4 r
TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 374o1 400 Chestnut Street Tower II.
April 26, 1984 -
BLRD-50-438/81-65
- ".l 3 Pl2
- 4 5 BLRD-50-439/81-63
- U.S. Nuclear Regulatory Commission Region II/
Attn:
Mr. James P. O'R6111y, Regional Administrator 101 Marietta Street, NW, Suite 2900
. Atlanta, Georgia 30303
Dear Mr. O'Reilly:
BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 - TURBINE DRIVEN AUXILIARY FEEDWATER-PUMP ROOM TEMPERATURE - BLRD-50-438/81-65, BLRD-50-439/81 FIFTH INTERIM REPORT The subject deficiency was initially reported to ERC-0IE Inspector R. V. Crlenjak on October 6,1981 in accordance with 10 CFR 50.55(e) as NCR BLN BLP 8124. This was followed by our interim reports dated November 3,1981, April 28 and September 7,1982 and June 24, 1983 Enclosed is our fifth interim report. We expect to submit our next report by January 30, 1985..
If you have any questions concerning this matter, please get in touch
.w th R. H. Shell at FTS 858-2688.
{
i Very truly yours, TENNESSEE VALLEY AUTHORITY L. M. Mills, Manager Nuclear Licensing Enclosure oc:
Mr. Richard C. DeYoung, Director (Enclosure)
Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 Records Center (Enclosure)
Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 i
e 8406190228 840426 PDR ADOCK 05000438 y yLCtWOtr(1 8
PDR 1983-TVA 507H ANNIVERSARY p
An Equal Opportunity timployer
ENCLOSURE BELLEFONTE NUCLEAR PLANT UNITS 1 AND 2 TURBINE DRIVEN AUXILIARY FEEDWATER PUMP ROOM TEMPERATURE NCR BLN BLP 8124 BLRD-50-438/81-65, BLRD-50-439/81-63 10 CFR 50.55(e)
FIFTH REPORT Description of Deficiency Additional piping was routed through the turbine-driven auxiliary feedwater pump room.
During extended periods of operating the pump, the turbine-driven auxiliary feedwater pump room maxinum upset temperature of 120 F, as specified in TVA environmental design criteria N4-50-D749, may be exceeded based on the calculated room cooling load. -
Interim Progress
' Engineering change notice (ECN) 1435 was initiated to install ventilation fans and alleviate the problem of possibly exceeding the 120 F design maximum upset temperature in the turbine-driven AFW pump room. All design activities required to incorporate, the requirements of ECN 1435 are complete except for the procurement of equipment. Questions have arisen with regard to the vendor's equipment meeting the procurement contract specifications. TVA will submit a final report upon completion of procurement activities.
t
-