Forwards Insp Rept 50-322/84-46 on 841203-07 & Notice of Deviation
ML20140E178
Person / Time
Site: Shoreham File:Long Island Lighting Company icon.png
Issue date: 12/21/1984
From: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Leonard J
LONG ISLAND LIGHTING CO.
Shared Package
ML20140E184 List:
References
NUDOCS 8501100605
Download: ML20140E178 (3)


See also: IR 05000322/1984046

Text

. ,_ _ _ __,_._____ _ _ _ _ _ _ _ _ _ _ _ _ _ _

[9* NVq(3 UNITED STATES

f g NUCLEAR REGULATORY COMMISSION

j REGION I

-% ,c 63) PARK AVENUE

%,

          • ,o KING OF PRUSSIA, PENNSYLVAN#419406

DEC 21 19e4 l

'

Docket No. 50-322 .

DESIGNA ORIGINAll

, '

Long Island Lighting Company

ATTN. Mr. John D. Leonard, Jr.

MD$

Certified BT.

.Vice President - Nuclear h

'

P.O. Box 618

Shoreham Nuclear Power Station i

Wading River, New York 11792 i

Gentlemen:

Subject: Inspection No. 50-322/84-46

This refers'to the special team inspection, conducted by Mr. S. V. Pullant of

this office on December 3-7, 1984, at Shoreham Nuclear Power Station, Unit 1, ,

Shoreham, New York, of the safe shutdown capability of the plant in the event l

of a fire and other activities authorized by NRC License No. CPPR-95 and to the '

discussions of our findings held by Mr. Pullani with Mr. W. Steiger of your

staff at the conclusion of the inspection.

'

Areas examined during this inspection are described in the NRC Region I  !

I

Inspection Report which is enclosed with this letter. Within.these areas, the

inspection consisted of selective examinations of procedures and representative

records, inte'rviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were observed. However,

certain activities appear to be deviations from your commitments. In addition,

several issues related to your conforiaance with NRC staff. guidances in BTP

-APCSB 9.5-1, Appendix A and the technical requirements in 10 CFR 50, Appendix R

remained unresolved at the end of the inspection.

With respect to the deviations, we understand that you have instituted appro-

priate interim compensatory measures, as documented in your letter dated

< December 7, lo84 and confirmed in our letter cf the same date, such that you

are now in compliance with the requirements of 10 CFR 50, Appendix A, General

Design Criteria 3. These measures are to remain until permanent corrective

actions are in place. With respect to the deviations and the unresolved issues,

you should evaluate and develop corrective actions for these issues promptly.

. A meeting with the NRC staff during~ the week of January 14, 1985 in Bethesda,

Maryland, to discuss your plan and schedule for implementation has been

established.

You are required to respond to this letter and in preparing your response, you

should follow the instructions in Appendix A.

Information contained within the enclosed inspection report has been discussed '

with Mr. .J. Carney of your staff on December 7,1984. During this discussion,

it was concluded that t5e inspection report contained no information that you

O

d\

'L

_

'

e:,

.. ..

(~

Long Island Lighting Company 2

considered proprietary; therefore a copy of this letter and its enclosures are

being placed in the NRC's Public Document Room.

Your cooperation with us in this matter is appreciated.

Sincerely,

Origimi Pigned Ev a

Stewart L. Pneter

Thomas T. Martin, Director

Division of Engineering and

Technical Programs

Enclosures:

1. Appendix A, Notice of Deviation

2. NRC Region I Inspection Report

No. 50-322/84-46

cc w/encis: /

W. Steiger, Plant Manager /

Brian McCaffrey, Manager l Compliance and Safety 7

Director, Power Division /, Nuc ear

Edward M. Barrett, Esq./7

Jeffrey L. Futter, Esqt j 7

T.F.Gerecke, Manager,QADepa7tment

Shoreham Hearing Service List

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector /

State of New York /

T-

OFFICIAL RECORD COPY DL50-322/84-46 - 0002.0.0 g(r,0

12/19/84

.. . - - . - . - . . . . -

_ _ - . _ _ _ _ _ - _ . _ -_

'

'

,s .

Long Island Lighting Company 3

bec w/encls:

Region I Docket Room with concurrences)

C. J. Anderson, RI -

S.V.Pu11ani,RI(3 copies)!

D. Kubicki, CMEB, NRR

L. Whitney, DQASIP, IE /

J. Wermeil, ASB/NRR v

H. Thomas, BNL /

A. Fresco, BNL

R. Caruso, LPM (Shoreham), LB-2/NRR/

V. Benoroya, CMEB/NRR /

Senior Operationy Officer (w/o encis)

Director, DETP 7 /

ection Chief /

J.Strosnider,DPR/P

B. Bordenick, ELD

R. Goddard, - ELD /

.

1

,

y

'

.RI:DETP RI ETP RI:DETP

Pu11ani/ms Anderson Ebneter

12/19/84 12/j9 /84 12/f/84

0FFICIAL RECORD COPY DL50-322/84-46 - 0003.0.0