM
- RIV File
- D
Weiss, LFMB (AR-2015)
- RSTS Operator
R. Pirfo, ELD
- R. G. Taylor, RPB/C -
- RSB
L. Gilbert
J..Tapia
~*w/766