Forwards Exam Rept 50-400/OL-85-02 of Exam Administered on 851104-07 & 12-15.Summary of Exam Results & Exam Questions & Answer Key Also Encl
ML20140C676
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 01/15/1986
From: Verrelli D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML20140C681 List:
References
NUDOCS 8601280384
Download: ML20140C676 (2)


Text

.

1 January 15, 1986 Carolina Power and Light Company ATTN: Mr. E. E. Utley Senior Executive Vice President 1

Power Supply and Engineering and Construction P. O. Box 1551 Raleigh, NC 27602 Gentlemen:

SUBJECT:

SHEAR 0N HARRIS EXAMINATION REPORT 400/0L-85-02 The NRC administered examinations on November 4-7 and 12-15, 1985, to employees of your company who had applied for licenses to operate the Shearon Harris Nuclear Plant.

At the conclusion of the examinations, the examination questions and preliminary findings were discussed with those members of your staff identified in the Examination Report, Enclosure 1.

A table summarizing the examination results for each examined individual is provided as Enclosure 2.

Copies of the written examination questions and answer key are included in this report as Enclosure 3.

In accordance with 10 CFR 2.790(a), a copy of this letter and Enclosures 1 and 3

. will be placed in NRC's Public Document Room. is exempt from public disclosure pursuant to 10 CFR 2.790(a) and will not be sent to the Public Document Room.

Should you have any questions concerning this letter, please contact us.

Sincerely, (Original signed by V.W.Panciera, for)

David M. Verrelli, Chief Reactor Projects Branch 1 Division of Reactor Projects

Enclosures:

(See Page 2) khg12so384860115 O

ADOCM 05000400 PDR

{ N&

January 15, 1986

Enclosures:

1.

Examination Report 50-400/0L-85-02 2.

Table of Examination Results (Official Use Only-Privacy Act Information)-

3.

R0/SRO Exam Questions and Answer Key cc w/encls. 1 & 2:

A. C. Tollison, Corporate Training Director J. L. Willis, Plant Manager cc w/encls. 1, 2, & 3:

Howard Smith, Site Training Director bec w/encls. 1, 2, & 3:

Senior Resident Inspector-bec w/ encl.

1:

Project Manager, NRR State of North Carolina EG&G and PNL bec w/encls. 1 & 3:

Operator Licensing Branch, DHFS,NRR Document Control Desk g

RI RI TRogers:ht BAWilson CA3Glian PEFredrickson 1/3/86 1/g/86 1//3 /86 1/(f/86 I