| Site: | Davis Besse |
| Issue date: | 04/07/1997 |
| From: | Caldwell J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Jeffery Wood CENTERIOR ENERGY |
| Shared Package | |
| ML20140C531 | List: |
| References | |
| EA-97-112, NUDOCS 9704170058 | |
| Download: ML20140C528 (2) | |
See also: IR 05000346/1997003
Text
_. _ _
. _ .
_
.. _.
_ _ _ _ . _ _
_ . _ . . _ . .
. _ _ _ _ _ _ _
fuP>de
!
.c
j
56-O/
i
!
)
,
,
l
April'7, 1997
i
d
.
Mr. John K. Wood
Vice President - Nuclear
l
Davis-Besse Nuclear Power Station
j
Centerior Service Company
5501 North State Route 2
Oak Harbor, OH 43449
SUBJECT:
NRC INSPECTION REPORT 50-346/97003; NOTICE OF VIOLATION
,
Dear Mr. Wood:
i
!
The NRC completed an inspection at your Davis-Besse site with preliminary results
i:
presented to members of ycur staff on March 3,1997. The final results were discussed
l
with your staff on March 7,1997. The enclosed report presents the results of that
inspection.
t
1
We noted that operations personnel were, overall, knowledgeable of plant and equipment
i
status, and that this information was appropriately communicated to oncoming shifts. The
}
February 12, reactor downpower was conducted in a controlled, well managed manner.
However, two violations of NRC requirements were identified during this inspection. The
i
first violation involved three examples where approved plant procedures or maintenance
work instructions were not followed as written. As noted in the previous NRC inspection
report (50-346/96014), procedural adherence violations continue to be identified at Davis-
Besse. Your response to this violation should include a discussion of your corrective
1
actions beyond these specific examples, as this appears to be a recurring problem.
!
The second violation involved a failure to perform a technical specification required
- 1
surveillance on the decay heat removal watertight enclosure following its opening.
'
I
Contributing to this violation was a 1985 facility change request (FCR) and its associated
.
safety evaluation that delineated specific requirements related to testing of the enclosure.
I
Those requirements were not adequately addressed during the implementation of the FCR
to assure the technical specifications were revised and/o-
int procedures appropriately
updated.
The two violations are cited in the enclosed Notice of Violation, and the circumstances
surrounding the violations are described in detailin the enclosed report. Please note that
you are required to respond to this letter and should follow the instructions specified in the
enclosed Notice when preparing your response. The NRC will use your response, in part,
to determine whether further enforcement action is necessary to ensure compliance with
regulatory requirements.
l
Bill 5dP55PM
9704170058 970407
Q
ADOCK 05000346
0
,
,
--
. .
-
.- - - . -
.
._
.-
-
- . - .
"
l
' J. K. Wood
-2-
.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter
and its enclosures will be placed in the NRC Public Document Room (PDR).
Sincerely,
/s/ J. A. Grobe for
James L. Caldwell, Director
Division of Reactor Projects
Docket Nos.:
50 346
License No.:
Enclosures:
Inspection Report 50-346/97003
cc w/ encl:
John P. Stetz, Senior
Vice President - Nuclear
J. H. Lash, Plant Manager
j
J. L. Freels, Manager
Regulatory Affairs
State Liaison Officer, State
of Ohio
Robert E. Owen, Ohio
Department of Health
C. A. Glazer, State of Ohio,
Public Utilities Commission
Distribution:
Docket File w/ encl
PUBLIC IE-01 w/ enc!
DRP w/ encl
OC/LFDCB w/enci
SRI Davis Besse w/enci
Project Manager, NRR w/enci
A. B. Beach, w/enci
Rlli Enf. Coordinator, w/enci
Deputy RA, w/enci
CAA1 w/enci (E-mail)
Rill PRR w/enci
l
TSS w/enci
DRS (3) w/ encl
To receive a copy of this document, indicate in the box "C" = Copy without attach /enci
"E" = Copy with attach /enci "N" = No copy
OFFICE
Rlll
Rlli
L*
Rill
Rlll y n // y
m
_
NAME
Sch
Ciayton
f(c-
Jacobs k h k falhdlD
3/ k7 N
3/31/9 7
3/d//h7
/ Y j' [Al/h97
DATE
OFFICIAL RECORD COPY U
"