ML20140E178
| ML20140E178 | |
| Person / Time | |
|---|---|
| Site: | Shoreham File:Long Island Lighting Company icon.png |
| Issue date: | 12/21/1984 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Leonard J LONG ISLAND LIGHTING CO. |
| Shared Package | |
| ML20140E184 | List: |
| References | |
| NUDOCS 8501100605 | |
| Download: ML20140E178 (3) | |
See also: IR 05000322/1984046
Text
.
,_
_
_
__,_._____
_ _ _ _ _ _ _ _ _ _ _ _ _ _
[9* NVq(
3
UNITED STATES
f
g
NUCLEAR REGULATORY COMMISSION
j
REGION I
-%
,c
63) PARK AVENUE
%, ***** ,o
KING OF PRUSSIA, PENNSYLVAN#419406
DEC 21 19e4
'
Docket No. 50-322
.
DESIGNA
ORIGINAll
Long Island Lighting Company
MD$
, '
ATTN. Mr. John D. Leonard, Jr.
Certified BT.
.Vice President - Nuclear
h
'
P.O. Box 618
Shoreham Nuclear Power Station
i
Wading River, New York 11792
i
Gentlemen:
Subject:
Inspection No. 50-322/84-46
This refers'to the special team inspection, conducted by Mr. S. V. Pullant of
this office on December 3-7, 1984, at Shoreham Nuclear Power Station, Unit 1,
Shoreham, New York, of the safe shutdown capability of the plant in the event
,
of a fire and other activities authorized by NRC License No. CPPR-95 and to the
'
discussions of our findings held by Mr. Pullani with Mr. W. Steiger of your
staff at the conclusion of the inspection.
'
Areas examined during this inspection are described in the NRC Region I
Inspection Report which is enclosed with this letter. Within.these areas, the
inspection consisted of selective examinations of procedures and representative
records, inte'rviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were observed.
However,
certain activities appear to be deviations from your commitments.
In addition,
several issues related to your conforiaance with NRC staff. guidances in BTP
-APCSB 9.5-1, Appendix A and the technical requirements in 10 CFR 50, Appendix R
remained unresolved at the end of the inspection.
With respect to the deviations, we understand that you have instituted appro-
priate interim compensatory measures, as documented in your letter dated
< December 7, lo84 and confirmed in our letter cf the same date, such that you
are now in compliance with the requirements of 10 CFR 50, Appendix A, General
Design Criteria 3.
These measures are to remain until permanent corrective
actions are in place. With respect to the deviations and the unresolved issues,
you should evaluate and develop corrective actions for these issues promptly.
. A meeting with the NRC staff during~ the week of January 14, 1985 in Bethesda,
Maryland, to discuss your plan and schedule for implementation has been
established.
You are required to respond to this letter and in preparing your response, you
should follow the instructions in Appendix A.
Information contained within the enclosed inspection report has been discussed
'
with Mr. .J. Carney of your staff on December 7,1984.
During this discussion,
it was concluded that t5e inspection report contained no information that you
O
d\\
'L
_
'
(~
e:,
..
..
Long Island Lighting Company
2
considered proprietary; therefore a copy of this letter and its enclosures are
being placed in the NRC's Public Document Room.
Your cooperation with us in this matter is appreciated.
Sincerely,
Origimi Pigned Ev a
Stewart L. Pneter
Thomas T. Martin, Director
Division of Engineering and
Technical Programs
Enclosures:
1.
Appendix A, Notice of Deviation
2.
NRC Region I Inspection Report
No. 50-322/84-46
cc w/encis:
/
W. Steiger, Plant Manager /
7
Brian McCaffrey, Manager
l
Compliance and Safety
Director, Power Division /, Nuc ear
Edward M. Barrett, Esq./7
Jeffrey L. Futter, Esqt
j
7
T.F.Gerecke, Manager,QADepa7tment
Shoreham Hearing Service List
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector /
State of New York /
T-
OFFICIAL RECORD COPY
DL50-322/84-46 - 0002.0.0
g(r,0
12/19/84
..
. - - .
-
.
-
.
. . . -
_ _ - . _ _ _ _ _ - _ .
_
-_
'
'
,s
.
Long Island Lighting Company
3
bec w/encls:
Region I Docket Room with concurrences)
C. J. Anderson, RI
-
S.V.Pu11ani,RI(3 copies)!
D. Kubicki, CMEB, NRR
L. Whitney, DQASIP, IE /
J. Wermeil, ASB/NRR v
H. Thomas, BNL /
A. Fresco, BNL
R. Caruso, LPM (Shoreham), LB-2/NRR/
V. Benoroya, CMEB/NRR /
Senior Operationy Officer (w/o encis)
Director, DETP 7
/
ection Chief /
J.Strosnider,DPR/P
B. Bordenick, ELD
R. Goddard, - ELD /
.
1
,
y
'
.RI:DETP
RI
ETP
RI:DETP
Pu11ani/ms
Anderson
Ebneter
12/19/84
12/j9 /84
12/f/84
0FFICIAL RECORD COPY
DL50-322/84-46 - 0003.0.0
12/19/84
l
k
1