Forwards Insp Rept 50-382/85-33 on 851201-31 & Notice of Violation.Requests Response Addressing Reason That Measuring & Test Equipment Program Inadequately Accommodated Need to Calibr Radiologically Contaminated Test Equipment
ML20140E322
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/29/1986
From: Gagliardo J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Leddick R
LOUISIANA POWER & LIGHT CO.
Shared Package
ML20140E326 List:
References
NUDOCS 8602030225
Download: ML20140E322 (2)


See also: IR 05000382/1985033

Text

. .

l

l

'

JAN 2 S EC

In Reply Refer To:

Docket: 50-382/85-33

Louisiana Power & Light Company

ATTN: R. S. Leddick, Sr. Vice President

Nuclear Operations

142 Delaronde Street

New Orleans, Louisiana 70174

Gentlemen:

This refers to the inspection conducted by Messr. J. G. Luehman of this office

during the period December 1-31, 1985, of activities authorized by NRC

Operating License NPF-38 for Waterford Steam Electric Station, Unit 3, and to

the discussions of our findings with Mr. R. P. Barkhurst and other members of

your staff at the conclusion of the inspection. .

Areas examined during the inspection included plant status, routine inspection,

monthly maintenance, monthly surveillance, ESF system walkdown, station

emergency plan, cold weather preparation, and license conditions. Within these

areas, the inspection consisted of selective examination of procedures and

representative records, interviews with personnel, and observations by the

inspector. These findings are documented in the enclosed inspection report.

During this inspection, it was found that certain of your activities were in

violation of NRC requirements. Consequently, you are required to respond to

this violation, in writing, in accordance with the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Your response should be based on the specifics contained in the

Notice of Violation enclosed with this letter. Also, address the reason that

your Measuring and Test Equipment Program has apparently not adequately

accommodated the need to calibrate test equipment that is radiologically

contaminated.,

One unresolved item was identified in paragraph 4 of the enclosed inspection

report.

The response directed by this letter and the accompanying Notice is not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Action of 1980, PL 96-511.

R1 R / RPB

[JG man /r1 l able JGag 'do

1/23/86 1 23/86 1/97 y

g2030225G60129 \

o ADocg oso00302 ;ni

PDR JV

V l

-. ,

Louisiana Power & Light Company -2-

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Original Signed By

J. E. Gagliardo

J. E. Gagliardo, Chief

Reactor Projects Branch

Enclosures:

1. Appendix A - Notice of Violation

2. Appendix B - NRC Inspection Report

50-382/85-33

cc w/ enclosures:

Louisiana Power & Light Company

ATTN: G. E. Wuller, Onsite

Licensing Coordinator

P. O. Box 0

Killona, Louisiana 70066

Middle South Services

ATTN: Mr.' R. T. Lally

P. O. Box 6100

New Orleans, Louisiana 70161

Lousiana Power & Light Company

ATTN: R. P. Barkhurst, Plant Manager

P. O. Box B

Killona, Louisiana 70066

Louisiana Power & Light Company

ATTN: K. W. Cook, Nuclear Support

and Licensing Manager

142 Delaronde Street

New Orleans, Louisiana 70174

Louisiana Radiation Control Program Ofrector

bec to DMB (IE01)

bec distrib. by RIV

  • RPB D. Powers, E0
  • Resident Inspector R. D. Martin, RA
  • Section Chief (RPB/C) DRSP
  • EP&RPB *RIV File
  • MIS System D. Crutchfield, NRR
  • RSTS Operator RSB
  • 766